Matalon S F Inc Dba Creation 7 Builders
- Based in
- Walnut Creek
- On San Francisco permits
- Aug 2017 to Jun 2025
- Last 24 months
- 4 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 1448 12th Av | remove (e) rear deck.construct (n) horizontal extension at rear.(n) rear deck, front facade mods, widen garage,(n) windows and doors, interior renovations and excavation work under buiding.Details
remove (e) rear deck.construct (n) horizontal extension at rear.(n) rear deck, front facade mods, widen garage,(n) windows and doors, interior renovations and excavation work under buiding. | $400,000 |
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 1093 19th St | 2 bath remodel like for like. renovation lights and outlets, shower, tub, 2x single vanity.Details
2 bath remodel like for like. renovation lights and outlets, shower, tub, 2x single vanity. | $40,000 |
| Dec 9, 2024 | Completed final sign-off Mar 2025 | 699 Pennsylvania Av | bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.unit 9Details
bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.unit 9 | $9,000 |
| Dec 6, 2024 | Completed final sign-off Mar 2025 | 699 Pennsylvania Av | unit #4: renovation of 2 (e) bathrooms, like for like no removal or addition of walls. no change of layoutDetails
unit #4: renovation of 2 (e) bathrooms, like for like no removal or addition of walls. no change of layout | $25,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 47 Levant St | remove (e) post by the kitchen. remodel like for like (e) bathroom. renovate the (e) fireplace in the livingroom.Details
remove (e) post by the kitchen. remodel like for like (e) bathroom. renovate the (e) fireplace in the livingroom. | $50,000 |
| May 2, 2023 | Completed final sign-off Jul 2023 | 736 Kirkham St | revision to bpa#201910013202, adding (8) wood stairs to outside backyardDetails
revision to bpa#201910013202, adding (8) wood stairs to outside backyard | $3,000 |
| Mar 14, 2023 | Expired or cancelled withdrawn Jul 2023 | 736 Kirkham St | revision to deck layout is 8'2 instead of 7'2.Details
revision to deck layout is 8'2 instead of 7'2. | |
| Aug 29, 2022 | Completed final sign-off Jun 2023 | 724 Peru Av | revise measurements for deck. revision to bpa#202012020060.Details
revise measurements for deck. revision to bpa#202012020060. | |
| Aug 25, 2021 | Never finaled issued Aug 2021, no final | 37 Miraloma Dr | remodeling the extg ktichen: cabinets, relocate appliances. new lights. widening and replacing an extg window in the kitchen. closing & blocking another window.Details
remodeling the extg ktichen: cabinets, relocate appliances. new lights. widening and replacing an extg window in the kitchen. closing & blocking another window. | $60,000 |
| Mar 2, 2021 | Never finaled issued May 2021, no final | 1211 Scott St | remodel 2 kitchens. remove 1 wall. remodel 2 laundry areas.Details
remodel 2 kitchens. remove 1 wall. remodel 2 laundry areas. | $100,000 |
| Dec 2, 2020 | Completed final sign-off Jun 2023 | 724 Peru Av | storage underneath stairs to become laundry room. extend the living room and dining room. relocate water heater and the hvac. modify main entrance, roof, deck. electrical fixtures and flooringDetails
storage underneath stairs to become laundry room. extend the living room and dining room. relocate water heater and the hvac. modify main entrance, roof, deck. electrical fixtures and flooring | $120,000 |
| Mar 2, 2020 | Completed final sign-off May 2020 | 407 Bosworth St | revision to 201910285694. correct description of work. delete upgrade of bath on main floor. only to include fix e pipe in ceiling.Details
revision to 201910285694. correct description of work. delete upgrade of bath on main floor. only to include fix e pipe in ceiling. | |
| Nov 27, 2019 | Completed final sign-off Mar 2020 | 736 Kirkham St | 2 bathroom remodel and 1 new window in main floor. upgrade main electrical panelDetails
2 bathroom remodel and 1 new window in main floor. upgrade main electrical panel | $20,000 |
| Oct 28, 2019 | Completed final sign-off May 2020 | 407 Bosworth St | correction/upgrade of (e) 3rd bathroom, fix pipes in floor, on main floor. replacing the kitchen sink and counter topDetails
correction/upgrade of (e) 3rd bathroom, fix pipes in floor, on main floor. replacing the kitchen sink and counter top | $200 |
| Oct 1, 2019 | Completed final sign-off Jul 2023 | 736 Kirkham St | (n) extension addition of (2) bedroom, (1) bath, foundation & structure work.Details
(n) extension addition of (2) bedroom, (1) bath, foundation & structure work. | $100,000 |
| Sep 19, 2019 | Completed final sign-off May 2020 | 407 Bosworth St | revision to pa #201908057825. foundation structural - first fl.Details
revision to pa #201908057825. foundation structural - first fl. | $5,000 |
| Aug 5, 2019 | Completed final sign-off May 2020 | 407 Bosworth St | create a bedroom - 1 new bathroom and bedroom on 1st floor; construction (framing); remodel 1 bath. new electrical panel upgrade to 200 ampDetails
create a bedroom - 1 new bathroom and bedroom on 1st floor; construction (framing); remodel 1 bath. new electrical panel upgrade to 200 amp | $100,000 |
| Nov 5, 2018 | Completed final sign-off Dec 2018 | 175 Langton St | unit 6. kitchen and master bathroom remodel. like for like replace cabinets, sinks, vanity, toilet, tile, replace tub w/ showerDetails
unit 6. kitchen and master bathroom remodel. like for like replace cabinets, sinks, vanity, toilet, tile, replace tub w/ shower | $25,000 |
| Apr 19, 2018 | Completed final sign-off Jul 2018 | 3166 Baker St | interior alterations: removing one wall between kitchen and living room. kitchen remodeling, redo stucco at the back of house.Details
interior alterations: removing one wall between kitchen and living room. kitchen remodeling, redo stucco at the back of house. | $65,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2018 | 175 Langton St | (1) kitchen and (1.5) bathroom remodel. like for like. maher n/aDetails
(1) kitchen and (1.5) bathroom remodel. like for like. maher n/a | $30,000 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 1260 Haight St | enlarge bathroom by moving non-load bearing wall 17" into closet space to create linen cabinet space, replace tub, sink, toilet, like to like, install 2 gfi outlets, 4 lights, 2 switches, new exhaust fan/light./a ordinance #155-13Details
enlarge bathroom by moving non-load bearing wall 17" into closet space to create linen cabinet space, replace tub, sink, toilet, like to like, install 2 gfi outlets, 4 lights, 2 switches, new exhaust fan/light./a ordinance #155-13 | $10,000 |