Back to bathroom remodel contractors
Matalon S F Inc Dba Creation 7 Builders
- Based in
- Walnut Creek
- On San Francisco permits
- Aug 2017 to Jun 2025
- Last 24 months
- 4 permits filed
21 permits since 2000: 17 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2025 | Completed final sign-off Jun 2025 | 1093 19th St | 2 bath remodel like for like. renovation lights and outlets, shower, tub, 2x single vanity.Details
2 bath remodel like for like. renovation lights and outlets, shower, tub, 2x single vanity. | $40,000 |
| Dec 9, 2024 | Completed final sign-off Mar 2025 | 699 Pennsylvania Av | bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.unit 9Details
bathroom repair due to water damage: shower tile, water proof, drywall patch, re-install vanity toilet, reconnect vanity sink, new shower door, everything will be like to like.unit 9 | $9,000 |
| Dec 6, 2024 | Completed final sign-off Mar 2025 | 699 Pennsylvania Av | unit #4: renovation of 2 (e) bathrooms, like for like no removal or addition of walls. no change of layoutDetails
unit #4: renovation of 2 (e) bathrooms, like for like no removal or addition of walls. no change of layout | $25,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 47 Levant St | remove (e) post by the kitchen. remodel like for like (e) bathroom. renovate the (e) fireplace in the livingroom.Details
remove (e) post by the kitchen. remodel like for like (e) bathroom. renovate the (e) fireplace in the livingroom. | $50,000 |
| Mar 2, 2020 | Completed final sign-off May 2020 | 407 Bosworth St | revision to 201910285694. correct description of work. delete upgrade of bath on main floor. only to include fix e pipe in ceiling.Details
revision to 201910285694. correct description of work. delete upgrade of bath on main floor. only to include fix e pipe in ceiling. | |
| Nov 27, 2019 | Completed final sign-off Mar 2020 | 736 Kirkham St | 2 bathroom remodel and 1 new window in main floor. upgrade main electrical panelDetails
2 bathroom remodel and 1 new window in main floor. upgrade main electrical panel | $20,000 |
| Oct 28, 2019 | Completed final sign-off May 2020 | 407 Bosworth St | correction/upgrade of (e) 3rd bathroom, fix pipes in floor, on main floor. replacing the kitchen sink and counter topDetails
correction/upgrade of (e) 3rd bathroom, fix pipes in floor, on main floor. replacing the kitchen sink and counter top | $200 |
| Oct 1, 2019 | Completed final sign-off Jul 2023 | 736 Kirkham St | (n) extension addition of (2) bedroom, (1) bath, foundation & structure work.Details
(n) extension addition of (2) bedroom, (1) bath, foundation & structure work. | $100,000 |
| Aug 5, 2019 | Completed final sign-off May 2020 | 407 Bosworth St | create a bedroom - 1 new bathroom and bedroom on 1st floor; construction (framing); remodel 1 bath. new electrical panel upgrade to 200 ampDetails
create a bedroom - 1 new bathroom and bedroom on 1st floor; construction (framing); remodel 1 bath. new electrical panel upgrade to 200 amp | $100,000 |
| Nov 5, 2018 | Completed final sign-off Dec 2018 | 175 Langton St | unit 6. kitchen and master bathroom remodel. like for like replace cabinets, sinks, vanity, toilet, tile, replace tub w/ showerDetails
unit 6. kitchen and master bathroom remodel. like for like replace cabinets, sinks, vanity, toilet, tile, replace tub w/ shower | $25,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2018 | 175 Langton St | (1) kitchen and (1.5) bathroom remodel. like for like. maher n/aDetails
(1) kitchen and (1.5) bathroom remodel. like for like. maher n/a | $30,000 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 1260 Haight St | enlarge bathroom by moving non-load bearing wall 17" into closet space to create linen cabinet space, replace tub, sink, toilet, like to like, install 2 gfi outlets, 4 lights, 2 switches, new exhaust fan/light./a ordinance #155-13Details
enlarge bathroom by moving non-load bearing wall 17" into closet space to create linen cabinet space, replace tub, sink, toilet, like to like, install 2 gfi outlets, 4 lights, 2 switches, new exhaust fan/light./a ordinance #155-13 | $10,000 |