Martin Heid Design/Build
- Based in
- Oakland
- On San Francisco permits
- Jun 2007 to Jan 2013
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 12, 2007 | Completed final sign-off Feb 2008 | 2495 03rd St | interior alterations to existing restaurant. new partition walls in bathroom/dining/kitchen. upgrade entry to ada compliant. alterations to plumbing to satisfy health dept codes. no changes to bldg exterior.Details
interior alterations to existing restaurant. new partition walls in bathroom/dining/kitchen. upgrade entry to ada compliant. alterations to plumbing to satisfy health dept codes. no changes to bldg exterior. | $220,000 |