Martin Heid Design/Build
- Based in
- Oakland
- On San Francisco permits
- Jun 2007 to Jan 2013
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 17 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2007 | Completed final sign-off Aug 2007 | 3263 20th St | reduced depth of (e) 2nd floor deck from 15'-10" to 7'-0" max create 1 hour rated wall/railing at property line of deck. add handrail to (e) rear staircase. conform/comply with all requirements of condo conversion. refer to 3r-4639 reportDetails
reduced depth of (e) 2nd floor deck from 15'-10" to 7'-0" max create 1 hour rated wall/railing at property line of deck. add handrail to (e) rear staircase. conform/comply with all requirements of condo conversion. refer to 3r-4639 report | $10,000 |