Back to kitchen remodel contractors
Mars Construction And Remodeling
- Based in
- Concord
- On San Francisco permits
- Aug 2024 to Jul 2026
- Last 24 months
- 12 permits filed
14 permits since 2000: 7 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 2 in progress. Typically 0 days from filing to permit and 187 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2025 | In progress issued Sep 2025 | 64 Sanchez St | revision to pa #202410032291. structural changes and new structural plans; relocation of washer/dryer, kitchen layout update; subpanel relocation, stair case height adjustmentDetails
revision to pa #202410032291. structural changes and new structural plans; relocation of washer/dryer, kitchen layout update; subpanel relocation, stair case height adjustment | $15,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 64 Sanchez St | in-kind kitchen remodel. replace counter, cabinets, sink in the same location.Details
in-kind kitchen remodel. replace counter, cabinets, sink in the same location. | $20,000 |
| Oct 10, 2024 | Completed final sign-off Apr 2025 | 1783 San Jose Av | kitchen remodeling:work will include demolition of existing counter top, cabinets,vinyl flooring,relocation of sink approx 3 ft. install new engineer hard wood flooring,cabinets install appliances install,painting walls/ceiling. install 3 retro-fit windows at existing opening;not visible from streetDetails
kitchen remodeling:work will include demolition of existing counter top, cabinets,vinyl flooring,relocation of sink approx 3 ft. install new engineer hard wood flooring,cabinets install appliances install,painting walls/ceiling. install 3 retro-fit windows at existing opening;not visible from street | $3,200 |