Back to bathroom remodel contractors
Mars Construction And Remodeling
- Based in
- Concord
- On San Francisco permits
- Aug 2024 to Jul 2026
- Last 24 months
- 12 permits filed
14 permits since 2000: 7 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 2 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2026 | In progress issued Jul 2026 | 74 Vista Verde Ct | like for like bathroom remodel update plumbing and electrical up to code.Details
like for like bathroom remodel update plumbing and electrical up to code. | $22,000 |
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 420 Stanyan St | unit 3: remodel two bathrooms, one with shower, one with tub, repair plumbing and electrical as necessary, new flooring in hallways.Details
unit 3: remodel two bathrooms, one with shower, one with tub, repair plumbing and electrical as necessary, new flooring in hallways. | $55,000 |
| Feb 23, 2026 | Completed final sign-off Jul 2026 | 3559 17th St | 2nd floor:work in 3559a 17th st : int bathroom remodel including demo of existing fixture & finishes. installation of new shower pan & waterproofing system. relocation of plumbing fixtures. new electrical & fixtures. install of new vanity & toilet. intall new window & related framing in-kind.Details
2nd floor:work in 3559a 17th st : int bathroom remodel including demo of existing fixture & finishes. installation of new shower pan & waterproofing system. relocation of plumbing fixtures. new electrical & fixtures. install of new vanity & toilet. intall new window & related framing in-kind. | $30,000 |
| Feb 3, 2026 | Completed final sign-off Aug 2026 | 156 San Juan Av | new heat pump. bathroom remodel. provide min 3" support pad for hpDetails
new heat pump. bathroom remodel. provide min 3" support pad for hp | $27,230 |
| Dec 3, 2025 | Completed final sign-off Feb 2026 | 2722 Judah St | bathroom remodel w/ removal of partition non-load bearing walls,doors (e) shower enclosure,vanity,toilet & closet.relocation of vanity,large showers,(n) toilet,washer& dryer. (n) tile vanity,lights mirrors,plumbing fixtures,paint,gfci outlets,ceiling fan w/ humidity sensor.Details
bathroom remodel w/ removal of partition non-load bearing walls,doors (e) shower enclosure,vanity,toilet & closet.relocation of vanity,large showers,(n) toilet,washer& dryer. (n) tile vanity,lights mirrors,plumbing fixtures,paint,gfci outlets,ceiling fan w/ humidity sensor. | $34,000 |
| Oct 16, 2024 | Completed final sign-off Feb 2025 | 340 Ritch St | unit 5: addition of half bath on the lower level with new vanity, fan, lights, switches, toilet. includes 2 walls and one door.Details
unit 5: addition of half bath on the lower level with new vanity, fan, lights, switches, toilet. includes 2 walls and one door. | $15,000 |
| Oct 3, 2024 | In progress issued Oct 2024 | 64 Sanchez St | addition of staircase, raise ceiling with 2 new skylights, and bathroom additionDetails
addition of staircase, raise ceiling with 2 new skylights, and bathroom addition | $50,000 |