Magnolia Development Inc.
- Based in
- Berkeley
- On San Francisco permits
- Jul 2011 to Sep 2026
- Last 24 months
- 3 permits filed
43 permits since 2000: 38 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 7 completed. Typically 36 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2023 | Completed final sign-off Oct 2024 | 1352 45th Av | revision to pa: 202206176628, as requested by dbi field inspector. revision for steel beam, lower sub-floor at l2 bath, dowls at existing footing, raised header vent discharge, stairway repair, delete 2 rear deck from project. relocate north parapetDetails
revision to pa: 202206176628, as requested by dbi field inspector. revision for steel beam, lower sub-floor at l2 bath, dowls at existing footing, raised header vent discharge, stairway repair, delete 2 rear deck from project. relocate north parapet | |
| Dec 14, 2022 | Completed final sign-off Aug 2023 | 40 De Soto St | down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard)Details
down to the stair remodel of the (e) kitchen and family room. included in the remodel are new windows and doors @ the rear facing elevation (yard) | $75,000 |
| Jun 8, 2021 | Completed final sign-off Apr 2022 | 478 47th Av | this project includes an addition within the extg ground level, including a master bedroom, master bathroom, family room and laundry alcove off the extg stairs and hallway. extg one car garage will remain, as well as the extg stairs from the main living level.Details
this project includes an addition within the extg ground level, including a master bedroom, master bathroom, family room and laundry alcove off the extg stairs and hallway. extg one car garage will remain, as well as the extg stairs from the main living level. | $180,000 |
| Nov 6, 2017 | Completed final sign-off Sep 2020 | 646 03rd Av | horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes aDetails
horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes a | $250,000 |
| Jan 22, 2016 | Completed final sign-off Jul 2016 | 3409 Pacific Av | new structural work to garage area, steel, concrete. add bath, reincorporate old staircase, move laundry from upstairs, renovateDetails
new structural work to garage area, steel, concrete. add bath, reincorporate old staircase, move laundry from upstairs, renovate | $160,000 |
| Nov 21, 2014 | Completed final sign-off Nov 2018 | 201 College Av | (n) fully sprinklered system for building. addition of approx 440 sq ft to (e) house. addition will create an additional story to the house. the (e) house will be remodeled to match it w/ the (n) addition; the stair is also being relocated to maximize the usage of the house.Details
(n) fully sprinklered system for building. addition of approx 440 sq ft to (e) house. addition will create an additional story to the house. the (e) house will be remodeled to match it w/ the (n) addition; the stair is also being relocated to maximize the usage of the house. | $300,000 |
| Feb 7, 2012 | Completed final sign-off Jul 2012 | 2244 Mason St | repair back stairs less than 50%, not visable from street.Details
repair back stairs less than 50%, not visable from street. | $3,000 |