Back to bathroom remodel contractors
Magnolia Development Inc.
- Based in
- Berkeley
- On San Francisco permits
- Jul 2011 to Sep 2026
- Last 24 months
- 3 permits filed
43 permits since 2000: 38 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 15 completed, 1 in progress. Typically 14 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 38 Idora Av | remodel existing kitchen and bathroom. new kitchen cabinets, counters and appliances. new bathroom finishes and plumbing fixtures. replace existing kitchen and bathroom windows at side yard, not visible from the street.Details
remodel existing kitchen and bathroom. new kitchen cabinets, counters and appliances. new bathroom finishes and plumbing fixtures. replace existing kitchen and bathroom windows at side yard, not visible from the street. | $150,000 |
| Nov 7, 2023 | Completed final sign-off Oct 2024 | 1352 45th Av | revision to pa: 202206176628, as requested by dbi field inspector. revision for steel beam, lower sub-floor at l2 bath, dowls at existing footing, raised header vent discharge, stairway repair, delete 2 rear deck from project. relocate north parapetDetails
revision to pa: 202206176628, as requested by dbi field inspector. revision for steel beam, lower sub-floor at l2 bath, dowls at existing footing, raised header vent discharge, stairway repair, delete 2 rear deck from project. relocate north parapet | |
| Apr 6, 2023 | Completed final sign-off Dec 2023 | 237 Grattan St | add bathroom to upper floor master bedroom. remove e fireplace, add closetDetails
add bathroom to upper floor master bedroom. remove e fireplace, add closet | $20,000 |
| Jun 17, 2022 | Completed final sign-off Oct 2024 | 1352 45th Av | voluntary structural strengthening. partial tunnel infill legalize extg level 1 bath & bedroom. kitchen remodel. level 2 bath remodel. rear only -new window, new siding, new skylight, new solar pv & thermal.Details
voluntary structural strengthening. partial tunnel infill legalize extg level 1 bath & bedroom. kitchen remodel. level 2 bath remodel. rear only -new window, new siding, new skylight, new solar pv & thermal. | $360,000 |
| Jun 8, 2021 | Completed final sign-off Apr 2022 | 478 47th Av | this project includes an addition within the extg ground level, including a master bedroom, master bathroom, family room and laundry alcove off the extg stairs and hallway. extg one car garage will remain, as well as the extg stairs from the main living level.Details
this project includes an addition within the extg ground level, including a master bedroom, master bathroom, family room and laundry alcove off the extg stairs and hallway. extg one car garage will remain, as well as the extg stairs from the main living level. | $180,000 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 695 Wisconsin St | kitchen remodel on 1st fl. replace patio door to french doors at rear. replace 2 window at rear. enlarge non-loading bearing opening to dining rm. no loading bearing alter. bathroom remodel on 1st fl.Details
kitchen remodel on 1st fl. replace patio door to french doors at rear. replace 2 window at rear. enlarge non-loading bearing opening to dining rm. no loading bearing alter. bathroom remodel on 1st fl. | $50,000 |
| Feb 8, 2018 | Completed final sign-off May 2021 | 85 Parker Av | convert the existing 368 square foot freestanding garage at the rear yard to become habitable space & become a library with a half bath. accessory to the main house.Details
convert the existing 368 square foot freestanding garage at the rear yard to become habitable space & become a library with a half bath. accessory to the main house. | $100,000 |
| Feb 8, 2018 | Completed final sign-off Apr 2021 | 85 Parker Av | horizontal addition @ rear yard addition & interiror remodel, remove and replace rear yard deck & staris, new windows & plaster siding. bathroom & powder rm remodeled & bath added, relocate laundryDetails
horizontal addition @ rear yard addition & interiror remodel, remove and replace rear yard deck & staris, new windows & plaster siding. bathroom & powder rm remodeled & bath added, relocate laundry | $275,000 |
| Nov 6, 2017 | Completed final sign-off Sep 2020 | 646 03rd Av | horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes aDetails
horizontal addition @ rear yard of 1-fam dwelling. addition includes excavation at lvl 1 to create a family rm, new bath, laundry & rear yard patio. a new interior stair connects 1st & 2nd lvls. lvl 2 includes a remodeled kitchen & powder rm, new deck & interior stairs to rear yard. lvl 3 includes a | $250,000 |
| Oct 3, 2017 | Completed final sign-off Nov 2017 | 10 28th St | re-do bathroom: new fixtures, tiles and new paintDetails
re-do bathroom: new fixtures, tiles and new paint | $5,000 |
| Jul 10, 2017 | Completed final sign-off Oct 2017 | 1339 Waller St | remodel bathroom: replace fixtures, new tileDetails
remodel bathroom: replace fixtures, new tile | $10,000 |
| Mar 24, 2017 | Completed final sign-off May 2017 | 7 Laurel St | bathroom remodel - replace toilet, sink, shower tileDetails
bathroom remodel - replace toilet, sink, shower tile | $5,000 |
| Aug 15, 2016 | Completed final sign-off May 2017 | 1000 Fulton St | basement & 1st fl: revision to permit 2013-0403-3731; slightly different configuration to floor plan of bathroom, bedrooms.Details
basement & 1st fl: revision to permit 2013-0403-3731; slightly different configuration to floor plan of bathroom, bedrooms. | $25,000 |
| Jan 22, 2016 | Completed final sign-off Jul 2016 | 3409 Pacific Av | new structural work to garage area, steel, concrete. add bath, reincorporate old staircase, move laundry from upstairs, renovateDetails
new structural work to garage area, steel, concrete. add bath, reincorporate old staircase, move laundry from upstairs, renovate | $160,000 |
| Feb 17, 2015 | Completed final sign-off Nov 2015 | 1928 Mcallister St | interior alteration to existing family room at gr fl level. modify existing bath and laundry area. voluntary seismic improvements at gr flDetails
interior alteration to existing family room at gr fl level. modify existing bath and laundry area. voluntary seismic improvements at gr fl | $150,000 |
| Apr 3, 2013 | Completed final sign-off May 2017 | 1000 Fulton St | reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath.Details
reconf(e)15 rm guest hotel&1 mgr unit to create 4 add'l hotel rms total 19 rms&1 mgr unit.remodel(e)toilet at guest rm 2. provide(n)accessible guest rm.provide primary entrance ramp,(n)common area toilet. rm#6,8&9 remodel toilet & bath. guest rm #10 provide (n) bath. rm#11 remodel bath. | $130,000 |