- 2 permits filed
56 permits since 2000: 32 completed, 4 in progress, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 5 completed, 4 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 63 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2024 | Completed final sign-off Nov 2025 | 146 Laidley St | replace wood stairs at front with poured-in place-concrete.Details
replace wood stairs at front with poured-in place-concrete. | $28,000 |
| Dec 19, 2019 | Never finaled filed Dec 2019, never issued | 986 Ingerson Av | existing lightwell infill for new bath & stairs. develope basement to new bedroom & bath.Details
existing lightwell infill for new bath & stairs. develope basement to new bedroom & bath. | $100,000 |
| Aug 13, 2018 | Never finaled issued Oct 2018, no final | 170 Pacific Av | unit 21. replace circular stair with new stair. replace in-kind for 3 exitng bathrooms. replae upper cabinets in kitchen only. maher n/aDetails
unit 21. replace circular stair with new stair. replace in-kind for 3 exitng bathrooms. replae upper cabinets in kitchen only. maher n/a | $50,000 |
| Sep 16, 2014 | Never finaled issued Oct 2014, no final | 52 Clarendon Av | revision to appl #2014.0805.3055 - cnage old guardrail to glazed at 1st floor deck, removal of post at 3rd floor stair, replace (e) skylights @ 1st floor deck.Details
revision to appl #2014.0805.3055 - cnage old guardrail to glazed at 1st floor deck, removal of post at 3rd floor stair, replace (e) skylights @ 1st floor deck. | $1,800 |
| Aug 5, 2014 | Never finaled issued Aug 2014, no final | 52 Clarendon Av | replace existing decking & guardrails at all decks, raise property line balc walls to 42". modify int. guardrails at 2, 3 & 4/f stair, replace (e) 3/f stair, combine bedrooms @ 2/f, add storage, modify ext. opening @ 1/f, add window @ 2/fDetails
replace existing decking & guardrails at all decks, raise property line balc walls to 42". modify int. guardrails at 2, 3 & 4/f stair, replace (e) 3/f stair, combine bedrooms @ 2/f, add storage, modify ext. opening @ 1/f, add window @ 2/f | $90,000 |
| Nov 8, 2013 | Expired or cancelled expired Mar 2025 | 1752 Broadway | merge 1754 into 1752 broadway-ref 2013.097d. remove (e) front doors, replace w/ single door & side lights. remove (e) 2/fl wall at stair to connect upper stories. remove (e) 3/fl kitchen and reconficure to (n) bath, closet.Details
merge 1754 into 1752 broadway-ref 2013.097d. remove (e) front doors, replace w/ single door & side lights. remove (e) 2/fl wall at stair to connect upper stories. remove (e) 3/fl kitchen and reconficure to (n) bath, closet. | $35,000 |
| Nov 8, 2013 | Completed final sign-off Dec 2013 | 3010 Pierce St | repair & replace stairs in rear of building to comply with violation #201307101. replace in kind, same location, same size.Details
repair & replace stairs in rear of building to comply with violation #201307101. replace in kind, same location, same size. | $20,000 |
| Jul 12, 2012 | Expired or cancelled expired Mar 2025 | 1752 Broadway | new rear deck, stair, & storage room at 1st floor. new deck at 2nd floor. reconstruct (e) stairs from 3rd to 4th floor. new dormers at 4th floor.Details
new rear deck, stair, & storage room at 1st floor. new deck at 2nd floor. reconstruct (e) stairs from 3rd to 4th floor. new dormers at 4th floor. | $75,000 |
| Feb 3, 2011 | Completed final sign-off Apr 2011 | 780 Dolores St | repair stair after replacement of sewer line beneath. replace side walk repair under pipe (6) 3x3 sections. repair front stair lesss than 50%.Details
repair stair after replacement of sewer line beneath. replace side walk repair under pipe (6) 3x3 sections. repair front stair lesss than 50%. | $20,000 |
| Sep 7, 2010 | Completed final sign-off Apr 2011 | 64 Hartford St | interior remodel @ ground flr. to add halls & bath & 406 sq.ft. habitable space. interior convenience stair between ground & 2nd. flrs. replacement rear exterior stair. removal of (e) north lightwell convenience stair. (n) exit door & removal of (e) garage door curb @ facade.Details
interior remodel @ ground flr. to add halls & bath & 406 sq.ft. habitable space. interior convenience stair between ground & 2nd. flrs. replacement rear exterior stair. removal of (e) north lightwell convenience stair. (n) exit door & removal of (e) garage door curb @ facade. | $170,000 |
| Oct 11, 2006 | Completed final sign-off Nov 2006 | 100 Pierce St | (common area on all 6 condos) repair stair <50%. if >50% bldg insp. may require drawing & city planning review. in kind repair.Details
(common area on all 6 condos) repair stair <50%. if >50% bldg insp. may require drawing & city planning review. in kind repair. | $4,000 |