Mackie Builder
- Based in
- Half Moon Bay
- On San Francisco permits
- Dec 2004 to Jan 2026
- Last 24 months
- 2 permits filed
56 permits since 2000: 32 completed, 4 in progress, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 6 completed, 1 in progress, 2 never finaled, 4 expired or cancelled. Typically 2 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2024 | In progress issued Sep 2024 | 444 Princeton St | add door at rear deck, add bathroom inside envelope of building at rear floor. entry levelDetails
add door at rear deck, add bathroom inside envelope of building at rear floor. entry level | $30,000 |
| Dec 19, 2019 | Never finaled filed Dec 2019, never issued | 986 Ingerson Av | existing lightwell infill for new bath & stairs. develope basement to new bedroom & bath.Details
existing lightwell infill for new bath & stairs. develope basement to new bedroom & bath. | $100,000 |
| Aug 13, 2018 | Never finaled issued Oct 2018, no final | 170 Pacific Av | unit 21. replace circular stair with new stair. replace in-kind for 3 exitng bathrooms. replae upper cabinets in kitchen only. maher n/aDetails
unit 21. replace circular stair with new stair. replace in-kind for 3 exitng bathrooms. replae upper cabinets in kitchen only. maher n/a | $50,000 |
| Dec 15, 2017 | Completed final sign-off Nov 2018 | 625 Broderick St | move kitchen from rear to middle of flat. add shower to bathroom. add 2 beams to proposed kitchen living, front, bed hallway.Details
move kitchen from rear to middle of flat. add shower to bathroom. add 2 beams to proposed kitchen living, front, bed hallway. | $100,000 |
| Sep 23, 2014 | Completed final sign-off Aug 2015 | 135 Forest Side Av | remodel (e) bedroom & bath, add two bedrooms & 2 baths, laundry room, replace/reconfigure doors/windows on rear & sides @ 1st floor.Details
remodel (e) bedroom & bath, add two bedrooms & 2 baths, laundry room, replace/reconfigure doors/windows on rear & sides @ 1st floor. | $75,000 |
| Nov 8, 2013 | Expired or cancelled expired Mar 2025 | 1752 Broadway | merge 1754 into 1752 broadway-ref 2013.097d. remove (e) front doors, replace w/ single door & side lights. remove (e) 2/fl wall at stair to connect upper stories. remove (e) 3/fl kitchen and reconficure to (n) bath, closet.Details
merge 1754 into 1752 broadway-ref 2013.097d. remove (e) front doors, replace w/ single door & side lights. remove (e) 2/fl wall at stair to connect upper stories. remove (e) 3/fl kitchen and reconficure to (n) bath, closet. | $35,000 |
| Oct 31, 2012 | Expired or cancelled expired Mar 2025 | 1752 Broadway | renovate (e) kitchens, bathrooms, bedrooms, (n) bathrooms at first & third floors, seismic upgrade. fire sprinklers under separate permit.Details
renovate (e) kitchens, bathrooms, bedrooms, (n) bathrooms at first & third floors, seismic upgrade. fire sprinklers under separate permit. | $250,000 |
| Apr 25, 2012 | Expired or cancelled expired Mar 2025 | 1752 Broadway | remove wall finishes and floor finishes in 3 bathrooms, non structural demo (remodel 3 bathrooms)Details
remove wall finishes and floor finishes in 3 bathrooms, non structural demo (remodel 3 bathrooms) | $25,000 |
| Jul 28, 2011 | Completed final sign-off May 2012 | 140 Douglass St | install new kitchen, remove closet and toilet, add 1 showers, move master bath, install beam in kitchen.Details
install new kitchen, remove closet and toilet, add 1 showers, move master bath, install beam in kitchen. | $78,000 |
| Sep 7, 2010 | Completed final sign-off Apr 2011 | 64 Hartford St | interior remodel @ ground flr. to add halls & bath & 406 sq.ft. habitable space. interior convenience stair between ground & 2nd. flrs. replacement rear exterior stair. removal of (e) north lightwell convenience stair. (n) exit door & removal of (e) garage door curb @ facade.Details
interior remodel @ ground flr. to add halls & bath & 406 sq.ft. habitable space. interior convenience stair between ground & 2nd. flrs. replacement rear exterior stair. removal of (e) north lightwell convenience stair. (n) exit door & removal of (e) garage door curb @ facade. | $170,000 |
| Jan 15, 2010 | Completed final sign-off Feb 2010 | 780 Dolores St | replace bathroom tile & kitchen counter top, no cabinet alteration, no window or door work. no adding or moving wallsDetails
replace bathroom tile & kitchen counter top, no cabinet alteration, no window or door work. no adding or moving walls | $1,800 |
| Nov 2, 2007 | Expired or cancelled expired Dec 2008 | 195 Beacon St | renovate within existin genvelope, no additions, add 2 bedrooms on g/f, renovate kitchen and bath on upper floor, 2 new window opening @ 2/fDetails
renovate within existin genvelope, no additions, add 2 bedrooms on g/f, renovate kitchen and bath on upper floor, 2 new window opening @ 2/f | $25,000 |
| May 5, 2006 | Completed final sign-off Nov 2006 | 831 14th St | tile bathroom, new toilet, new vanity, new shower value all located at existing.Details
tile bathroom, new toilet, new vanity, new shower value all located at existing. | $8,000 |