Back to kitchen remodel contractors
Mackie Builder
- Based in
- Half Moon Bay
- On San Francisco permits
- Dec 2004 to Jan 2026
- Last 24 months
- 2 permits filed
56 permits since 2000: 32 completed, 4 in progress, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
9 kitchen remodel permits: 4 completed, 1 in progress, 1 never finaled, 3 expired or cancelled. Typically 4 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2024 | In progress issued May 2024 | 444 Princeton St | in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment. need a "green tag" for electrical service equipment. | $50,000 |
| Aug 13, 2018 | Never finaled issued Oct 2018, no final | 170 Pacific Av | unit 21. replace circular stair with new stair. replace in-kind for 3 exitng bathrooms. replae upper cabinets in kitchen only. maher n/aDetails
unit 21. replace circular stair with new stair. replace in-kind for 3 exitng bathrooms. replae upper cabinets in kitchen only. maher n/a | $50,000 |
| Dec 15, 2017 | Completed final sign-off Nov 2018 | 625 Broderick St | move kitchen from rear to middle of flat. add shower to bathroom. add 2 beams to proposed kitchen living, front, bed hallway.Details
move kitchen from rear to middle of flat. add shower to bathroom. add 2 beams to proposed kitchen living, front, bed hallway. | $100,000 |
| Nov 8, 2013 | Expired or cancelled expired Mar 2025 | 1752 Broadway | merge 1754 into 1752 broadway-ref 2013.097d. remove (e) front doors, replace w/ single door & side lights. remove (e) 2/fl wall at stair to connect upper stories. remove (e) 3/fl kitchen and reconficure to (n) bath, closet.Details
merge 1754 into 1752 broadway-ref 2013.097d. remove (e) front doors, replace w/ single door & side lights. remove (e) 2/fl wall at stair to connect upper stories. remove (e) 3/fl kitchen and reconficure to (n) bath, closet. | $35,000 |
| Oct 31, 2012 | Expired or cancelled expired Mar 2025 | 1752 Broadway | renovate (e) kitchens, bathrooms, bedrooms, (n) bathrooms at first & third floors, seismic upgrade. fire sprinklers under separate permit.Details
renovate (e) kitchens, bathrooms, bedrooms, (n) bathrooms at first & third floors, seismic upgrade. fire sprinklers under separate permit. | $250,000 |
| Jul 28, 2011 | Completed final sign-off May 2012 | 140 Douglass St | install new kitchen, remove closet and toilet, add 1 showers, move master bath, install beam in kitchen.Details
install new kitchen, remove closet and toilet, add 1 showers, move master bath, install beam in kitchen. | $78,000 |
| Jan 15, 2010 | Completed final sign-off Feb 2010 | 780 Dolores St | replace bathroom tile & kitchen counter top, no cabinet alteration, no window or door work. no adding or moving wallsDetails
replace bathroom tile & kitchen counter top, no cabinet alteration, no window or door work. no adding or moving walls | $1,800 |
| Nov 2, 2007 | Expired or cancelled expired Dec 2008 | 195 Beacon St | renovate within existin genvelope, no additions, add 2 bedrooms on g/f, renovate kitchen and bath on upper floor, 2 new window opening @ 2/fDetails
renovate within existin genvelope, no additions, add 2 bedrooms on g/f, renovate kitchen and bath on upper floor, 2 new window opening @ 2/f | $25,000 |
| Feb 2, 2006 | Completed final sign-off Jun 2006 | 864 Dolores St | replace cabinets kitchen, remove kitchen at 1st floor & 2nd floor each unit.Details
replace cabinets kitchen, remove kitchen at 1st floor & 2nd floor each unit. | $5,000 |