Back to kitchen remodel contractors
Maars Woodworking And Building Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Feb 2012
- Last 24 months
- 0 permits filed
52 permits since 2000: 44 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2011 | Completed final sign-off Nov 2011 | 66 Cleary Ct | unit 1310:renovate extg kitchen with new cabinets,appliances and new bathrooms vinity. sink in 2 bathrooms. new tile in floor.Details
unit 1310:renovate extg kitchen with new cabinets,appliances and new bathrooms vinity. sink in 2 bathrooms. new tile in floor. | $40,000 |
| May 18, 2011 | Completed final sign-off Nov 2011 | 795 Valencia St | renovate (e) wine bar; remove (e) bar, one wall, and lavatory. new bar, new partitions at kitchen, new lavatory, new grab bars, and signage at restroom.Details
renovate (e) wine bar; remove (e) bar, one wall, and lavatory. new bar, new partitions at kitchen, new lavatory, new grab bars, and signage at restroom. | $21,900 |
| Jun 30, 2010 | Completed final sign-off Sep 2010 | 283 02nd Av | replace kitchen cabinets and sink, install new cabinet, new sink and counter top. no change in appliances except dishwasher. at least 50% high efficacy lighting (by wattage).Details
replace kitchen cabinets and sink, install new cabinet, new sink and counter top. no change in appliances except dishwasher. at least 50% high efficacy lighting (by wattage). | $9,000 |
| Jul 27, 2007 | Completed final sign-off Jan 2008 | 1090 Chestnut St | remodel kitchenDetails
remodel kitchen | $15,000 |
| Jun 20, 2007 | Completed final sign-off Nov 2007 | 2611 Divisadero St | remodel kitchen, open non-bearing wall as detail on drawing, patch walls.Details
remodel kitchen, open non-bearing wall as detail on drawing, patch walls. | $15,000 |
| Jan 24, 2006 | Completed final sign-off May 2006 | 1430 15th Av | 2nd floor kitchen remodel, no footprint changeDetails
2nd floor kitchen remodel, no footprint change | $30,000 |
| Aug 3, 2001 | Completed final sign-off Mar 2002 | 468 Noe St | remodel of one kitchen, two bathrooms, msc wall repair, install hydronic heating system, no change oDetails
remodel of one kitchen, two bathrooms, msc wall repair, install hydronic heating system, no change o | $35,000 |