Back to bathroom remodel contractors
Maars Woodworking And Building Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to Feb 2012
- Last 24 months
- 0 permits filed
52 permits since 2000: 44 completed, 2 never finaled, 6 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2011 | Completed final sign-off Nov 2011 | 66 Cleary Ct | unit 1310:renovate extg kitchen with new cabinets,appliances and new bathrooms vinity. sink in 2 bathrooms. new tile in floor.Details
unit 1310:renovate extg kitchen with new cabinets,appliances and new bathrooms vinity. sink in 2 bathrooms. new tile in floor. | $40,000 |
| Nov 1, 2010 | Completed final sign-off Feb 2011 | 1430 15th Av | remodel lower bathroom. install (n) fixtures, (3) @ same location, (n) tile floor. high efficacy lighting or occupancy sensor control.Details
remodel lower bathroom. install (n) fixtures, (3) @ same location, (n) tile floor. high efficacy lighting or occupancy sensor control. | $15,000 |
| Oct 12, 2010 | Completed final sign-off May 2011 | 65 Norfolk St | unit #5 - replace interior spiral stair with straight run stair, remodel (e) bathroom on loft, new floor, replace 4 windows not visible from street. fire alarm and sprinklers on separate permit if required. field verify. add new structural drawing s1 11/5/10.Details
unit #5 - replace interior spiral stair with straight run stair, remodel (e) bathroom on loft, new floor, replace 4 windows not visible from street. fire alarm and sprinklers on separate permit if required. field verify. add new structural drawing s1 11/5/10. | $15,000 |
| Aug 2, 2010 | Completed final sign-off Feb 2011 | 1430 15th Av | bathroom remodel, all fixtures (bath, toilet & sink) to be replaced and installation at same location & new tile.Details
bathroom remodel, all fixtures (bath, toilet & sink) to be replaced and installation at same location & new tile. | $8,500 |
| Oct 7, 2008 | Completed final sign-off Oct 2008 | 2673 22nd St | convert extg storage closet into full bathroom with toilet, sink and shower. no change in extg structure, walls or electrical. provide plans for bathroom to comply with correction notice and report from pid dated 7-8-2008Details
convert extg storage closet into full bathroom with toilet, sink and shower. no change in extg structure, walls or electrical. provide plans for bathroom to comply with correction notice and report from pid dated 7-8-2008 | $2,200 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 283 02nd Av | to comply with 3r-5234 report of physical inspection . removal of garage bathroom fixtures and shower, demo concrete floor and patch after plumbing is capped. replace drywall and stucco after electrical and plumbing. corrections have been madeDetails
to comply with 3r-5234 report of physical inspection . removal of garage bathroom fixtures and shower, demo concrete floor and patch after plumbing is capped. replace drywall and stucco after electrical and plumbing. corrections have been made | $8,000 |
| May 19, 2008 | Completed final sign-off Sep 2008 | 2671 22nd St | #1- remodel entire bathroom with shower pan, shower enclosure and steam unit. relocate closet and convert ex. living room to bedroom. construct new closet in new bedroom.Details
#1- remodel entire bathroom with shower pan, shower enclosure and steam unit. relocate closet and convert ex. living room to bedroom. construct new closet in new bedroom. | $18,000 |
| Oct 22, 2004 | Completed final sign-off Feb 2005 | 2340 Larkin St | interior remodel only includes master bath,plumbing/new recessed ceiling lighting under seperateDetails
interior remodel only includes master bath,plumbing/new recessed ceiling lighting under seperate | $15,000 |
| Mar 24, 2004 | Completed final sign-off Jul 2004 | 2219 Pacific Av | remodel bathroom & new crown molding in bedroom.no structural worksDetails
remodel bathroom & new crown molding in bedroom.no structural works | $25,000 |
| Jun 16, 2003 | Completed final sign-off Oct 2003 | 345 Ewing Tr | first floor bathroom remodel and flat skylight roofDetails
first floor bathroom remodel and flat skylight roof | $30,000 |
| Feb 13, 2003 | Completed final sign-off Apr 2003 | 805 York St | remodeling bathroom w/no tub and replace existng windowDetails
remodeling bathroom w/no tub and replace existng window | $20,000 |
| Feb 7, 2003 | Completed final sign-off Apr 2003 | 805 York St | demolition of bathroom (remodel bath)Details
demolition of bathroom (remodel bath) | $4,739 |
| Nov 8, 2001 | Expired or cancelled expired Jan 2003 | 826 Valencia St | retail tenant improvement. addd hc bathroom & lighting. no mechanical work, no evelope work.Details
retail tenant improvement. addd hc bathroom & lighting. no mechanical work, no evelope work. | $20,000 |
| Aug 3, 2001 | Completed final sign-off Mar 2002 | 468 Noe St | remodel of one kitchen, two bathrooms, msc wall repair, install hydronic heating system, no change oDetails
remodel of one kitchen, two bathrooms, msc wall repair, install hydronic heating system, no change o | $35,000 |