Maan Global Development
- Based in
- Burlingame
- On San Francisco permits
- Dec 2013 to Feb 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 23 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 108 days from filing to permit and 714 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2015 | Completed final sign-off Apr 2017 | 3662 Folsom St | conversion of rear portion of garage & crawl space into condtn space.add 1 n bath & game rm. relocate 1 bdrm frm 3rd f to 1st fl, (n conditioned space) proposed interior remodel at 2nd fl by relocating the kchn & bath. 3rd fl by adding 1 n bath removing the rear stairs. nw roof deck at top roof.Details
conversion of rear portion of garage & crawl space into condtn space.add 1 n bath & game rm. relocate 1 bdrm frm 3rd f to 1st fl, (n conditioned space) proposed interior remodel at 2nd fl by relocating the kchn & bath. 3rd fl by adding 1 n bath removing the rear stairs. nw roof deck at top roof. | $300,000 |
| Mar 25, 2015 | Completed final sign-off Mar 2017 | 583 Moultrie St | proposed conversion of (e) storage to conditioned living space at 1st fl. proposed interior remodel and alteration. structural upgrade, proposed new below grade patio; reconstruction rear stairs. all work to be performed within existing boundry of building per plan.Details
proposed conversion of (e) storage to conditioned living space at 1st fl. proposed interior remodel and alteration. structural upgrade, proposed new below grade patio; reconstruction rear stairs. all work to be performed within existing boundry of building per plan. | $150,000 |
| Nov 19, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | legalization of attic space, addition of (n) stairs from 2/f to attic space, two (n) skylights @ attic.Details
legalization of attic space, addition of (n) stairs from 2/f to attic space, two (n) skylights @ attic. | $50,000 |
| Dec 31, 2013 | Completed final sign-off Sep 2017 | 865 Rhode Island St | remodel + addition to single family dwelling: expand habitable space at 1st flr level, remove (e) rear decks+ stairs, add 3rd story rear addition to rear set back line, add 2nd story 'pop-out' addition at rear, remove (e) gable roof + rebuild as flat roof structure (n) front wall at 3rd flr not toDetails
remodel + addition to single family dwelling: expand habitable space at 1st flr level, remove (e) rear decks+ stairs, add 3rd story rear addition to rear set back line, add 2nd story 'pop-out' addition at rear, remove (e) gable roof + rebuild as flat roof structure (n) front wall at 3rd flr not to | $446,795 |