Back to bathroom remodel contractors
Maan Global Development
- Based in
- Burlingame
- On San Francisco permits
- Dec 2013 to Feb 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 23 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 never finaled. Typically 13 days from filing to permit and 431 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 1034 Clement St | kitchen and bathroom in-place, in-kind remodel. new water heater replacement, new furnace replacement.Details
kitchen and bathroom in-place, in-kind remodel. new water heater replacement, new furnace replacement. | $50,000 |
| Oct 7, 2020 | Completed final sign-off Mar 2022 | 1554 20th Av | add new habitable space at garage level. interior renovation to (e) sfd. convert rear part of 1st flr into habitable space to incl 2 bedrms, 2 baths and a fam rm. reconfigure 2nd flr layout, add 1 bedrm & 1 bath. infill lightwell at north sides. (n) skylights.Details
add new habitable space at garage level. interior renovation to (e) sfd. convert rear part of 1st flr into habitable space to incl 2 bedrms, 2 baths and a fam rm. reconfigure 2nd flr layout, add 1 bedrm & 1 bath. infill lightwell at north sides. (n) skylights. | $80,000 |
| Apr 29, 2019 | Never finaled issued Apr 2019, no final | 1029 York St | remodel one bathroom , replace one window in the bathroom non street facing same size same location max ufaftor 0.32Details
remodel one bathroom , replace one window in the bathroom non street facing same size same location max ufaftor 0.32 | $10,000 |
| Aug 10, 2017 | Completed final sign-off Oct 2022 | 1621 Diamond St | horizontal/vertical addition to (e) single family house. add (2) (n) bath. add (2) (n) half bath.Details
horizontal/vertical addition to (e) single family house. add (2) (n) bath. add (2) (n) half bath. | $400,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2016 | 1723 09th Av | remodel a bathroom and a half bath at 1st floor. make opening between bedroom 1 and bedroom 2. no work at basement or exteriorDetails
remodel a bathroom and a half bath at 1st floor. make opening between bedroom 1 and bedroom 2. no work at basement or exterior | $15,000 |
| Sep 24, 2015 | Completed final sign-off Apr 2017 | 3662 Folsom St | conversion of rear portion of garage & crawl space into condtn space.add 1 n bath & game rm. relocate 1 bdrm frm 3rd f to 1st fl, (n conditioned space) proposed interior remodel at 2nd fl by relocating the kchn & bath. 3rd fl by adding 1 n bath removing the rear stairs. nw roof deck at top roof.Details
conversion of rear portion of garage & crawl space into condtn space.add 1 n bath & game rm. relocate 1 bdrm frm 3rd f to 1st fl, (n conditioned space) proposed interior remodel at 2nd fl by relocating the kchn & bath. 3rd fl by adding 1 n bath removing the rear stairs. nw roof deck at top roof. | $300,000 |
| Oct 16, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | reconfigure interior stairwell from 1st level to 3rd level. remodel interior for all levels. remodel existing bath at basement. relocate kitchen and bath ond 2nd fl. reconfigure rooms. reconfigure 3rd fl, new skylight per plan.Details
reconfigure interior stairwell from 1st level to 3rd level. remodel interior for all levels. remodel existing bath at basement. relocate kitchen and bath ond 2nd fl. reconfigure rooms. reconfigure 3rd fl, new skylight per plan. | $50,000 |
| Aug 6, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | legalize 450 sf on basement consisting of 1 full bath, 1 bar sink, 1 guest bedroom, 1 entertainment room, relocate washer and dryerDetails
legalize 450 sf on basement consisting of 1 full bath, 1 bar sink, 1 guest bedroom, 1 entertainment room, relocate washer and dryer | $30,000 |
| Feb 19, 2014 | Completed final sign-off Feb 2015 | 535 Gates St | 1)add living room and powder room on 1st floor. 2) relocated kitchen and dining room from 2nd floor to 1st floor. 3)add one bedroom and bathroom on 2nd floor. 4)bathroom remodel on 2nd floor per plan.Details
1)add living room and powder room on 1st floor. 2) relocated kitchen and dining room from 2nd floor to 1st floor. 3)add one bedroom and bathroom on 2nd floor. 4)bathroom remodel on 2nd floor per plan. | $58,000 |