Back to kitchen remodel contractors
Maan Global Development
- Based in
- Burlingame
- On San Francisco permits
- Dec 2013 to Feb 2026
- Last 24 months
- 2 permits filed
28 permits since 2000: 23 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 7 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | Completed final sign-off Jun 2026 | 1034 Clement St | kitchen and bathroom in-place, in-kind remodel. new water heater replacement, new furnace replacement.Details
kitchen and bathroom in-place, in-kind remodel. new water heater replacement, new furnace replacement. | $50,000 |
| Oct 16, 2014 | Completed final sign-off Jun 2017 | 372 Richland Av | reconfigure interior stairwell from 1st level to 3rd level. remodel interior for all levels. remodel existing bath at basement. relocate kitchen and bath ond 2nd fl. reconfigure rooms. reconfigure 3rd fl, new skylight per plan.Details
reconfigure interior stairwell from 1st level to 3rd level. remodel interior for all levels. remodel existing bath at basement. relocate kitchen and bath ond 2nd fl. reconfigure rooms. reconfigure 3rd fl, new skylight per plan. | $50,000 |
| Feb 19, 2014 | Completed final sign-off Feb 2015 | 535 Gates St | 1)add living room and powder room on 1st floor. 2) relocated kitchen and dining room from 2nd floor to 1st floor. 3)add one bedroom and bathroom on 2nd floor. 4)bathroom remodel on 2nd floor per plan.Details
1)add living room and powder room on 1st floor. 2) relocated kitchen and dining room from 2nd floor to 1st floor. 3)add one bedroom and bathroom on 2nd floor. 4)bathroom remodel on 2nd floor per plan. | $58,000 |