Back to kitchen remodel contractors
M N Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to May 2026
- Last 24 months
- 11 permits filed
105 permits since 2000: 81 completed, 11 in progress, 7 never finaled, 6 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 19 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | In progress issued Jun 2026 | 155 Noe St | renovation of 3rd/f unit (155 noe) new skylight above kitchen & parapet fire wall protection. kitchen remodel. new tankless water heater in unit to replace existing garageDetails
renovation of 3rd/f unit (155 noe) new skylight above kitchen & parapet fire wall protection. kitchen remodel. new tankless water heater in unit to replace existing garage | $48,000 |
| Mar 19, 2026 | Completed final sign-off Jun 2026 | 2666 44th Av | remodel (e) kitchen & bathroom in kind. replace knob & tube wiring.Details
remodel (e) kitchen & bathroom in kind. replace knob & tube wiring. | $100,000 |
| Jun 20, 2025 | Completed final sign-off Dec 2025 | 663 07th Av | kitchen remodel at rear of 2nd/f. remove e) load bearing wall btw kitchen & living room. install structural beam. 1 e) bath & 1 powder rm remodelDetails
kitchen remodel at rear of 2nd/f. remove e) load bearing wall btw kitchen & living room. install structural beam. 1 e) bath & 1 powder rm remodel | $41,000 |
| Jan 22, 2024 | Completed final sign-off Mar 2025 | 154 Ord St | at rear cottage: replace (e) masonry foundation w/(n) concrete along north property line, to address structural & draingae issues. similar work as front structure per pa# 202305036984. foundation work will require (e) kitchen & bathroom to be replaced in kind.Details
at rear cottage: replace (e) masonry foundation w/(n) concrete along north property line, to address structural & draingae issues. similar work as front structure per pa# 202305036984. foundation work will require (e) kitchen & bathroom to be replaced in kind. | $92,000 |
| Oct 16, 2023 | Completed final sign-off Feb 2024 | 152 Ord St | revision to bpa# 202305036984: remodel (e) kitchen and (e) bathroom due to structural work. additional concrete grade beams to strengthen foundation. (4) voluntary plywood sheerwalls in transverse direction.Details
revision to bpa# 202305036984: remodel (e) kitchen and (e) bathroom due to structural work. additional concrete grade beams to strengthen foundation. (4) voluntary plywood sheerwalls in transverse direction. | |
| Mar 24, 2023 | Completed final sign-off Dec 2023 | 44 07th Av | kitchen remodel of upper unit remodel (e) bathroom & add (1) new bathroom. remove non-structural wall between kitchen & breakfst room. (4) new sky lights. replace all non steet facing windows with vinyl in kind. total 15. replace (3) front windows w/woodDetails
kitchen remodel of upper unit remodel (e) bathroom & add (1) new bathroom. remove non-structural wall between kitchen & breakfst room. (4) new sky lights. replace all non steet facing windows with vinyl in kind. total 15. replace (3) front windows w/wood | $53,000 |
| Mar 16, 2023 | Completed final sign-off May 2025 | 667 07th Av | kitchen & bathroom remodel of 667 & 669 7th av. removal of non-load bearing walls, voluntary lateral strengtheing w/ plywood shear wallsDetails
kitchen & bathroom remodel of 667 & 669 7th av. removal of non-load bearing walls, voluntary lateral strengtheing w/ plywood shear walls | $78,000 |
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Jul 31, 2020 | Completed final sign-off Feb 2021 | 1699 Vallejo St | unit #3: remodel in kind - one kitchen (~8.5'x14') on first floor and two bathrooms (~10.5' x 7.5' and 8' x 6.5) on second floor (new cabinets, flooring, paint, tile, and fixtures). upgrade existing electrical sub panel.Details
unit #3: remodel in kind - one kitchen (~8.5'x14') on first floor and two bathrooms (~10.5' x 7.5' and 8' x 6.5) on second floor (new cabinets, flooring, paint, tile, and fixtures). upgrade existing electrical sub panel. | $100,000 |
| Feb 24, 2017 | Expired or cancelled expired Mar 2026 | 315 Mississippi St | interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl spaceDetails
interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl space | $75,000 |
| Jan 5, 2017 | Completed final sign-off Mar 2018 | 170 Pacific Av | unit #31: remodel kitchen and bathrooms, removing and replacing electrical fixtures, cabinets, doors and flooring.Details
unit #31: remodel kitchen and bathrooms, removing and replacing electrical fixtures, cabinets, doors and flooring. | $75,000 |
| Nov 8, 2016 | Completed final sign-off Nov 2018 | 770 11th Av | interior remodel of existing single family residence. entry level: remove kitchen wall, new windows at e mudroom, new kitchen appliances, cabinetry, new 1/2 bath. upper lvl: remodel closets,bedrooms,expand bath, add new bath fixtures. rear: reconstruction of dry rot stairs to backyard.Details
interior remodel of existing single family residence. entry level: remove kitchen wall, new windows at e mudroom, new kitchen appliances, cabinetry, new 1/2 bath. upper lvl: remodel closets,bedrooms,expand bath, add new bath fixtures. rear: reconstruction of dry rot stairs to backyard. | $260,000 |
| Nov 24, 2015 | Completed final sign-off Apr 2019 | 850 Noe St | interior remodel to include: removal of (e) walls; bathroom & kitchen fixtures, (n) openings for two (n) windows, (n) stairs to attic & conversion of (e) attic space to conditioned space, 2 (n) dormers & skylights. 2 (n) windows & reconfiguration of entry stairs per approved variance.Details
interior remodel to include: removal of (e) walls; bathroom & kitchen fixtures, (n) openings for two (n) windows, (n) stairs to attic & conversion of (e) attic space to conditioned space, 2 (n) dormers & skylights. 2 (n) windows & reconfiguration of entry stairs per approved variance. | $100,000 |
| Nov 13, 2015 | Completed final sign-off Dec 2015 | 1078 Noe St | create a larger opening in non load bearing wall between kitchen and dining room.Details
create a larger opening in non load bearing wall between kitchen and dining room. | $5,000 |
| Apr 20, 2015 | Completed final sign-off Feb 2016 | 670 07th Av | kitchen remodel: remove non-load-bearing walls. relocate sink, new cabinets, new water heater.Details
kitchen remodel: remove non-load-bearing walls. relocate sink, new cabinets, new water heater. | $20,000 |
| May 1, 2014 | Completed final sign-off Oct 2014 | 176 Grattan St | kitchen remodel & removal of walls between kitchen, dining & living rooms.Details
kitchen remodel & removal of walls between kitchen, dining & living rooms. | $25,000 |
| Apr 11, 2014 | Expired or cancelled expired Mar 2016 | 374 Sanchez St | kitchen remodel. remove side walls at side of fireplace. window enlargement. all work at lower unitDetails
kitchen remodel. remove side walls at side of fireplace. window enlargement. all work at lower unit | $20,000 |
| Apr 17, 2013 | Completed final sign-off Aug 2013 | 1 Bartlett St | interior remodel of kitchen and bathroom, removal of kitchen wall. sprinkler and fire alarm under seperate permit if needed.Details
interior remodel of kitchen and bathroom, removal of kitchen wall. sprinkler and fire alarm under seperate permit if needed. | $20,000 |
| Jun 28, 2010 | Completed final sign-off Mar 2011 | 1021 Rhode Island St | foundation upgrade, remodel of lower and upper floor bathroom and kitchen. new interior stairs. enclose lower floor at rear for (n) work room and laundry. add one bedroom on lower floor.Details
foundation upgrade, remodel of lower and upper floor bathroom and kitchen. new interior stairs. enclose lower floor at rear for (n) work room and laundry. add one bedroom on lower floor. | $60,000 |
| Sep 8, 2009 | Completed final sign-off Dec 2009 | 3667 17th St | remodel existing kitchens and add laundry rooms in existing service porch at rear of all three units.Details
remodel existing kitchens and add laundry rooms in existing service porch at rear of all three units. | $30,000 |
| May 28, 2009 | Completed final sign-off Dec 2009 | 1318 Shrader St | interior remodel of (e) residence. remodel includes 2 bathrms, kitchen, laundry rm, closets & reconfiguration of 2 interior stairs. in-fill (e) lightwell shall be in filled. new insulation shall be added throughout. new windows & doors are proposed at rear & not visible from street. m.e.p under perDetails
interior remodel of (e) residence. remodel includes 2 bathrms, kitchen, laundry rm, closets & reconfiguration of 2 interior stairs. in-fill (e) lightwell shall be in filled. new insulation shall be added throughout. new windows & doors are proposed at rear & not visible from street. m.e.p under per | $90,000 |
| Jan 23, 2009 | Completed final sign-off Apr 2009 | 66 Stanyan St | remodel kitchen (replace cabinets, resurface floors, remove non-structural wall, move doorway). remodel bathroom (re-tile, move bathtub, remove shower stall). convert closet to second bathroom (install shower, toilet & sink).Details
remodel kitchen (replace cabinets, resurface floors, remove non-structural wall, move doorway). remodel bathroom (re-tile, move bathtub, remove shower stall). convert closet to second bathroom (install shower, toilet & sink). | $42,000 |
| Apr 20, 2004 | Completed final sign-off Jul 2004 | 4645 19th St | kitchen remodel/replace extg windowsDetails
kitchen remodel/replace extg windows | $7,000 |