M N Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to May 2026
- Last 24 months
- 11 permits filed
105 permits since 2000: 81 completed, 11 in progress, 7 never finaled, 6 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 in progress. Typically 8 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2026 | In progress issued May 2026 | 646 04th Av | replace & reconfigure existing 3-story wood framed rear exterior stair & deck. structure to be extended by 6 ft. install 18 linear ft of fire wall along north property line for deck & stair protection.Details
replace & reconfigure existing 3-story wood framed rear exterior stair & deck. structure to be extended by 6 ft. install 18 linear ft of fire wall along north property line for deck & stair protection. | $46,000 |
| Apr 19, 2018 | Completed final sign-off Sep 2019 | 31 Beulah St | remodel to (e) lower level flat. add master suite at g/f, in-fill addition at master closet. new connecting stair btw 1st & 2nd flrs. demo (e) exterior deck & stair, replace w/new ext stair. relocate w/d and w/h at 3rd flr. no change to footprint or front elevationDetails
remodel to (e) lower level flat. add master suite at g/f, in-fill addition at master closet. new connecting stair btw 1st & 2nd flrs. demo (e) exterior deck & stair, replace w/new ext stair. relocate w/d and w/h at 3rd flr. no change to footprint or front elevation | $80,000 |
| Mar 15, 2012 | Completed final sign-off Jun 2012 | 1022 Lawton St | remodel of front facade trims & front balcony deck w/new beams, posts & kickers.Details
remodel of front facade trims & front balcony deck w/new beams, posts & kickers. | $8,500 |
| Oct 26, 2009 | Completed final sign-off Dec 2009 | 1318 Shrader St | revision to pa# 2009-0528-9298-revision includes replacing (e) deck with new similar deck, additional foundation repairs, raising of a portion of (e) flooring & minor changes to (e) window sizesDetails
revision to pa# 2009-0528-9298-revision includes replacing (e) deck with new similar deck, additional foundation repairs, raising of a portion of (e) flooring & minor changes to (e) window sizes | $6,000 |
| Jul 23, 2009 | Completed final sign-off Feb 2010 | 1669 10th Av | replace (e) rear deck & stairs in kind with new retaining wall & new footing.Details
replace (e) rear deck & stairs in kind with new retaining wall & new footing. | $14,000 |