Ly Construction
- Based in
- Castro Valley
- On San Francisco permits
- Aug 2012 to Aug 2026
- Last 24 months
- 6 permits filed
38 permits since 2000: 32 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 22 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2015 | Completed final sign-off Nov 2015 | 230 16th Av | revision to appl #2015.0713.1276 - set back new deck 3'-0" from property line, eliminated proposed 1-hr rated wall.Details
revision to appl #2015.0713.1276 - set back new deck 3'-0" from property line, eliminated proposed 1-hr rated wall. | |
| Jul 13, 2015 | Completed final sign-off Nov 2015 | 230 16th Av | at rear yard, replace deteriorated (e) stair and deck in kind. replace all front windows with alumi. cladded wood window in kind. construct one level new wood deck 5'6" above grade.Details
at rear yard, replace deteriorated (e) stair and deck in kind. replace all front windows with alumi. cladded wood window in kind. construct one level new wood deck 5'6" above grade. | $8,000 |