Block 1418, lot 039
232 16th Ave
- City’s use
- Multi-Family Residential
- Built
- 1913
- Stories
- 2
- Units
- 2
- Rooms
- 2 bedrooms, 4 bathrooms
- Building
- 2,100 sq ft
- Lot
- 2,506 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 4, 2024 | Completed final sign-off Sep 2025 | 232 16th Av | Ly Construction | 2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets.Details
2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets. | $88,700 |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 230 16th Av | street spaceDetails
street space | ||
| Aug 7, 2015 | Completed final sign-off Nov 2015 | 230 16th Av | Ly Construction | revision to appl #2015.0713.1276 - set back new deck 3'-0" from property line, eliminated proposed 1-hr rated wall.Details
revision to appl #2015.0713.1276 - set back new deck 3'-0" from property line, eliminated proposed 1-hr rated wall. | |
| Jul 13, 2015 | Completed final sign-off Nov 2015 | 230 16th Av | Ly Construction | at rear yard, replace deteriorated (e) stair and deck in kind. replace all front windows with alumi. cladded wood window in kind. construct one level new wood deck 5'6" above grade.Details
at rear yard, replace deteriorated (e) stair and deck in kind. replace all front windows with alumi. cladded wood window in kind. construct one level new wood deck 5'6" above grade. | $8,000 |
| Sep 4, 2013 | Completed final sign-off Sep 2013 | 230 16th Av | Westech Roofing Co | re-roofingDetails
re-roofing | $8,950 |
| Apr 12, 2013 | Completed final sign-off Aug 2013 | 230 16th Av | Ly Construction | at 3rd floor-alterative (e) floor layout including remove & construct interior walls, new fixtures & outlets, new full bathroom, remodel (e) kitchen & bathroom, replace rear windowsDetails
at 3rd floor-alterative (e) floor layout including remove & construct interior walls, new fixtures & outlets, new full bathroom, remodel (e) kitchen & bathroom, replace rear windows | $30,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.