Back to bathroom remodel contractors
Ly Construction
- Based in
- Castro Valley
- On San Francisco permits
- Aug 2012 to Aug 2026
- Last 24 months
- 6 permits filed
38 permits since 2000: 32 completed, 4 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 14 completed, 1 in progress, 1 never finaled. Typically 86 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 23, 2025 | In progress issued Nov 2025 | 88 Godeus St | remodel entire apartment (88 godeus) 2nd/f. new heating system to replace electric baseboard. remodel kitchen & bathroom. new lighting, outlets, electric & sub panelDetails
remodel entire apartment (88 godeus) 2nd/f. new heating system to replace electric baseboard. remodel kitchen & bathroom. new lighting, outlets, electric & sub panel | $50,000 |
| Jan 9, 2025 | Completed final sign-off May 2026 | 95 Ravenwood Dr | legalize bedroom, full bath, and storage room at basement levelDetails
legalize bedroom, full bath, and storage room at basement level | $25,000 |
| Aug 19, 2024 | Completed final sign-off May 2025 | 110 32nd Av | revision to pa#'s 2016-0621-0534, 2022-0211-7868, 2021-0823-6921, 2020-0828-2848 & 2022-0329-1124 alter layout ground fl entry, kitchen & bathroom layout change, remove fire escape, replace patio door with windows on 2nd fl & solarium detailsDetails
revision to pa#'s 2016-0621-0534, 2022-0211-7868, 2021-0823-6921, 2020-0828-2848 & 2022-0329-1124 alter layout ground fl entry, kitchen & bathroom layout change, remove fire escape, replace patio door with windows on 2nd fl & solarium details | $15,000 |
| Jan 4, 2024 | Completed final sign-off Sep 2025 | 232 16th Av | 2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets.Details
2/f, remodel (e) kitchen and bathrooms. remove (e) non bearing wall b/w kithcne and dining room. new light fixtures and outlets. | $88,700 |
| Nov 7, 2023 | Completed final sign-off Nov 2024 | 246 Judah St | remodeling of 2-dwelling units (#1 & #3) in an (e) 4-unit apt w/ commercial space. no new area outside of shell. no structural work. bedroom added to each unit. remodel of bath & kitchen @ each unit.Details
remodeling of 2-dwelling units (#1 & #3) in an (e) 4-unit apt w/ commercial space. no new area outside of shell. no structural work. bedroom added to each unit. remodel of bath & kitchen @ each unit. | $45,000 |
| Jul 20, 2022 | Completed final sign-off Jul 2024 | 2418 21st Av | 1/f: add 1 den, office, media and 1.5 bathroom. 2/f & 3/f: complete interior remodel. front window alum clad wood.Details
1/f: add 1 den, office, media and 1.5 bathroom. 2/f & 3/f: complete interior remodel. front window alum clad wood. | $190,000 |
| Aug 23, 2021 | Completed final sign-off Sep 2025 | 110 32nd Av | interior remodel of kitchen; 2 bathrooms and 1/2 bath. selective demolition of extg brick chimney provide new furnace and relocate tankless water heater. replace all windows in kind; add one side window in basement.Details
interior remodel of kitchen; 2 bathrooms and 1/2 bath. selective demolition of extg brick chimney provide new furnace and relocate tankless water heater. replace all windows in kind; add one side window in basement. | $170,000 |
| Jun 18, 2021 | Completed final sign-off Aug 2022 | 170 Pfeiffer St | remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced.Details
remodel kitchen in kind in unit a & b,remodel powder room in kind in pethouse, remodel master bath & hallway bath in kind in pethouse. no structural work, remodel unit a: one bathroom and kitchen finishes replaced. remodel unit b: one bathroom & kitchen finishes replaced. | $65,000 |
| Nov 20, 2020 | Completed final sign-off Mar 2022 | 271 Vicente St | remodel 1st floor to convert existing space to one bedroom, a family room, and 1-1/2 bathroom.Details
remodel 1st floor to convert existing space to one bedroom, a family room, and 1-1/2 bathroom. | $80,000 |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 2318 Quintara St | 1st floor - (n) bathroom, family, home office, bedroom and laundry room. new recessed entry door and infill (e) lightwell @ (e) stair; 2nd floor - (n) bathroom, remodl (e) bathroom & kitchen, replace front & rear windows and infill (e) stair opening, (n) media room on the 2nd floor.Details
1st floor - (n) bathroom, family, home office, bedroom and laundry room. new recessed entry door and infill (e) lightwell @ (e) stair; 2nd floor - (n) bathroom, remodl (e) bathroom & kitchen, replace front & rear windows and infill (e) stair opening, (n) media room on the 2nd floor. | $49,000 |
| May 16, 2016 | Completed final sign-off Oct 2017 | 3301 Cabrillo St | new half bath and hobby room in 1/f. no work on 2nd & 3rd floor.Details
new half bath and hobby room in 1/f. no work on 2nd & 3rd floor. | $17,000 |
| Nov 24, 2014 | Completed final sign-off Aug 2015 | 3040 25th Av | remodel (e) kitchen and dining; remodel (e) bathroom, new bathroom for master bedroom, and convert (e) dining to bedroom new light fixtures and outlets.Details
remodel (e) kitchen and dining; remodel (e) bathroom, new bathroom for master bedroom, and convert (e) dining to bedroom new light fixtures and outlets. | $30,000 |
| Jun 23, 2014 | Completed final sign-off Feb 2015 | 706 Spruce St | interior alterations, remodel kitchen and bathroom, add 1 bathroom, install new furnace & water heater.Details
interior alterations, remodel kitchen and bathroom, add 1 bathroom, install new furnace & water heater. | $32,000 |
| Sep 9, 2013 | Completed final sign-off Dec 2013 | 105 03rd Av | renovation of existing 2 bathrooms , kitchen and add 25 recessed lights,Details
renovation of existing 2 bathrooms , kitchen and add 25 recessed lights, | $25,000 |
| Apr 12, 2013 | Completed final sign-off Aug 2013 | 230 16th Av | at 3rd floor-alterative (e) floor layout including remove & construct interior walls, new fixtures & outlets, new full bathroom, remodel (e) kitchen & bathroom, replace rear windowsDetails
at 3rd floor-alterative (e) floor layout including remove & construct interior walls, new fixtures & outlets, new full bathroom, remodel (e) kitchen & bathroom, replace rear windows | $30,000 |
| Nov 26, 2012 | Never finaled issued Aug 2015, no final | 372 Sussex St | 2 story rear addition. 2 (n) bedrooms, 1 (n) master bedroom, 1 (n) bath, rear porch deck, roof deck.Details
2 story rear addition. 2 (n) bedrooms, 1 (n) master bedroom, 1 (n) bath, rear porch deck, roof deck. | $40,000 |