Lokman Construction
- Based in
- Petaluma
- On San Francisco permits
- Nov 2001 to Aug 2020
- Last 24 months
- 0 permits filed
27 permits since 2000: 24 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 2 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2018 | Completed final sign-off Mar 2019 | 329 Prospect Av | install handrail at two stairs. replace fire rated door at unit 329. re-vemt dryer to comply with physical inspection report cc-8312. transition dryer duct no more than 6 feet per cmc.Details
install handrail at two stairs. replace fire rated door at unit 329. re-vemt dryer to comply with physical inspection report cc-8312. transition dryer duct no more than 6 feet per cmc. | $2,000 |
| Jun 26, 2012 | Completed final sign-off Mar 2013 | 49 Capra Wy | interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unitDetails
interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unit | $120,000 |