Back to bathroom remodel contractors
Lokman Construction
- Based in
- Petaluma
- On San Francisco permits
- Nov 2001 to Aug 2020
- Last 24 months
- 0 permits filed
27 permits since 2000: 24 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2018 | Completed final sign-off Dec 2018 | 362 Waller St | renovate existing bathroom wiht new fixtures and tiles. no structural work.Details
renovate existing bathroom wiht new fixtures and tiles. no structural work. | $9,000 |
| Jan 30, 2018 | Completed final sign-off May 2018 | 143 Willard North St | renovate existing bathroom including change of (e) layout, window replacement, electical & plumbing works.Details
renovate existing bathroom including change of (e) layout, window replacement, electical & plumbing works. | $10,000 |
| Jun 24, 2016 | Completed final sign-off Nov 2016 | 710 Guerrero St | interior remodel of an existing bedroomand bath on gr fl of 2 story apartment in a 3 story 2 unit building. 1 rear window replaced with sliding doorDetails
interior remodel of an existing bedroomand bath on gr fl of 2 story apartment in a 3 story 2 unit building. 1 rear window replaced with sliding door | $100,000 |
| Feb 29, 2016 | Completed final sign-off May 2016 | 983 Dolores St | renovate existing bathroom, new fixtures & tile, same configuration. high efficacy lighting or controlled by manual-on sensor with high efficacy main light.Details
renovate existing bathroom, new fixtures & tile, same configuration. high efficacy lighting or controlled by manual-on sensor with high efficacy main light. | $10,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 192 Graystone Tr | new counter & lighting in kitchen. replace existing. replace tile in powder room. new tile, lighting, shower fixtures & counter top in master bath. no changes, cosmetic only. no walls to be altered.Details
new counter & lighting in kitchen. replace existing. replace tile in powder room. new tile, lighting, shower fixtures & counter top in master bath. no changes, cosmetic only. no walls to be altered. | $12,000 |
| Nov 4, 2014 | Never finaled issued Nov 2014, no final | 2377 Bay St | renovate (e) master bathroom, no changes to floor plan, replace fixtures & tile. compliance with maher ordinance no 155-13 not required.Details
renovate (e) master bathroom, no changes to floor plan, replace fixtures & tile. compliance with maher ordinance no 155-13 not required. | $12,000 |
| May 21, 2013 | Completed final sign-off Jul 2014 | 335 Joost Av | interior remodel adding a bathroom at basementand on the 1st floor.Details
interior remodel adding a bathroom at basementand on the 1st floor. | $40,000 |
| Sep 26, 2012 | Completed final sign-off Aug 2013 | 51 Capra Wy | remodel kitchen and bathroom & master bathroom. replace fixtures, cabinets, tile, finishes. provide led lighting. kitchen (200 sq.ft), bath (40 sq.ft), master bath (81 sq.ft.) all work on top level of bldg. 50% min. kitchen lighting wattage shall be high efficacy; permanent bathroom lightingDetails
remodel kitchen and bathroom & master bathroom. replace fixtures, cabinets, tile, finishes. provide led lighting. kitchen (200 sq.ft), bath (40 sq.ft), master bath (81 sq.ft.) all work on top level of bldg. 50% min. kitchen lighting wattage shall be high efficacy; permanent bathroom lighting | $42,000 |
| Jun 26, 2012 | Completed final sign-off Mar 2013 | 49 Capra Wy | interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unitDetails
interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unit | $120,000 |
| Mar 30, 2011 | Completed final sign-off Oct 2011 | 335 Joost Av | interior kitchen remodel and adding a bathroom at the basement level with in the extg buildingDetails
interior kitchen remodel and adding a bathroom at the basement level with in the extg building | $65,000 |
| Jan 29, 2002 | Completed final sign-off May 2002 | 3765 Fillmore St | renovate existing bathroom and kitchen. no changeDetails
renovate existing bathroom and kitchen. no change | $18,000 |