Back to kitchen remodel contractors
Lokman Construction
- Based in
- Petaluma
- On San Francisco permits
- Nov 2001 to Aug 2020
- Last 24 months
- 0 permits filed
27 permits since 2000: 24 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2020 | Completed final sign-off Dec 2021 | 1125 Jackson St | renovate e kitchen. no change to footprintDetails
renovate e kitchen. no change to footprint | $15,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 192 Graystone Tr | new counter & lighting in kitchen. replace existing. replace tile in powder room. new tile, lighting, shower fixtures & counter top in master bath. no changes, cosmetic only. no walls to be altered.Details
new counter & lighting in kitchen. replace existing. replace tile in powder room. new tile, lighting, shower fixtures & counter top in master bath. no changes, cosmetic only. no walls to be altered. | $12,000 |
| Jun 21, 2013 | Completed final sign-off Nov 2013 | 2725 Broderick St | remodel existing kitchen. replace appliances, cabinets. reconfigure existing pantry. replace lighting in kitchen and family room. no structural work. no exterior work.Details
remodel existing kitchen. replace appliances, cabinets. reconfigure existing pantry. replace lighting in kitchen and family room. no structural work. no exterior work. | $50,000 |
| Sep 26, 2012 | Completed final sign-off Aug 2013 | 51 Capra Wy | remodel kitchen and bathroom & master bathroom. replace fixtures, cabinets, tile, finishes. provide led lighting. kitchen (200 sq.ft), bath (40 sq.ft), master bath (81 sq.ft.) all work on top level of bldg. 50% min. kitchen lighting wattage shall be high efficacy; permanent bathroom lightingDetails
remodel kitchen and bathroom & master bathroom. replace fixtures, cabinets, tile, finishes. provide led lighting. kitchen (200 sq.ft), bath (40 sq.ft), master bath (81 sq.ft.) all work on top level of bldg. 50% min. kitchen lighting wattage shall be high efficacy; permanent bathroom lighting | $42,000 |
| Jun 26, 2012 | Completed final sign-off Mar 2013 | 49 Capra Wy | interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unitDetails
interior remodel of (e) kitchen & 2 (e) bathrooms, create interior connecting stair from (e) 2nd fl level to new conditioned space of the ground level, which includes a master bedroom, 1 bathroom & closet. install new high eff. furnaces for each unit | $120,000 |
| Mar 30, 2011 | Completed final sign-off Oct 2011 | 335 Joost Av | interior kitchen remodel and adding a bathroom at the basement level with in the extg buildingDetails
interior kitchen remodel and adding a bathroom at the basement level with in the extg building | $65,000 |
| Jan 29, 2002 | Completed final sign-off May 2002 | 3765 Fillmore St | renovate existing bathroom and kitchen. no changeDetails
renovate existing bathroom and kitchen. no change | $18,000 |