Back to kitchen remodel contractors
Lindquist Custom Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Sep 2026
- Last 24 months
- 22 permits filed
188 permits since 2000: 138 completed, 10 in progress, 31 never finaled, 9 expired or cancelled.
Of the 31 never-finaled permits, 3 are 3 to 5 years old, 14 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 19 completed, 4 in progress, 4 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 393 Crestmont Dr | 2/f: removal of existing fire place and associated partition walls, one bearing wall between kitchen and dining, and the addition of new post and beam. no kitchen/bathroom remodel.Details
2/f: removal of existing fire place and associated partition walls, one bearing wall between kitchen and dining, and the addition of new post and beam. no kitchen/bathroom remodel. | $32,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 391 Crestmont Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). | $40,000 |
| Jun 8, 2026 | In progress issued Jun 2026 | 538 Vallejo St | relocate existing kitchen, replace all appliances with electric appliancesDetails
relocate existing kitchen, replace all appliances with electric appliances | $10,000 |
| Jun 5, 2024 | In progress issued Jun 2024 | 18 Garlington Ct | repair and build back from water damage. repair & replace ceiling & wall gyp in kind, flooring. electrical repair, plumbing repair, new exterior windows in kind (2) same size & location. bathroom fixtures & kitchen cabinets with fixtures.Details
repair and build back from water damage. repair & replace ceiling & wall gyp in kind, flooring. electrical repair, plumbing repair, new exterior windows in kind (2) same size & location. bathroom fixtures & kitchen cabinets with fixtures. | $20,000 |
| Oct 28, 2021 | Completed final sign-off Dec 2021 | 20 Whitfield Ct | #1. repair of kitchen, replace cabinets, counter, flooring, drywall.Details
#1. repair of kitchen, replace cabinets, counter, flooring, drywall. | $40,000 |
| Oct 20, 2021 | Completed final sign-off Mar 2022 | 393 Crestmont Dr | remodel of one kitchen and two bathrooms. all fixtures replace. electrical upgrade in kitchen and baths. no structural work. no relocation from one room to another. no framing modification.Details
remodel of one kitchen and two bathrooms. all fixtures replace. electrical upgrade in kitchen and baths. no structural work. no relocation from one room to another. no framing modification. | $50,000 |
| Feb 22, 2021 | Completed final sign-off Nov 2021 | 550 Davis St | unit #19: remodel kitchen, 2 bathrooms, and powder room.Details
unit #19: remodel kitchen, 2 bathrooms, and powder room. | $15,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 21 Cora St | remodel kitchen 100 sq ft and bathroom 48 sq in-kindDetails
remodel kitchen 100 sq ft and bathroom 48 sq in-kind | $27,500 |
| Aug 7, 2019 | Never finaled issued Nov 2019, no final | 2797 16th St | tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included.Details
tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included. | $7,000 |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 1254 11th Av | dry rot repair and e northeast corner of 2nd fl. renovation of e kitchen, removal e walls separating e kitchen from e breakfast nook and pantryDetails
dry rot repair and e northeast corner of 2nd fl. renovation of e kitchen, removal e walls separating e kitchen from e breakfast nook and pantry | $52,000 |
| Mar 17, 2017 | Completed final sign-off Dec 2017 | 579 Los Palmos Dr | kitchen remodeling, replacement of cabinets, countertops, upgrade plumbing & electrical. replacement of bathroom windowDetails
kitchen remodeling, replacement of cabinets, countertops, upgrade plumbing & electrical. replacement of bathroom window | $26,000 |
| Nov 20, 2015 | Never finaled issued Jan 2016, no final | 2200 Jerrold Av | unit# n-install new catering kitchen in (e) warehouse as per plan. (e) office and restrooms to remain. n/a ordinance #155-13Details
unit# n-install new catering kitchen in (e) warehouse as per plan. (e) office and restrooms to remain. n/a ordinance #155-13 | $150,000 |
| Sep 30, 2015 | Expired or cancelled expired Apr 2021 | 584 29th St | add 1 story rear sun room addition with roof terrace. add side addition with new interior stair to basement. remodel kitchen. add 1 bath.Details
add 1 story rear sun room addition with roof terrace. add side addition with new interior stair to basement. remodel kitchen. add 1 bath. | $121,600 |
| Oct 20, 2014 | Completed final sign-off May 2015 | 483 06th Av | remodel kitchen, replace cabinets, counter top, update electrical with plumbing (lighting and control per cec 150(k) in kitchen). remodel bathroom behind kitchen, replace fixtures upgrade electrical/plumbingDetails
remodel kitchen, replace cabinets, counter top, update electrical with plumbing (lighting and control per cec 150(k) in kitchen). remodel bathroom behind kitchen, replace fixtures upgrade electrical/plumbing | $30,000 |
| Jul 14, 2014 | Completed final sign-off Jul 2018 | 1769 Broadway | #9 - kitchen and bathroom remodel. reconfigure walls at kitchen and living room.Details
#9 - kitchen and bathroom remodel. reconfigure walls at kitchen and living room. | $25,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2014 | 1967 Hayes St | kitchen and bathroom remodeling within existing space, replace cabinetry and sinks.Details
kitchen and bathroom remodeling within existing space, replace cabinetry and sinks. | $30,000 |
| Nov 13, 2013 | Completed final sign-off Jun 2014 | 131 Laidley St | removal 3rd floor inteiror replace/relocate kitchen & bath, replace roof deck _ railing @ rear, replace windows + siding @ rear & front.Details
removal 3rd floor inteiror replace/relocate kitchen & bath, replace roof deck _ railing @ rear, replace windows + siding @ rear & front. | $220,000 |
| Aug 5, 2013 | Completed final sign-off Nov 2013 | 1760 Cesar Chavez St | unit l - revision to t.i. pa #2013.04.17.4788: kitchen build out detail mechanical plans & title 24.Details
unit l - revision to t.i. pa #2013.04.17.4788: kitchen build out detail mechanical plans & title 24. | $30,000 |
| Jul 8, 2013 | Completed final sign-off Aug 2013 | 1760 Cesar Chavez St | unit m - convert existing warehouse space to catering kitchen, work involves all plumbing, electrical, mechanical & new finishes.Details
unit m - convert existing warehouse space to catering kitchen, work involves all plumbing, electrical, mechanical & new finishes. | $50,000 |
| Oct 17, 2012 | Completed final sign-off Aug 2014 | 240 Caselli Av | kitchen and bath remodel, add one bathroom to lower level & one bedroom, add fireplace to living room, enclose lightwell ground floor only. re-inforcement of (e) foundationDetails
kitchen and bath remodel, add one bathroom to lower level & one bedroom, add fireplace to living room, enclose lightwell ground floor only. re-inforcement of (e) foundation | $175,000 |
| Apr 27, 2012 | Never finaled issued Apr 2012, no final | 160 Henry St | kitchen and bath remodel with structural work. no change on walls and openings.Details
kitchen and bath remodel with structural work. no change on walls and openings. | $70,000 |
| Jan 19, 2012 | Completed final sign-off Dec 2012 | 534 Vallejo St | interior remodel of building, new kitchen, new bathroom. minor removal of interior partitions. add property line windows at west elevationDetails
interior remodel of building, new kitchen, new bathroom. minor removal of interior partitions. add property line windows at west elevation | $510,000 |
| Mar 15, 2011 | Completed final sign-off Oct 2011 | 954 Haight St | kitchen and bathroom remodelling, electrical and plumbing upgrades in unit. no wall relocation. all fluorencent lighting.Details
kitchen and bathroom remodelling, electrical and plumbing upgrades in unit. no wall relocation. all fluorencent lighting. | $40,000 |
| Jun 22, 2010 | Completed final sign-off Oct 2010 | 250 Tara St | kitchen and bath room remodeling, upgrade plumbing and electrical in kitchen and bathroom only. no wall removals. work on 2nd floorDetails
kitchen and bath room remodeling, upgrade plumbing and electrical in kitchen and bathroom only. no wall removals. work on 2nd floor | $30,000 |
| Apr 12, 2010 | Completed final sign-off Jun 2010 | 307 Vicente St | kitchen and bath remodel. kitchen: elec, plumbing pugrades new cabinets, counters. bath: elec,plumbing upgrades, new fixtures and tile. no strucuralDetails
kitchen and bath remodel. kitchen: elec, plumbing pugrades new cabinets, counters. bath: elec,plumbing upgrades, new fixtures and tile. no strucural | $35,000 |
| Sep 29, 2009 | Completed final sign-off Dec 2009 | 2454 Hyde St | remodel kitchen - replace cabinets, countertops, upgrade plumbing & electrical. two bathroom remodel - replace fixtures, new tiling, upgrade plumbing & electrical at residential unit. no new lighting.Details
remodel kitchen - replace cabinets, countertops, upgrade plumbing & electrical. two bathroom remodel - replace fixtures, new tiling, upgrade plumbing & electrical at residential unit. no new lighting. | $30,000 |
| Aug 12, 2009 | Completed final sign-off Nov 2009 | 26 Newburg St | kitchen & bathroom remodel, upgrade electrical to conform to new code title 24, upgrade plumbing to (e) code. new cabinetry, counter tops, appliances & fixtures. no structural changes under this permit. plumbing & electrical under separate permit.Details
kitchen & bathroom remodel, upgrade electrical to conform to new code title 24, upgrade plumbing to (e) code. new cabinetry, counter tops, appliances & fixtures. no structural changes under this permit. plumbing & electrical under separate permit. | $40,000 |
| Jun 1, 2009 | Completed final sign-off Oct 2009 | 26 Newburg St | relocate beam to facilitate future kitchen and bath remodelDetails
relocate beam to facilitate future kitchen and bath remodel | $8,000 |