Back to bathroom remodel contractors
Lindquist Custom Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Sep 2026
- Last 24 months
- 22 permits filed
188 permits since 2000: 138 completed, 10 in progress, 31 never finaled, 9 expired or cancelled.
Of the 31 never-finaled permits, 3 are 3 to 5 years old, 14 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 33 completed, 4 in progress, 4 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 393 Crestmont Dr | 2/f: removal of existing fire place and associated partition walls, one bearing wall between kitchen and dining, and the addition of new post and beam. no kitchen/bathroom remodel.Details
2/f: removal of existing fire place and associated partition walls, one bearing wall between kitchen and dining, and the addition of new post and beam. no kitchen/bathroom remodel. | $32,000 |
| Aug 31, 2026 | In progress issued Aug 2026 | 391 Crestmont Dr | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 1 shower pan(s). | $40,000 |
| Nov 19, 2025 | In progress issued Nov 2025 | 67 Woodland Av | remodeling of existing bathroom, dividing it in to 2 bathrooms and relocating washer and dryer from garage to the 3rd floor.Details
remodeling of existing bathroom, dividing it in to 2 bathrooms and relocating washer and dryer from garage to the 3rd floor. | $50,000 |
| May 21, 2025 | Completed final sign-off Mar 2026 | 532 Baker St | voluntary strengthening of the beam at the garage level. bathroom expansion of (e) bathroom to include new shower.Details
voluntary strengthening of the beam at the garage level. bathroom expansion of (e) bathroom to include new shower. | $20,000 |
| Jun 5, 2024 | In progress issued Jun 2024 | 18 Garlington Ct | repair and build back from water damage. repair & replace ceiling & wall gyp in kind, flooring. electrical repair, plumbing repair, new exterior windows in kind (2) same size & location. bathroom fixtures & kitchen cabinets with fixtures.Details
repair and build back from water damage. repair & replace ceiling & wall gyp in kind, flooring. electrical repair, plumbing repair, new exterior windows in kind (2) same size & location. bathroom fixtures & kitchen cabinets with fixtures. | $20,000 |
| Oct 26, 2023 | Completed final sign-off Apr 2024 | 406 Haight St | emergency bathroom repairs due to water damage. no change in layout. replacement of cabinets, fixtures, tiling, and painting.Details
emergency bathroom repairs due to water damage. no change in layout. replacement of cabinets, fixtures, tiling, and painting. | $20,000 |
| Oct 26, 2023 | Expired or cancelled expired Jun 2026 | 408 Haight St | emergency (1) bathroom repairs due to water damage. no change in layout. replacement of cabinets, fixtures, tiling, and painting.Details
emergency (1) bathroom repairs due to water damage. no change in layout. replacement of cabinets, fixtures, tiling, and painting. | $20,000 |
| Jan 24, 2023 | Completed final sign-off May 2023 | 536 Bacon St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $20,000 |
| Dec 29, 2022 | Completed final sign-off Dec 2024 | 600 Buchanan St | fire damage repair to partially comply w/ nov 202296831. #600:repair ceiling finishes,drywall,insulation. replace 3 rear windows in kind. #602:replace finishes & 2 windows in kind. relocate bathroom. #604: replace roof framing & finishes in kind. ext. rear deck&stair repair under separate permit.Details
fire damage repair to partially comply w/ nov 202296831. #600:repair ceiling finishes,drywall,insulation. replace 3 rear windows in kind. #602:replace finishes & 2 windows in kind. relocate bathroom. #604: replace roof framing & finishes in kind. ext. rear deck&stair repair under separate permit. | $300,000 |
| Oct 20, 2021 | Completed final sign-off Mar 2022 | 393 Crestmont Dr | remodel of one kitchen and two bathrooms. all fixtures replace. electrical upgrade in kitchen and baths. no structural work. no relocation from one room to another. no framing modification.Details
remodel of one kitchen and two bathrooms. all fixtures replace. electrical upgrade in kitchen and baths. no structural work. no relocation from one room to another. no framing modification. | $50,000 |
| Jul 29, 2021 | Completed final sign-off Sep 2022 | 2779 Diamond St | new bath and laundry room at gr level. new ev charger. voluntary structural strengtheningDetails
new bath and laundry room at gr level. new ev charger. voluntary structural strengthening | $10,000 |
| Apr 14, 2021 | Expired or cancelled expired Apr 2025 | 55 Teresita Bl | convert existing office to guest bedroom. add new bathroom at existing office.Details
convert existing office to guest bedroom. add new bathroom at existing office. | $20,000 |
| Feb 22, 2021 | Completed final sign-off Nov 2021 | 550 Davis St | unit #19: remodel kitchen, 2 bathrooms, and powder room.Details
unit #19: remodel kitchen, 2 bathrooms, and powder room. | $15,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 21 Cora St | remodel kitchen 100 sq ft and bathroom 48 sq in-kindDetails
remodel kitchen 100 sq ft and bathroom 48 sq in-kind | $27,500 |
| Jun 6, 2019 | Completed final sign-off Oct 2019 | 1443 05th Av | remodel of 2 closets in master suite. remodel of 2 bathrooms. all work on 3/f. no structural work. upgrade electrical & plumbing in area of remodel.Details
remodel of 2 closets in master suite. remodel of 2 bathrooms. all work on 3/f. no structural work. upgrade electrical & plumbing in area of remodel. | $80,000 |
| Aug 25, 2017 | Completed final sign-off Dec 2017 | 95 Grand View Av | apt #7: dryrot repair on floor & ceiling joist in bathroom. rebuild in-kind 40sf max.Details
apt #7: dryrot repair on floor & ceiling joist in bathroom. rebuild in-kind 40sf max. | $4,000 |
| Apr 21, 2017 | Completed final sign-off Feb 2018 | 95 Grand View Av | dryrot repairs of interior and exterior walls as needed, extent yet to be determined. exploratory demo of exterior stucco to determine extent of dryrot. demolition & replacement of bathrooms in unit 8, 9 & 10. all work will be replacement in kind. appr. 1,000 sq ftDetails
dryrot repairs of interior and exterior walls as needed, extent yet to be determined. exploratory demo of exterior stucco to determine extent of dryrot. demolition & replacement of bathrooms in unit 8, 9 & 10. all work will be replacement in kind. appr. 1,000 sq ft | $68,000 |
| Mar 17, 2017 | Completed final sign-off Dec 2017 | 579 Los Palmos Dr | kitchen remodeling, replacement of cabinets, countertops, upgrade plumbing & electrical. replacement of bathroom windowDetails
kitchen remodeling, replacement of cabinets, countertops, upgrade plumbing & electrical. replacement of bathroom window | $26,000 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 58 Martha Av | remodeling of upstairs, 2 bathrooms, upgrade elelctrical/replace fixturs/replace tiling.Details
remodeling of upstairs, 2 bathrooms, upgrade elelctrical/replace fixturs/replace tiling. | $25,000 |
| Feb 17, 2016 | Expired or cancelled expired Jul 2017 | 1224 Russia Av | main floor bathroom remodeling, replace all fixtures and retile, upgrade electrical & plumbing, no interior walls remove or altered.Details
main floor bathroom remodeling, replace all fixtures and retile, upgrade electrical & plumbing, no interior walls remove or altered. | $15,000 |
| Sep 30, 2015 | Expired or cancelled expired Apr 2021 | 584 29th St | add 1 story rear sun room addition with roof terrace. add side addition with new interior stair to basement. remodel kitchen. add 1 bath.Details
add 1 story rear sun room addition with roof terrace. add side addition with new interior stair to basement. remodel kitchen. add 1 bath. | $121,600 |
| Apr 15, 2015 | Completed final sign-off Aug 2017 | 1967 Hayes St | to comply with nov# 201527031. develop ground floor rooms into legal residential unit. change occupancy from r-3 to r-2. add nfpa13r sprinkler to entire first fl. add 2 hour rated ceiling entire first floor. modify (e) entry to have 7'-6" ceiling height. 1 bedroom & 1 bath in unit.Details
to comply with nov# 201527031. develop ground floor rooms into legal residential unit. change occupancy from r-3 to r-2. add nfpa13r sprinkler to entire first fl. add 2 hour rated ceiling entire first floor. modify (e) entry to have 7'-6" ceiling height. 1 bedroom & 1 bath in unit. | $50,000 |
| Dec 9, 2014 | Completed final sign-off May 2016 | 124 Pierce St | install 3 new can lights in living room, replace plaster ceiling above dining area, add 2 light boxes for switches. tile rear bathroom floor and shower/tub, existing fixtures to remain except for toilet & sink, replace toilet & sink, repair walls in bathroom from wainscott.Details
install 3 new can lights in living room, replace plaster ceiling above dining area, add 2 light boxes for switches. tile rear bathroom floor and shower/tub, existing fixtures to remain except for toilet & sink, replace toilet & sink, repair walls in bathroom from wainscott. | $10,000 |
| Oct 22, 2014 | Completed final sign-off Jan 2015 | 1605 Haight St | install 19 lights and 6 switches at clothing store on 1st floor; required ada work in bathroomDetails
install 19 lights and 6 switches at clothing store on 1st floor; required ada work in bathroom | $5,000 |
| Oct 20, 2014 | Completed final sign-off May 2015 | 483 06th Av | remodel kitchen, replace cabinets, counter top, update electrical with plumbing (lighting and control per cec 150(k) in kitchen). remodel bathroom behind kitchen, replace fixtures upgrade electrical/plumbingDetails
remodel kitchen, replace cabinets, counter top, update electrical with plumbing (lighting and control per cec 150(k) in kitchen). remodel bathroom behind kitchen, replace fixtures upgrade electrical/plumbing | $30,000 |
| Jul 14, 2014 | Completed final sign-off Jul 2018 | 1769 Broadway | #9 - kitchen and bathroom remodel. reconfigure walls at kitchen and living room.Details
#9 - kitchen and bathroom remodel. reconfigure walls at kitchen and living room. | $25,000 |
| Dec 17, 2013 | Completed final sign-off Jun 2014 | 1967 Hayes St | kitchen and bathroom remodeling within existing space, replace cabinetry and sinks.Details
kitchen and bathroom remodeling within existing space, replace cabinetry and sinks. | $30,000 |
| Nov 13, 2013 | Completed final sign-off Jun 2014 | 131 Laidley St | removal 3rd floor inteiror replace/relocate kitchen & bath, replace roof deck _ railing @ rear, replace windows + siding @ rear & front.Details
removal 3rd floor inteiror replace/relocate kitchen & bath, replace roof deck _ railing @ rear, replace windows + siding @ rear & front. | $220,000 |
| Jun 6, 2013 | Never finaled issued Jun 2013, no final | 1568 Shrader St | remodeling of existing bathroom and water closet on top floorDetails
remodeling of existing bathroom and water closet on top floor | $17,000 |
| Mar 7, 2013 | Completed final sign-off Jun 2014 | 131 Laidley St | remodel interior lower 2 levels. non bearing partitions only. raise floor at 1st,basement. replace rear windows in e opening. deck <10' at rear.new door and window at front and side elevation. e roof deck at 2nd fl, new full bath at fl,reconfigure bedroom, office, gym, and storage at basement.Details
remodel interior lower 2 levels. non bearing partitions only. raise floor at 1st,basement. replace rear windows in e opening. deck <10' at rear.new door and window at front and side elevation. e roof deck at 2nd fl, new full bath at fl,reconfigure bedroom, office, gym, and storage at basement. | $170,000 |
| Dec 21, 2012 | Completed final sign-off Aug 2014 | 240 Caselli Av | revision to appl ##2012.10.17.2205. - enclose staiwell, add bathroom to lower level.Details
revision to appl ##2012.10.17.2205. - enclose staiwell, add bathroom to lower level. | $15,000 |
| Oct 17, 2012 | Completed final sign-off Aug 2014 | 240 Caselli Av | kitchen and bath remodel, add one bathroom to lower level & one bedroom, add fireplace to living room, enclose lightwell ground floor only. re-inforcement of (e) foundationDetails
kitchen and bath remodel, add one bathroom to lower level & one bedroom, add fireplace to living room, enclose lightwell ground floor only. re-inforcement of (e) foundation | $175,000 |
| Apr 27, 2012 | Never finaled issued Apr 2012, no final | 160 Henry St | kitchen and bath remodel with structural work. no change on walls and openings.Details
kitchen and bath remodel with structural work. no change on walls and openings. | $70,000 |
| Jan 19, 2012 | Completed final sign-off Dec 2012 | 534 Vallejo St | interior remodel of building, new kitchen, new bathroom. minor removal of interior partitions. add property line windows at west elevationDetails
interior remodel of building, new kitchen, new bathroom. minor removal of interior partitions. add property line windows at west elevation | $510,000 |
| Oct 3, 2011 | Completed final sign-off Jan 2012 | 307 Vicente St | upgrade existing bar and bath upgrade; replace one door to backyard, upgrade all existing plumbing & electrical to conform to new codes, everything is is some locationDetails
upgrade existing bar and bath upgrade; replace one door to backyard, upgrade all existing plumbing & electrical to conform to new codes, everything is is some location | $30,000 |
| Jun 27, 2011 | Completed final sign-off Nov 2011 | 250 Magellan Av | remove non-bearing wall to convert (e) full & 1/2 bath into one master bath. remodel (e) bath. demo & pathc one window @ side. replace in kind one window.Details
remove non-bearing wall to convert (e) full & 1/2 bath into one master bath. remodel (e) bath. demo & pathc one window @ side. replace in kind one window. | $34,000 |
| May 31, 2011 | Never finaled issued May 2011, no final | 10 Fernwood Dr | to obtain final inspection for work approved under pa #9511424s. all work is complete. (original scope: turn basement level into living space w/ family room, bedroom and bathroom)Details
to obtain final inspection for work approved under pa #9511424s. all work is complete. (original scope: turn basement level into living space w/ family room, bedroom and bathroom) | |
| May 20, 2011 | Completed final sign-off Sep 2011 | 10 Fernwood Dr | replace carpet, new fireplace gas, new tiles in existing 1 bathroom, cabinetry replace in family room, 1 bathroom basement in kind. lighting to comply with cec 150(k)Details
replace carpet, new fireplace gas, new tiles in existing 1 bathroom, cabinetry replace in family room, 1 bathroom basement in kind. lighting to comply with cec 150(k) | $35,000 |
| Mar 15, 2011 | Completed final sign-off Oct 2011 | 954 Haight St | kitchen and bathroom remodelling, electrical and plumbing upgrades in unit. no wall relocation. all fluorencent lighting.Details
kitchen and bathroom remodelling, electrical and plumbing upgrades in unit. no wall relocation. all fluorencent lighting. | $40,000 |
| Jun 22, 2010 | Completed final sign-off Oct 2010 | 250 Tara St | kitchen and bath room remodeling, upgrade plumbing and electrical in kitchen and bathroom only. no wall removals. work on 2nd floorDetails
kitchen and bath room remodeling, upgrade plumbing and electrical in kitchen and bathroom only. no wall removals. work on 2nd floor | $30,000 |
| Jun 17, 2010 | Completed final sign-off Oct 2010 | 58 Martha Av | 2nd fl/ garage level: remove wet bar and renovate to bedroom, remove family rm and renovate to bedrm, legalize full bath. 3rd fl: replace stairs, move heater and tankless water heater. renovate bedroom- add walls,drs,closets, emergency egress windows. smoke detectors,electrical outlets,Details
2nd fl/ garage level: remove wet bar and renovate to bedroom, remove family rm and renovate to bedrm, legalize full bath. 3rd fl: replace stairs, move heater and tankless water heater. renovate bedroom- add walls,drs,closets, emergency egress windows. smoke detectors,electrical outlets, | $50,000 |
| Apr 12, 2010 | Completed final sign-off Jun 2010 | 307 Vicente St | kitchen and bath remodel. kitchen: elec, plumbing pugrades new cabinets, counters. bath: elec,plumbing upgrades, new fixtures and tile. no strucuralDetails
kitchen and bath remodel. kitchen: elec, plumbing pugrades new cabinets, counters. bath: elec,plumbing upgrades, new fixtures and tile. no strucural | $35,000 |
| Sep 29, 2009 | Completed final sign-off Dec 2009 | 2454 Hyde St | remodel kitchen - replace cabinets, countertops, upgrade plumbing & electrical. two bathroom remodel - replace fixtures, new tiling, upgrade plumbing & electrical at residential unit. no new lighting.Details
remodel kitchen - replace cabinets, countertops, upgrade plumbing & electrical. two bathroom remodel - replace fixtures, new tiling, upgrade plumbing & electrical at residential unit. no new lighting. | $30,000 |
| Aug 12, 2009 | Completed final sign-off Nov 2009 | 26 Newburg St | kitchen & bathroom remodel, upgrade electrical to conform to new code title 24, upgrade plumbing to (e) code. new cabinetry, counter tops, appliances & fixtures. no structural changes under this permit. plumbing & electrical under separate permit.Details
kitchen & bathroom remodel, upgrade electrical to conform to new code title 24, upgrade plumbing to (e) code. new cabinetry, counter tops, appliances & fixtures. no structural changes under this permit. plumbing & electrical under separate permit. | $40,000 |
| Jun 1, 2009 | Completed final sign-off Oct 2009 | 26 Newburg St | relocate beam to facilitate future kitchen and bath remodelDetails
relocate beam to facilitate future kitchen and bath remodel | $8,000 |