Back to bathroom remodel contractors
Liang's Remodeling Inc.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2006 to Oct 2024
- Last 24 months
- 1 permit filed
62 permits since 2000: 51 completed, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
46 bathroom remodel permits: 39 completed, 7 never finaled. Typically 7 days from filing to permit and 131 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2024 | Completed final sign-off Jul 2024 | 1489 Webster St | unit 606: to replace kitchen cabinets and appliances, replace bathroom tiles and toilet.Details
unit 606: to replace kitchen cabinets and appliances, replace bathroom tiles and toilet. | $35,000 |
| Mar 26, 2024 | Completed final sign-off Jul 2024 | 1085 Washington St | unit 103: to remodel one kitchen and one bathroom in-kind, no moving walls. no layout changes. painting at the unit (interior). install sliding doors at bedroom closet .Details
unit 103: to remodel one kitchen and one bathroom in-kind, no moving walls. no layout changes. painting at the unit (interior). install sliding doors at bedroom closet . | $48,000 |
| Sep 25, 2018 | Completed final sign-off Feb 2019 | 3210 Gough St | unit 301 - convert existing kitchen to study room, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer. comply w/sff c1103.7.6.1 along with 20107141982 no exterior workDetails
unit 301 - convert existing kitchen to study room, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer. comply w/sff c1103.7.6.1 along with 20107141982 no exterior work | $42,000 |
| Mar 13, 2018 | Completed final sign-off Jul 2018 | 3809 20th St | unit 107 - rehabilitate existing kitchen, bathroom and install washer/dryerDetails
unit 107 - rehabilitate existing kitchen, bathroom and install washer/dryer | $32,000 |
| Mar 13, 2018 | Completed final sign-off Jul 2018 | 3809 20th St | unit 105 - rehabilitate existing kitchen, bathroom and install washer/dryerDetails
unit 105 - rehabilitate existing kitchen, bathroom and install washer/dryer | $32,000 |
| Mar 7, 2018 | Completed final sign-off Jul 2018 | 3809 20th St | unit 206: rehabilate (e) kitchen & bathroom install w/dDetails
unit 206: rehabilate (e) kitchen & bathroom install w/d | $32,000 |
| Dec 6, 2017 | Completed final sign-off Dec 2017 | 520 Scott St | unit #9: revision to 201702219764: change bathroom layout & kitchenDetails
unit #9: revision to 201702219764: change bathroom layout & kitchen | $30,000 |
| Mar 20, 2017 | Never finaled issued Mar 2017, no final | 2238 Hyde St | unit 11: revision to 201608124904. reviswed proposed bathroom configurations, relocate washer and dryerDetails
unit 11: revision to 201608124904. reviswed proposed bathroom configurations, relocate washer and dryer | |
| Feb 21, 2017 | Completed final sign-off Aug 2017 | 520 Scott St | unit 4, 2nd floor - rehabilitate existing kitchen & bathroom; install washer & dryerDetails
unit 4, 2nd floor - rehabilitate existing kitchen & bathroom; install washer & dryer | $28,000 |
| Feb 21, 2017 | Completed final sign-off Oct 2017 | 520 Scott St | unit 9, 4th floor - remodel e kitchen, rehabilitate bathroom; install washer & dryerDetails
unit 9, 4th floor - remodel e kitchen, rehabilitate bathroom; install washer & dryer | $32,000 |
| Feb 15, 2017 | Completed final sign-off Jun 2017 | 305 San Carlos St | #10 - rehabilitate kitchen, covert existing living room to bedroom, rehabilitate existing bathroom, install washer & dryer.Details
#10 - rehabilitate kitchen, covert existing living room to bedroom, rehabilitate existing bathroom, install washer & dryer. | $36,000 |
| Jan 18, 2017 | Completed final sign-off Feb 2018 | 3820 Scott St | #203- remodel unit# 203, add washer & dryer, convert (e) kitchen to office, relocate kitchen, remodel (e) bathroom. n/a ordinance #155-13Details
#203- remodel unit# 203, add washer & dryer, convert (e) kitchen to office, relocate kitchen, remodel (e) bathroom. n/a ordinance #155-13 | $38,000 |
| Oct 14, 2016 | Completed final sign-off Oct 2023 | 2125 Hyde St | interior alterations remodel 1 unit into 2 units 1 studio units w/bath kitchen & w/d . a 1 bedroom unit w/bath kitchen & w/d soft story retrofit done under sep permit 201609218391Details
interior alterations remodel 1 unit into 2 units 1 studio units w/bath kitchen & w/d . a 1 bedroom unit w/bath kitchen & w/d soft story retrofit done under sep permit 201609218391 | $120,000 |
| Aug 26, 2016 | Completed final sign-off Mar 2017 | 240 Cumberland St | unit #307: reno. of bath., new kit. fixtures & cabinetry. new windows & doors (not visible from st) - no increase (e) opening sizes. new non-bearing partitions. new lighting & elect outlets, no increase to bld sf. no change to bld envelope. (n) home office w/ mech. convert closet to laundryDetails
unit #307: reno. of bath., new kit. fixtures & cabinetry. new windows & doors (not visible from st) - no increase (e) opening sizes. new non-bearing partitions. new lighting & elect outlets, no increase to bld sf. no change to bld envelope. (n) home office w/ mech. convert closet to laundry | $30,000 |
| Aug 12, 2016 | Never finaled issued Jan 2017, no final | 2238 Hyde St | 11th flr, unit #11: remodel (e) bathrooms, kitchen and add washer & dryerDetails
11th flr, unit #11: remodel (e) bathrooms, kitchen and add washer & dryer | $30,000 |
| Jul 26, 2016 | Completed final sign-off Jan 2017 | 520 Scott St | remodel #8 at 3/f- convert (e) kitchen to bedroom, remodel existing bathroom, relocate existing kitchen, add washer & dryer.Details
remodel #8 at 3/f- convert (e) kitchen to bedroom, remodel existing bathroom, relocate existing kitchen, add washer & dryer. | $40,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2017 | 655 Stockton St | remodel unit 210, 3rd floor - remodel (e) bathroom, remodel (e) kitchen, add washer and dryer. n/a ordinance #155-13Details
remodel unit 210, 3rd floor - remodel (e) bathroom, remodel (e) kitchen, add washer and dryer. n/a ordinance #155-13 | $30,000 |
| Jul 7, 2016 | Completed final sign-off Feb 2017 | 500 Church St | 3rd floor unit #508: remodel- (e) bathroom, kitchen, living room to bedroom, convert (e) bedroom 2 to living room, add washer & dryerDetails
3rd floor unit #508: remodel- (e) bathroom, kitchen, living room to bedroom, convert (e) bedroom 2 to living room, add washer & dryer | $50,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 1142 Montgomery St | unit # 1146a: revision to 201603091571. relocate living room, bedroom, and washer dryer. reocate bathroom per planDetails
unit # 1146a: revision to 201603091571. relocate living room, bedroom, and washer dryer. reocate bathroom per plan | |
| Jun 1, 2016 | Completed final sign-off Oct 2016 | 295 Castro St | remodel #293 at 2/f, remodel (e) bathrooms, relocate kitchen, add washer & dryer, alter one bearing wall.Details
remodel #293 at 2/f, remodel (e) bathrooms, relocate kitchen, add washer & dryer, alter one bearing wall. | $50,000 |
| May 12, 2016 | Completed final sign-off Nov 2016 | 520 Scott St | remodel unit #5 at the 3rd floor. remodel extg bathroom. relocate and remodel extg kitchen. convert extg kitchen into bedroom. add washer and dryer.Details
remodel unit #5 at the 3rd floor. remodel extg bathroom. relocate and remodel extg kitchen. convert extg kitchen into bedroom. add washer and dryer. | $39,000 |
| May 6, 2016 | Never finaled issued May 2016, no final | 645 Stockton St | #906- remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a ordinance #155-13Details
#906- remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a ordinance #155-13 | $30,000 |
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 2125 Hyde St | revision to ref pa 2016 0311 1833: interior alteration to unit #2125. to include the kitchen, bathroom, & add 2 bathrooms, 2 washer/dryer connections. compliance with maher ordinance no 155-13 not required.Details
revision to ref pa 2016 0311 1833: interior alteration to unit #2125. to include the kitchen, bathroom, & add 2 bathrooms, 2 washer/dryer connections. compliance with maher ordinance no 155-13 not required. | $40,000 |
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 2125 Hyde St | revision to scope of work on pa# 201603020990, add 2 bathrooms, in unit # 2125Details
revision to scope of work on pa# 201603020990, add 2 bathrooms, in unit # 2125 | $40,000 |
| Mar 9, 2016 | Completed final sign-off Sep 2016 | 1142 Montgomery St | interior renovation of unit 1146a. to include: relocation of (e) kitchen and bathroom and addition of dishwasher & w/d, no change in occupancy or (e) bldg envelope. no work in common area. all work within unit.Details
interior renovation of unit 1146a. to include: relocation of (e) kitchen and bathroom and addition of dishwasher & w/d, no change in occupancy or (e) bldg envelope. no work in common area. all work within unit. | $80,000 |
| Mar 2, 2016 | Never finaled issued Mar 2016, no final | 2115 Hyde St | to remodel a kitchen & a bathroom no new walls no changeDetails
to remodel a kitchen & a bathroom no new walls no change | $15,000 |
| Nov 6, 2015 | Completed final sign-off Apr 2016 | 295 Castro St | remodel unit 297a, 3rd fl: remodel e bathroom, existing kitchen, add washer and dryerDetails
remodel unit 297a, 3rd fl: remodel e bathroom, existing kitchen, add washer and dryer | $22,000 |
| Aug 13, 2015 | Completed final sign-off Dec 2015 | 3474 17th St | 1)remodel unit #5 at the 3rd floor. 2)remodel extg bathroom. 3)remodel extg kitchen and addition of dishwasher. 4)addition of new washer and dryer. n/a for maher.Details
1)remodel unit #5 at the 3rd floor. 2)remodel extg bathroom. 3)remodel extg kitchen and addition of dishwasher. 4)addition of new washer and dryer. n/a for maher. | $25,000 |
| Jul 31, 2015 | Completed final sign-off Dec 2015 | 295 Castro St | 1) remodel unit 291 at the 3rd floor. 2)add washer and dryer. 3)remodel kitchen. 4)remodel extg bathroom.Details
1) remodel unit 291 at the 3rd floor. 2)add washer and dryer. 3)remodel kitchen. 4)remodel extg bathroom. | $35,000 |
| Jul 15, 2015 | Completed final sign-off Nov 2015 | 1340 Taylor St | unit 8: revision to 201502097827. interior remodel of kitchen and bath. relocate washer/dryerDetails
unit 8: revision to 201502097827. interior remodel of kitchen and bath. relocate washer/dryer | |
| Jul 1, 2015 | Completed final sign-off Dec 2015 | 2828 Geary Bl | remodel unit #5 at the 3rd flr, remodel existing bathroom, remodel (e) kitchen & addition of dish washer, add washer & dryer. to comply w/ nov complaint#201532401 item#2,5,6,7 maher n/aDetails
remodel unit #5 at the 3rd flr, remodel existing bathroom, remodel (e) kitchen & addition of dish washer, add washer & dryer. to comply w/ nov complaint#201532401 item#2,5,6,7 maher n/a | $30,000 |
| Jun 5, 2015 | Completed final sign-off Sep 2015 | 1064 Dolores St | remodel #3: add washer & dryer, remodel kitchen & bathroom.Details
remodel #3: add washer & dryer, remodel kitchen & bathroom. | $10,000 |
| Mar 6, 2015 | Never finaled issued Apr 2015, no final | 3783 20th St | unit #17: renovation of existing one bedroom apartment of existing building. work include relocation and remodel of existing kitchen and bathroom, and addition of one bedroom. all renovation not to exceed existing envelope. add a washer and dryer per plan. maher n/a.Details
unit #17: renovation of existing one bedroom apartment of existing building. work include relocation and remodel of existing kitchen and bathroom, and addition of one bedroom. all renovation not to exceed existing envelope. add a washer and dryer per plan. maher n/a. | $8,000 |
| Feb 9, 2015 | Completed final sign-off Nov 2015 | 1340 Taylor St | work in unit #8: remodel of kitchen and bath. addition of washer/dryerDetails
work in unit #8: remodel of kitchen and bath. addition of washer/dryer | $30,000 |
| Jan 6, 2015 | Completed final sign-off Jun 2015 | 1441 Clay St | apt #1 - relocate kitchen make one more bedroom, relocate bath sink & shower. n/a maher ordinanceDetails
apt #1 - relocate kitchen make one more bedroom, relocate bath sink & shower. n/a maher ordinance | $20,000 |
| Oct 9, 2014 | Completed final sign-off Jul 2015 | 1441 Clay St | remodel apts #4/8: relocate walls, bathrooms, kitchens, divide apt int. to add one bedroom each, replace & relocate windows at rear of bldg, 2nd and 3rd flrs; maher n/aDetails
remodel apts #4/8: relocate walls, bathrooms, kitchens, divide apt int. to add one bedroom each, replace & relocate windows at rear of bldg, 2nd and 3rd flrs; maher n/a | $25,000 |
| Sep 26, 2014 | Completed final sign-off Jan 2015 | 550 Buchanan St | units #4 & #6. replace kitchen cabinets & upgrade electrical. replace bathroom fixtures. change plumbing fixtures laundry room. no change in walls or doors.Details
units #4 & #6. replace kitchen cabinets & upgrade electrical. replace bathroom fixtures. change plumbing fixtures laundry room. no change in walls or doors. | $45,000 |
| Jan 2, 2014 | Completed final sign-off Jul 2014 | 991 Valencia St | remodel apt 104 and 106. relocate walls, baths, one kitchen.Details
remodel apt 104 and 106. relocate walls, baths, one kitchen. | $50,000 |
| Oct 30, 2013 | Completed final sign-off Feb 2014 | 2280 Pine St | unit #205: to remodel a bathroom, relocate kitchen and non-load bearing partition walls. create a bedroom.Details
unit #205: to remodel a bathroom, relocate kitchen and non-load bearing partition walls. create a bedroom. | $22,000 |
| Aug 20, 2013 | Completed final sign-off Oct 2013 | 1545 Sacramento St | apt. #1: to remodel existing one kitchen and one bathroomDetails
apt. #1: to remodel existing one kitchen and one bathroom | $15,000 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 442 43rd Av | work on 3rd fl unit 2 at 442 43rd ave. add (n) study by installing (n) parition wall. remove (e) fire place. remove (e) bathroom door.Details
work on 3rd fl unit 2 at 442 43rd ave. add (n) study by installing (n) parition wall. remove (e) fire place. remove (e) bathroom door. | $3,000 |
| May 28, 2009 | Completed final sign-off Aug 2009 | 970 Oak St | renovate 1 unit @ 970 oak street (back top unit) # 4. specifically, remove & replace kitchen cabinets & countertops & upgrade (e) electrical system. install new tile in bathroom & kitchen & resurface hardwood floors. install new lights, sinks & plumbing fixtures. add flourescent lights in kitchen &Details
renovate 1 unit @ 970 oak street (back top unit) # 4. specifically, remove & replace kitchen cabinets & countertops & upgrade (e) electrical system. install new tile in bathroom & kitchen & resurface hardwood floors. install new lights, sinks & plumbing fixtures. add flourescent lights in kitchen & | $15,000 |
| May 23, 2008 | Completed final sign-off Oct 2008 | 1235 Oak St | renovate 4 units. 4 kitchens & 4 bathrooms. unit# 1. lower front. unit# 2 lower back, unit# 3 top front & unit# 4 top back. specifically remove & replace kitchen cabinets, countertops & upgrade (e) electrical system. install new lights & flourescent lights in kitchen. install new sinks & plumbingDetails
renovate 4 units. 4 kitchens & 4 bathrooms. unit# 1. lower front. unit# 2 lower back, unit# 3 top front & unit# 4 top back. specifically remove & replace kitchen cabinets, countertops & upgrade (e) electrical system. install new lights & flourescent lights in kitchen. install new sinks & plumbing | $64,000 |
| Jan 8, 2008 | Completed final sign-off Jun 2008 | 970 Oak St | work @ units# 1, 2 & 3 only. rremove & replace kitchens cabinets & countertops & upgrage (e) electrical system. install new tile in bathroom & kitchen & resurface all hardwood floors. install new lights, new sinks & plumbing fixtures. add flourescents lights in kitchen & bath.Details
work @ units# 1, 2 & 3 only. rremove & replace kitchens cabinets & countertops & upgrage (e) electrical system. install new tile in bathroom & kitchen & resurface all hardwood floors. install new lights, new sinks & plumbing fixtures. add flourescents lights in kitchen & bath. | $45,000 |
| May 21, 2007 | Completed final sign-off Jul 2007 | 1724 Ortega St | bathroom renovation work-replace existing bath tub, pedestal lavatory and water closet w/ water saving plumbing fixtures. replace all wall and floor tiles including existing shaowe stall.replace existing ceiling fan and light fixture unit w/ energy approved type.Details
bathroom renovation work-replace existing bath tub, pedestal lavatory and water closet w/ water saving plumbing fixtures. replace all wall and floor tiles including existing shaowe stall.replace existing ceiling fan and light fixture unit w/ energy approved type. | $6,500 |
| Apr 28, 2006 | Completed final sign-off Aug 2008 | 440 43rd Av | minor horizontal extension at 3rd story, no increase in ground coverage, interior remodeling including kitchens and baths on 2nd & 3rd story, seismic enhancements as required.Details
minor horizontal extension at 3rd story, no increase in ground coverage, interior remodeling including kitchens and baths on 2nd & 3rd story, seismic enhancements as required. | $250,000 |