Leonardo Construction Inc
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2010 to Nov 2025
- Last 24 months
- 2 permits filed
64 permits since 2000: 49 completed, 2 in progress, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 7 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 141 days from filing to permit and 575 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2020 | Never finaled issued May 2021, no final | 80 Terrace Dr | attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic.Details
attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic. | $80,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2018 | 2373 Chestnut St | full interior remodel of (e) restaurant. make (e) bathroom ada compliance, move (e) stairs.Details
full interior remodel of (e) restaurant. make (e) bathroom ada compliance, move (e) stairs. | $185,000 |
| Feb 10, 2016 | Completed final sign-off Jun 2019 | 3441 26th St | change of use. conversion of non-conforming ground floor commercial unit to residential unit. rear horizontal expansion of 2-story structure. (e) spiral stair relocated. addition of (1) bathroom.Details
change of use. conversion of non-conforming ground floor commercial unit to residential unit. rear horizontal expansion of 2-story structure. (e) spiral stair relocated. addition of (1) bathroom. | $150,000 |