Leonardo Construction Inc

Contractor license
941164
State license record
Based in
Mill Valley
On San Francisco permits
Jul 2010 to Nov 2025
Last 24 months
2 permits filed

64 permits since 2000: 49 completed, 2 in progress, 12 never finaled, 1 expired or cancelled.

Of the 12 never-finaled permits, 7 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllPergola or trellis 1Deck 3Stairs 3Kitchen remodel 14Bathroom remodel 32

3 stairs permits: 2 completed, 1 never finaled. Typically 141 days from filing to permit and 575 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 30, 2020Never finaled
issued May 2021, no final
80 Terrace Drattic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic.
Details
Permit
202012301901
Status
issued
Filed
Dec 30, 2020
Permit issued
May 20, 2021
Declared cost
$80,000
Address
80 Terrace Dr

attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic.

Open the permit page

$80,000
Jun 27, 2017Completed
final sign-off Jul 2018
2373 Chestnut Stfull interior remodel of (e) restaurant. make (e) bathroom ada compliance, move (e) stairs.
Details
Permit
201706270454
Status
complete
Filed
Jun 27, 2017
Permit issued
Aug 15, 2017
Final sign-off
Jul 26, 2018
Declared cost
$185,000
Address
2373 Chestnut St

full interior remodel of (e) restaurant. make (e) bathroom ada compliance, move (e) stairs.

Open the permit page

$185,000
Feb 10, 2016Completed
final sign-off Jun 2019
3441 26th Stchange of use. conversion of non-conforming ground floor commercial unit to residential unit. rear horizontal expansion of 2-story structure. (e) spiral stair relocated. addition of (1) bathroom.
Details
Permit
201602109217
Status
complete
Filed
Feb 10, 2016
Permit issued
Mar 28, 2017
Final sign-off
Jun 11, 2019
Declared cost
$150,000
Address
3441 26th St

change of use. conversion of non-conforming ground floor commercial unit to residential unit. rear horizontal expansion of 2-story structure. (e) spiral stair relocated. addition of (1) bathroom.

Open the permit page

$150,000