Back to kitchen remodel contractors
Leonardo Construction Inc
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2010 to Nov 2025
- Last 24 months
- 2 permits filed
64 permits since 2000: 49 completed, 2 in progress, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 7 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 12 completed, 2 never finaled. Typically 4 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2023 | Completed final sign-off Nov 2023 | 156 12th Av | renovate (e)kitchen, 3 bathrooms & flooring, demo renovated areas to studs, new high efficiency lighting/switches/outlets/gfci's/circuts, rework (e)plumbing/new fixtures/insulation/drywall/tile/cabinetry/counters, high effciency appliances, lighting fixtures interior doors, trim paintDetails
renovate (e)kitchen, 3 bathrooms & flooring, demo renovated areas to studs, new high efficiency lighting/switches/outlets/gfci's/circuts, rework (e)plumbing/new fixtures/insulation/drywall/tile/cabinetry/counters, high effciency appliances, lighting fixtures interior doors, trim paint | $100,000 |
| May 19, 2022 | Completed final sign-off Feb 2023 | 864 Florida St | residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door.Details
residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door. | $53,276 |
| Apr 15, 2021 | Completed final sign-off Feb 2022 | 15 Christopher Dr | remodel existing kitchen & baths,(3) new windows & (2) new doors not visible from street,(1) new window visible from street to match existing, new deck @ 2n floor in allowable buildable area & not more than 10'-0" above grade.Details
remodel existing kitchen & baths,(3) new windows & (2) new doors not visible from street,(1) new window visible from street to match existing, new deck @ 2n floor in allowable buildable area & not more than 10'-0" above grade. | $338,800 |
| Mar 1, 2019 | Completed final sign-off Sep 2020 | 19 Topaz Wy | remodel kitchen & 3 baths no structural partition demoDetails
remodel kitchen & 3 baths no structural partition demo | $40,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2019 | 1955 Franklin St | unit #2: remodel kitchen and baths, no structural partition demo, replace 7 windows. no change in opening, refinish floor and paint. add 2 sections of voluntary structural strengthening. new washer and dryer. n/a for maherDetails
unit #2: remodel kitchen and baths, no structural partition demo, replace 7 windows. no change in opening, refinish floor and paint. add 2 sections of voluntary structural strengthening. new washer and dryer. n/a for maher | $75,000 |
| Jun 20, 2017 | Completed final sign-off Sep 2020 | 2321 Webster St | voluntary seismic upgrade replacing brick foundation with concrete foundation. replace (e) roof membrane with similar materials. cover (1) skylight, remodel kitchen, remodel bathroom. add 1 1/2 bathrooms. (exempted for maher ordinance). see attached document in a plans. includes 2017-002197coa work.Details
voluntary seismic upgrade replacing brick foundation with concrete foundation. replace (e) roof membrane with similar materials. cover (1) skylight, remodel kitchen, remodel bathroom. add 1 1/2 bathrooms. (exempted for maher ordinance). see attached document in a plans. includes 2017-002197coa work. | $500,000 |
| Sep 18, 2015 | Completed final sign-off Mar 2016 | 166 Hancock St | full renovation of (e) kitchen, (e) split bath, new floors. update ellectric serviceDetails
full renovation of (e) kitchen, (e) split bath, new floors. update ellectric service | $60,000 |
| Jul 15, 2015 | Completed final sign-off Feb 2016 | 708 27th St | renovation of extg single family residence. work includes remodel of kitchen and bathrooms. a new bathroom will be installed on 1st floor. no work to exterior facade of house.Details
renovation of extg single family residence. work includes remodel of kitchen and bathrooms. a new bathroom will be installed on 1st floor. no work to exterior facade of house. | $80,000 |
| Aug 15, 2014 | Completed final sign-off May 2015 | 609 Central Av | revision to 201407302577. remove kitchen and dining room hall wall. remodel guest bath.Details
revision to 201407302577. remove kitchen and dining room hall wall. remodel guest bath. | $25,000 |
| Jul 30, 2014 | Completed final sign-off May 2015 | 609 Central Av | new kitchen - demolition to studs, electrical, plumbing updates, frame opening for new skylight, new insulation, sheetrock, paint, cabinets, counters, flooring. install owner supplied fixtures.Details
new kitchen - demolition to studs, electrical, plumbing updates, frame opening for new skylight, new insulation, sheetrock, paint, cabinets, counters, flooring. install owner supplied fixtures. | $40,000 |
| Mar 13, 2014 | Completed final sign-off Mar 2015 | 267 32nd Av | new kitchen, demolition to studs, electrical and plumbing updates, sheetrock, flooring, cabinets, counters, new doors, install owner supplied appliances and fixturesDetails
new kitchen, demolition to studs, electrical and plumbing updates, sheetrock, flooring, cabinets, counters, new doors, install owner supplied appliances and fixtures | $50,000 |
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 1255 California St | unit 504 - replace in kind; tile, plumbing fixtures., elect fixtures ; master bath and powder room ; update electrical in kitchen ; to comply with cec150(k) 8 & 10Details
unit 504 - replace in kind; tile, plumbing fixtures., elect fixtures ; master bath and powder room ; update electrical in kitchen ; to comply with cec150(k) 8 & 10 | $20,000 |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 2823 Folsom St | kitchen renovating - demo to studs re-route plumbing, new cabinets, tile, appliances updage electrical, move water heater, new flooring, add toilet in bath. new he lighting.Details
kitchen renovating - demo to studs re-route plumbing, new cabinets, tile, appliances updage electrical, move water heater, new flooring, add toilet in bath. new he lighting. | $35,000 |
| Nov 12, 2010 | Completed final sign-off May 2011 | 1250 Clay St | remodel of the inside of 620 sq ft residential bottom floor, work includes demo to studs, electrical and plumbing update, redry wall paint, bathroom, kitchen & windows not moving with new wall, not visbile from street, no structural workDetails
remodel of the inside of 620 sq ft residential bottom floor, work includes demo to studs, electrical and plumbing update, redry wall paint, bathroom, kitchen & windows not moving with new wall, not visbile from street, no structural work | $40,000 |