Back to bathroom remodel contractors
Leonardo Construction Inc
- Based in
- Mill Valley
- On San Francisco permits
- Jul 2010 to Nov 2025
- Last 24 months
- 2 permits filed
64 permits since 2000: 49 completed, 2 in progress, 12 never finaled, 1 expired or cancelled.
Of the 12 never-finaled permits, 7 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 25 completed, 1 in progress, 6 never finaled. Typically 6 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2025 | In progress issued Dec 2025 | 1522 Mason St | retile (e) bathroom and (n) bathroom countertopDetails
retile (e) bathroom and (n) bathroom countertop | $10,000 |
| May 27, 2025 | Completed final sign-off Feb 2026 | 3733 Broderick St | remodel 2 e) bathrooms, addition of 1 bath on 3rd fl. 1st/f: media rm remodel & water damage remediation. removal & infill 1 window on the g/fDetails
remodel 2 e) bathrooms, addition of 1 bath on 3rd fl. 1st/f: media rm remodel & water damage remediation. removal & infill 1 window on the g/f | $150,000 |
| Feb 22, 2023 | Completed final sign-off Nov 2023 | 156 12th Av | renovate (e)kitchen, 3 bathrooms & flooring, demo renovated areas to studs, new high efficiency lighting/switches/outlets/gfci's/circuts, rework (e)plumbing/new fixtures/insulation/drywall/tile/cabinetry/counters, high effciency appliances, lighting fixtures interior doors, trim paintDetails
renovate (e)kitchen, 3 bathrooms & flooring, demo renovated areas to studs, new high efficiency lighting/switches/outlets/gfci's/circuts, rework (e)plumbing/new fixtures/insulation/drywall/tile/cabinetry/counters, high effciency appliances, lighting fixtures interior doors, trim paint | $100,000 |
| Oct 18, 2022 | Completed final sign-off Jun 2025 | 225 Maywood Dr | vertical addition at the (e) second level roof terrace, enclosure of (e) 1st level porch. addition of 1 bedroom and 1 bathroom. remodel of existing bathrooms and an office.Details
vertical addition at the (e) second level roof terrace, enclosure of (e) 1st level porch. addition of 1 bedroom and 1 bathroom. remodel of existing bathrooms and an office. | $85,000 |
| May 19, 2022 | Completed final sign-off Feb 2023 | 864 Florida St | residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door.Details
residential alteration of kitchen and primary bath, window replacements at ground floor and second floor. enlarge garage door. | $53,276 |
| Apr 15, 2021 | Completed final sign-off Feb 2022 | 15 Christopher Dr | remodel existing kitchen & baths,(3) new windows & (2) new doors not visible from street,(1) new window visible from street to match existing, new deck @ 2n floor in allowable buildable area & not more than 10'-0" above grade.Details
remodel existing kitchen & baths,(3) new windows & (2) new doors not visible from street,(1) new window visible from street to match existing, new deck @ 2n floor in allowable buildable area & not more than 10'-0" above grade. | $338,800 |
| Feb 25, 2021 | Completed final sign-off May 2023 | 470 Munich St | convert mid-floor to 2 bedrooms & 1 bath. finish entry space between garage, building entry & new bedrooms. rebuild rear deck. add guardrail. add type 'x' gypsum throughout (e) garage. fire rate exit wall. update electrical as needed/required.Details
convert mid-floor to 2 bedrooms & 1 bath. finish entry space between garage, building entry & new bedrooms. rebuild rear deck. add guardrail. add type 'x' gypsum throughout (e) garage. fire rate exit wall. update electrical as needed/required. | $210,000 |
| Dec 30, 2020 | Never finaled issued May 2021, no final | 80 Terrace Dr | attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic.Details
attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic. | $80,000 |
| Mar 1, 2019 | Completed final sign-off Sep 2020 | 19 Topaz Wy | remodel kitchen & 3 baths no structural partition demoDetails
remodel kitchen & 3 baths no structural partition demo | $40,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2019 | 1955 Franklin St | unit #2: remodel kitchen and baths, no structural partition demo, replace 7 windows. no change in opening, refinish floor and paint. add 2 sections of voluntary structural strengthening. new washer and dryer. n/a for maherDetails
unit #2: remodel kitchen and baths, no structural partition demo, replace 7 windows. no change in opening, refinish floor and paint. add 2 sections of voluntary structural strengthening. new washer and dryer. n/a for maher | $75,000 |
| Dec 27, 2018 | Completed final sign-off Jun 2021 | 737 04th Av | remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 bathsDetails
remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 baths | $232,000 |
| Mar 20, 2018 | Never finaled issued Jul 2018, no final | 2373 Chestnut St | revising app#201706270454 to delete bath work. turn into storage 2/f. n/a for maher. title 24 certificates of compliance for indoor lighting are included.Details
revising app#201706270454 to delete bath work. turn into storage 2/f. n/a for maher. title 24 certificates of compliance for indoor lighting are included. | |
| Jun 27, 2017 | Completed final sign-off Jul 2018 | 2373 Chestnut St | full interior remodel of (e) restaurant. make (e) bathroom ada compliance, move (e) stairs.Details
full interior remodel of (e) restaurant. make (e) bathroom ada compliance, move (e) stairs. | $185,000 |
| Jun 20, 2017 | Completed final sign-off Sep 2020 | 2321 Webster St | voluntary seismic upgrade replacing brick foundation with concrete foundation. replace (e) roof membrane with similar materials. cover (1) skylight, remodel kitchen, remodel bathroom. add 1 1/2 bathrooms. (exempted for maher ordinance). see attached document in a plans. includes 2017-002197coa work.Details
voluntary seismic upgrade replacing brick foundation with concrete foundation. replace (e) roof membrane with similar materials. cover (1) skylight, remodel kitchen, remodel bathroom. add 1 1/2 bathrooms. (exempted for maher ordinance). see attached document in a plans. includes 2017-002197coa work. | $500,000 |
| Mar 7, 2016 | Completed final sign-off Aug 2016 | 623 Hayes St | remodel of 2/f bathroom existing finishes and plumbing fixtures will be removed, footprint will remain the same, new lighting layout, new window, remove existing chimney stack & patchDetails
remodel of 2/f bathroom existing finishes and plumbing fixtures will be removed, footprint will remain the same, new lighting layout, new window, remove existing chimney stack & patch | $25,000 |
| Feb 10, 2016 | Completed final sign-off Jun 2019 | 3441 26th St | change of use. conversion of non-conforming ground floor commercial unit to residential unit. rear horizontal expansion of 2-story structure. (e) spiral stair relocated. addition of (1) bathroom.Details
change of use. conversion of non-conforming ground floor commercial unit to residential unit. rear horizontal expansion of 2-story structure. (e) spiral stair relocated. addition of (1) bathroom. | $150,000 |
| Feb 5, 2016 | Completed final sign-off Nov 2017 | 285 Santa Rosa Av | horizontal expansion at the second floor which there is an (e) two bedrooms. the street facade will be affected. the proposed work will construct space for a new bedroom and bathroom.Details
horizontal expansion at the second floor which there is an (e) two bedrooms. the street facade will be affected. the proposed work will construct space for a new bedroom and bathroom. | $125,000 |
| Jan 20, 2016 | Completed final sign-off Apr 2016 | 723 27th St | guest bathroom remodel in (e) location: demo insulation, sheetrock, plumbing. electrical updates, paint, new fixtures, finishes, replace 3 (e) windows in-kind in rear, non straight facing.Details
guest bathroom remodel in (e) location: demo insulation, sheetrock, plumbing. electrical updates, paint, new fixtures, finishes, replace 3 (e) windows in-kind in rear, non straight facing. | $17,500 |
| Sep 18, 2015 | Completed final sign-off Mar 2016 | 166 Hancock St | full renovation of (e) kitchen, (e) split bath, new floors. update ellectric serviceDetails
full renovation of (e) kitchen, (e) split bath, new floors. update ellectric service | $60,000 |
| Jul 15, 2015 | Completed final sign-off Feb 2016 | 708 27th St | renovation of extg single family residence. work includes remodel of kitchen and bathrooms. a new bathroom will be installed on 1st floor. no work to exterior facade of house.Details
renovation of extg single family residence. work includes remodel of kitchen and bathrooms. a new bathroom will be installed on 1st floor. no work to exterior facade of house. | $80,000 |
| Apr 29, 2015 | Completed final sign-off Sep 2015 | 22 Almaden Ct | (e) bathroom remodel on 1st flr. per planDetails
(e) bathroom remodel on 1st flr. per plan | $8,000 |
| Aug 15, 2014 | Completed final sign-off May 2015 | 609 Central Av | revision to 201407302577. remove kitchen and dining room hall wall. remodel guest bath.Details
revision to 201407302577. remove kitchen and dining room hall wall. remodel guest bath. | $25,000 |
| Feb 10, 2014 | Completed final sign-off Oct 2014 | 3228 Clay St | remodel guest bath and master bath in kind. new electrical, new plumbing, toilet, tub tile, light, plumbing fixtures. replace garage door in kind. bath will be done in two separate times. no structural work.Details
remodel guest bath and master bath in kind. new electrical, new plumbing, toilet, tub tile, light, plumbing fixtures. replace garage door in kind. bath will be done in two separate times. no structural work. | $50,000 |
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 1255 California St | unit 504 - replace in kind; tile, plumbing fixtures., elect fixtures ; master bath and powder room ; update electrical in kitchen ; to comply with cec150(k) 8 & 10Details
unit 504 - replace in kind; tile, plumbing fixtures., elect fixtures ; master bath and powder room ; update electrical in kitchen ; to comply with cec150(k) 8 & 10 | $20,000 |
| Sep 20, 2013 | Completed final sign-off Nov 2013 | 1425 Baker St | new bathroom in existing closet space. demo to studs, new electrical and plumbing for fan / light, gfci, vanity light, tub, toilet, sink, new tile, sheetrock & paint.Details
new bathroom in existing closet space. demo to studs, new electrical and plumbing for fan / light, gfci, vanity light, tub, toilet, sink, new tile, sheetrock & paint. | $15,000 |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 2823 Folsom St | kitchen renovating - demo to studs re-route plumbing, new cabinets, tile, appliances updage electrical, move water heater, new flooring, add toilet in bath. new he lighting.Details
kitchen renovating - demo to studs re-route plumbing, new cabinets, tile, appliances updage electrical, move water heater, new flooring, add toilet in bath. new he lighting. | $35,000 |
| May 16, 2013 | Completed final sign-off Jun 2013 | 557 Wisconsin St | rental unit of cottage in back of lot. remodel of one bathroom, gut to studs, add fan, vanity light, 1 plug, install new tub, spout & head, install vanity & reinstall toilet in existing location, tile, paint & trim.Details
rental unit of cottage in back of lot. remodel of one bathroom, gut to studs, add fan, vanity light, 1 plug, install new tub, spout & head, install vanity & reinstall toilet in existing location, tile, paint & trim. | $7,000 |
| Apr 24, 2013 | Completed final sign-off Jun 2013 | 360 Collingwood St | bath remodel - demo to studs electrical and plumbing updates, new insulation, shower surround, new tile, plumbing fixtures, new water heater, tile, door, paintDetails
bath remodel - demo to studs electrical and plumbing updates, new insulation, shower surround, new tile, plumbing fixtures, new water heater, tile, door, paint | $15,000 |
| Aug 25, 2011 | Never finaled issued Aug 2011, no final | 73 Sumner St | unit # 201: bathroom remodel, tile, shower pan, electrical & plumbing updates, new vanity & plumbing fixtures, accessible feature @ bath to remain per 11a, lighting to comply with cec 130(k)Details
unit # 201: bathroom remodel, tile, shower pan, electrical & plumbing updates, new vanity & plumbing fixtures, accessible feature @ bath to remain per 11a, lighting to comply with cec 130(k) | $10,000 |
| Nov 12, 2010 | Completed final sign-off May 2011 | 1250 Clay St | remodel of the inside of 620 sq ft residential bottom floor, work includes demo to studs, electrical and plumbing update, redry wall paint, bathroom, kitchen & windows not moving with new wall, not visbile from street, no structural workDetails
remodel of the inside of 620 sq ft residential bottom floor, work includes demo to studs, electrical and plumbing update, redry wall paint, bathroom, kitchen & windows not moving with new wall, not visbile from street, no structural work | $40,000 |
| Aug 17, 2010 | Never finaled issued Aug 2010, no final | 3555 Pacific Av | 3 bathroom remodel with new tile floor, shower pan, surround shower valve head and drain, minor electrical if needed, high efficacy lighting or occupancy sensor controlDetails
3 bathroom remodel with new tile floor, shower pan, surround shower valve head and drain, minor electrical if needed, high efficacy lighting or occupancy sensor control | $7,500 |
| Jul 15, 2010 | Completed final sign-off Aug 2010 | 30 Lloyd St | tile both tub surround with 4" x 4" ceramic tiles, install backer based over existing lath and plaster, paint red gard water proof paint membrane, tile bathroom floor.Details
tile both tub surround with 4" x 4" ceramic tiles, install backer based over existing lath and plaster, paint red gard water proof paint membrane, tile bathroom floor. | $2,000 |