Lee Construction
- Based in
- Hayward
- On San Francisco permits
- Apr 2010 to Sep 2020
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 64 days from filing to permit and 441 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2019 | Completed final sign-off Mar 2021 | 1818 08th Av | reconstruction of interior due to fire. insert new 1st floor above basement with bedroom, bath & open stair, reconfige family room @ 2nd with new porch @ rear; reconfigue living/dine/kitchen areas @3rd (street level) add new master bath reconfigue hall bath at 4th flr. new window openigs at rearDetails
reconstruction of interior due to fire. insert new 1st floor above basement with bedroom, bath & open stair, reconfige family room @ 2nd with new porch @ rear; reconfigue living/dine/kitchen areas @3rd (street level) add new master bath reconfigue hall bath at 4th flr. new window openigs at rear | $600,000 |
| Jan 10, 2018 | Completed final sign-off Aug 2022 | 251 San Carlos St | remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher naDetails
remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher na | $345,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | leagalize existing sq footage on lower level bedroom, bath, and living space. install new legal staircase, lower floor to upper floor. enlarge kitchen into dining space areaDetails
leagalize existing sq footage on lower level bedroom, bath, and living space. install new legal staircase, lower floor to upper floor. enlarge kitchen into dining space area | $47,000 |