Back to kitchen remodel contractors
Lee Construction
- Based in
- Hayward
- On San Francisco permits
- Apr 2010 to Sep 2020
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2019 | Completed final sign-off Mar 2021 | 1818 08th Av | reconstruction of interior due to fire. insert new 1st floor above basement with bedroom, bath & open stair, reconfige family room @ 2nd with new porch @ rear; reconfigue living/dine/kitchen areas @3rd (street level) add new master bath reconfigue hall bath at 4th flr. new window openigs at rearDetails
reconstruction of interior due to fire. insert new 1st floor above basement with bedroom, bath & open stair, reconfige family room @ 2nd with new porch @ rear; reconfigue living/dine/kitchen areas @3rd (street level) add new master bath reconfigue hall bath at 4th flr. new window openigs at rear | $600,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 3075 26th St | remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room.Details
remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room. | $30,000 |
| Dec 28, 2018 | Completed final sign-off Jun 2020 | 220 Glenview Dr | remodel kitchen and bathroom, upgrade electrical, plumbing. interior update paint and flooring. dry rot repair less than 50% existing rear deck. no walls moved or removed. work at rear not visible from public right of way.Details
remodel kitchen and bathroom, upgrade electrical, plumbing. interior update paint and flooring. dry rot repair less than 50% existing rear deck. no walls moved or removed. work at rear not visible from public right of way. | $50,000 |
| Jun 13, 2018 | Completed final sign-off Jul 2019 | 26 Crescent Av | remodel kitchen and bathroom, dry rot repair front porch (<50%) and existing rear deck porch (<50% in kind), replace windows in kind aluminum wood clad or all wood. redo stucco as needed to match house, redo plumbing & electrical as needed, replace interior doors/framingDetails
remodel kitchen and bathroom, dry rot repair front porch (<50%) and existing rear deck porch (<50% in kind), replace windows in kind aluminum wood clad or all wood. redo stucco as needed to match house, redo plumbing & electrical as needed, replace interior doors/framing | $60,000 |
| Mar 26, 2018 | Expired or cancelled withdrawn Aug 2018 | 601 41st Av | installation of new accessory kitchen at the 1st fl of an (e) single family residence. the accessory ktchen is required for religious ceremonies.Details
installation of new accessory kitchen at the 1st fl of an (e) single family residence. the accessory ktchen is required for religious ceremonies. | $15,700 |
| Jan 10, 2018 | Completed final sign-off Aug 2022 | 251 San Carlos St | remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher naDetails
remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher na | $345,000 |
| Jun 21, 2016 | Completed final sign-off Feb 2017 | 26 Eastwood Dr | remodel kitchen & bathroom, dry rot repair around windows, front porch (50% or less). replace 10 rear & side windows. redo stucoo around windows & overlay to match rest of house. redo plumbing & electrical as needed. no alt to walls, replace interior door & windows in-kind. max u-factor 0.32.Details
remodel kitchen & bathroom, dry rot repair around windows, front porch (50% or less). replace 10 rear & side windows. redo stucoo around windows & overlay to match rest of house. redo plumbing & electrical as needed. no alt to walls, replace interior door & windows in-kind. max u-factor 0.32. | $80,000 |
| Feb 23, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | leagalize existing sq footage on lower level bedroom, bath, and living space. install new legal staircase, lower floor to upper floor. enlarge kitchen into dining space areaDetails
leagalize existing sq footage on lower level bedroom, bath, and living space. install new legal staircase, lower floor to upper floor. enlarge kitchen into dining space area | $47,000 |
| Feb 10, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | remodel kitchen & 2 bathrooms.replace 5 (e)windows in-kind at rear & replace siding as needed not to exceed 400 sf. not visible from street. no (n)wall & (e)wall relocation. u-factor for all windows not to exceed 0.32. lighting comply w/cec 150.0(k)3 & 5.Details
remodel kitchen & 2 bathrooms.replace 5 (e)windows in-kind at rear & replace siding as needed not to exceed 400 sf. not visible from street. no (n)wall & (e)wall relocation. u-factor for all windows not to exceed 0.32. lighting comply w/cec 150.0(k)3 & 5. | $29,000 |
| Mar 21, 2011 | Completed final sign-off May 2011 | 402 08th Av | remodel master bath tub to shower, new toilet, new sink, new wall light. cans lights to kitchen. hall bath: new toilet, sink, tub doors. change door to hall closet. new cabinet light kitchen.Details
remodel master bath tub to shower, new toilet, new sink, new wall light. cans lights to kitchen. hall bath: new toilet, sink, tub doors. change door to hall closet. new cabinet light kitchen. | $19,000 |