Lee Construction
- Based in
- Hayward
- On San Francisco permits
- Apr 2010 to Sep 2020
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 12 days from filing to permit and 449 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2018 | Completed final sign-off Jun 2020 | 220 Glenview Dr | remodel kitchen and bathroom, upgrade electrical, plumbing. interior update paint and flooring. dry rot repair less than 50% existing rear deck. no walls moved or removed. work at rear not visible from public right of way.Details
remodel kitchen and bathroom, upgrade electrical, plumbing. interior update paint and flooring. dry rot repair less than 50% existing rear deck. no walls moved or removed. work at rear not visible from public right of way. | $50,000 |
| Jun 13, 2018 | Completed final sign-off Jul 2019 | 26 Crescent Av | remodel kitchen and bathroom, dry rot repair front porch (<50%) and existing rear deck porch (<50% in kind), replace windows in kind aluminum wood clad or all wood. redo stucco as needed to match house, redo plumbing & electrical as needed, replace interior doors/framingDetails
remodel kitchen and bathroom, dry rot repair front porch (<50%) and existing rear deck porch (<50% in kind), replace windows in kind aluminum wood clad or all wood. redo stucco as needed to match house, redo plumbing & electrical as needed, replace interior doors/framing | $60,000 |
| Jan 10, 2018 | Completed final sign-off Aug 2022 | 251 San Carlos St | remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher naDetails
remodel 3rd flr rear yard deck & replace 2 windows and 1 sliding glass door. remodel 2nd flr kitchen, bathroom, bedroom and stair fron 2nd flr to 1st flr. replace 7 windows @ 2nd flr. convert (e) 1 st flr storage to 2 bedrooms, 1 bathroom, living space. new havc & elec maher na | $345,000 |
| Jun 21, 2016 | Completed final sign-off Aug 2016 | 587 Mangels Av | to comply with nov#201621944: replace rotted railing system deck & replace dry rot deck less than 50%. preconstructoin meeting with bid inspector is required.Details
to comply with nov#201621944: replace rotted railing system deck & replace dry rot deck less than 50%. preconstructoin meeting with bid inspector is required. | $1,500 |