Larkspur Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Jul 2026
- Last 24 months
- 18 permits filed
70 permits since 2000: 34 completed, 16 in progress, 17 never finaled, 3 expired or cancelled.
Of the 17 never-finaled permits, 2 are 3 to 5 years old, 15 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 5 completed, 3 in progress, 1 never finaled. Typically 168 days from filing to permit and 623 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2026 | In progress issued Aug 2026 | 3969 Washington St | relocate front entry door, landscaping stair and install 3 direct vent gas fireplaces.Details
relocate front entry door, landscaping stair and install 3 direct vent gas fireplaces. | $40,000 |
| Feb 11, 2026 | In progress issued Jul 2026 | 3969 Washington St | exterior alterations: vertical roof addition / dormer to provide headroom for interior stair to 4th floor. interior alteration: construct new stair to 4th floor.Details
exterior alterations: vertical roof addition / dormer to provide headroom for interior stair to 4th floor. interior alteration: construct new stair to 4th floor. | $150,000 |
| May 27, 2025 | In progress issued Aug 2025 | 2068 Pine St | repair leaks and water damage at front yard stair, replace stair finishes, railings, & handrail. add decorative window and door trim at front facade. replace front door & sidelight at unit #2068 only. no plumbing fixtures.Details
repair leaks and water damage at front yard stair, replace stair finishes, railings, & handrail. add decorative window and door trim at front facade. replace front door & sidelight at unit #2068 only. no plumbing fixtures. | $110,000 |
| Aug 27, 2020 | Completed final sign-off Jul 2023 | 1942 Pacific Av | bsmt: replace & repair full foundation, remodel lower kitchen flr, relocate/remodel bath, relocate & upgrade mech equip, add shared laundry rm, new wine closet. 1st fl: remodel kitchen, relocate powder rm, repair (e) staircase, open wall below main stair. 2nd fl: remodel 2 baths, add gas applianceDetails
bsmt: replace & repair full foundation, remodel lower kitchen flr, relocate/remodel bath, relocate & upgrade mech equip, add shared laundry rm, new wine closet. 1st fl: remodel kitchen, relocate powder rm, repair (e) staircase, open wall below main stair. 2nd fl: remodel 2 baths, add gas appliance | $302,065 |
| Jan 17, 2020 | Completed final sign-off Oct 2023 | 818 Noe St | legalize rehabilitation of extg 225 sq ft rear yard deck extending from 2nd floor. kitchen with stairs to ground level.Details
legalize rehabilitation of extg 225 sq ft rear yard deck extending from 2nd floor. kitchen with stairs to ground level. | $18,000 |
| Sep 5, 2018 | Completed final sign-off Feb 2019 | 150 Vicksburg St | remove tile at roof deck landing and stairs. replace failed membrane with new cim membrane. remove ipe decking, replace failed roofing with cim membrane. replace (2) roof drains. reinstall ipe decking. install new tile.Details
remove tile at roof deck landing and stairs. replace failed membrane with new cim membrane. remove ipe decking, replace failed roofing with cim membrane. replace (2) roof drains. reinstall ipe decking. install new tile. | $37,000 |
| Apr 20, 2018 | Completed final sign-off Oct 2018 | 2060 Divisadero St | demo of non structural walls, doors in response to planning enforcement 201800279 enf to re-establish 2 dwelling units and 1 business space; new walls, doors, plumbingm, ceiling, stairs.Details
demo of non structural walls, doors in response to planning enforcement 201800279 enf to re-establish 2 dwelling units and 1 business space; new walls, doors, plumbingm, ceiling, stairs. | $25,000 |
| Mar 15, 2018 | Never finaled issued May 2018, no final | 338 Main St | #37b - construct new glass wind break, stair bulkhead addition (w/sprinklers) and spiral stair to roof deck. no change to (e) bld guardrail. sprinklers, lighting and ele under sep permit. n/a for maherDetails
#37b - construct new glass wind break, stair bulkhead addition (w/sprinklers) and spiral stair to roof deck. no change to (e) bld guardrail. sprinklers, lighting and ele under sep permit. n/a for maher | $300,000 |
| Jul 15, 2016 | Completed final sign-off May 2023 | 942 Noe St | addition to rear of buidling @ (e) 1st & 2nd floors. interior remodel of (e) kitchen. add 2 bathrooms with shower. add guard rail @ front stair for safety.Details
addition to rear of buidling @ (e) 1st & 2nd floors. interior remodel of (e) kitchen. add 2 bathrooms with shower. add guard rail @ front stair for safety. | $88,000 |