L & Q Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Dec 2016
- Last 24 months
- 0 permits filed
71 permits since 2000: 50 completed, 19 never finaled, 2 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 8 completed, 3 never finaled. Typically 23 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2016 | Completed final sign-off Mar 2018 | 2517 19th St | remodel (e) single family residence - add (n) bed rooms, add rooms down, new bath rooms, relocate kitchen, dormers. rebuild stair to rear yard. new interior stairs- modify wall layoutDetails
remodel (e) single family residence - add (n) bed rooms, add rooms down, new bath rooms, relocate kitchen, dormers. rebuild stair to rear yard. new interior stairs- modify wall layout | $175,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 2031 17th Av | revision to pa 201605026297 reconfigure interior stairs and kitchen layoutDetails
revision to pa 201605026297 reconfigure interior stairs and kitchen layout | |
| May 2, 2016 | Completed final sign-off Jan 2017 | 2031 17th Av | 1st floor - add 1 media room, 1 bedroom, 2 baths, and 1 home office. relocate laundry. 2nd floor - enclose north and south light well. remodel kitchen and bathroom, and add 1 bathroom. new roof deck over garage. roof: new roof deck and stairs to 2nd floorDetails
1st floor - add 1 media room, 1 bedroom, 2 baths, and 1 home office. relocate laundry. 2nd floor - enclose north and south light well. remodel kitchen and bathroom, and add 1 bathroom. new roof deck over garage. roof: new roof deck and stairs to 2nd floor | $120,000 |
| May 18, 2015 | Completed final sign-off Jan 2016 | 50 Bay View St | comply iwth nov 201529833 (partial compliance) replace rear exterior stair dry rotted, repair in kind less than 50%.Details
comply iwth nov 201529833 (partial compliance) replace rear exterior stair dry rotted, repair in kind less than 50%. | $1,500 |
| Sep 23, 2014 | Completed final sign-off Jan 2016 | 1763 33rd Av | to legalize (e) unauthorized "in-law" dwelling unit @ basement. provide (n) stair @ deck @ rear yard as shown on plans.Details
to legalize (e) unauthorized "in-law" dwelling unit @ basement. provide (n) stair @ deck @ rear yard as shown on plans. | $15,000 |
| Jul 11, 2014 | Completed final sign-off Jul 2014 | 763 Filbert St | repair rear deck stair, less than 50%, to comply with his nove #201481421, dated 7/23/2014Details
repair rear deck stair, less than 50%, to comply with his nove #201481421, dated 7/23/2014 | $1,000 |
| May 19, 2014 | Completed final sign-off Oct 2015 | 135 Skyview Wy | 1)remodel(e)kitchen,bathroom,constr 1 new bath room.remove partial(e) wall.upgrade(e)ceiling joists&rewire elect/liting at 2/fl & re-built interior stair fr 2/fl down to grd fl. 2)construct 3 bedroom,2 bath, & family rm at grd fl. 3)construct a new deck at rear of bldg.size approx 4'x25'.Details
1)remodel(e)kitchen,bathroom,constr 1 new bath room.remove partial(e) wall.upgrade(e)ceiling joists&rewire elect/liting at 2/fl & re-built interior stair fr 2/fl down to grd fl. 2)construct 3 bedroom,2 bath, & family rm at grd fl. 3)construct a new deck at rear of bldg.size approx 4'x25'. | $80,000 |
| Mar 31, 2014 | Completed final sign-off Jul 2014 | 1734 33rd Av | legalize existing bathroom and provide a new bathroom, a family room, a laundry room & 2 storages at ground floor. new deck & stair @ rear. no wet bar allowed.Details
legalize existing bathroom and provide a new bathroom, a family room, a laundry room & 2 storages at ground floor. new deck & stair @ rear. no wet bar allowed. | $40,000 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 2042 10th Av | convert basement space to living space. 1/f: raise left rear portion to level with 1/f, add 1 bedroom, 2 full baths, 1 study room and new stairs to basement. 2/f: enclose courtyard to living space, add 1/2 bath, remodel kitchen and bath.Details
convert basement space to living space. 1/f: raise left rear portion to level with 1/f, add 1 bedroom, 2 full baths, 1 study room and new stairs to basement. 2/f: enclose courtyard to living space, add 1/2 bath, remodel kitchen and bath. | $80,000 |
| Jul 2, 2013 | Never finaled issued Jul 2013, no final | 3806 19th St | new spiral stair case, new bathroom, new office and family room at garage level. addition of new exterior wood deck and stair at rear of house. install new furnace and some electrical work.Details
new spiral stair case, new bathroom, new office and family room at garage level. addition of new exterior wood deck and stair at rear of house. install new furnace and some electrical work. | $35,000 |
| Aug 29, 2012 | Completed final sign-off May 2013 | 859 26th Av | revision to bpa2007-0212-4047. add one bathroom to 1/f. enlarge study into storage convert family to bedroom. 2/f covert toilet into full bath, remodel (e) bath, widen opng between kitchen/dining room, add skylight at bedroom, rebuild internal staircase.Details
revision to bpa2007-0212-4047. add one bathroom to 1/f. enlarge study into storage convert family to bedroom. 2/f covert toilet into full bath, remodel (e) bath, widen opng between kitchen/dining room, add skylight at bedroom, rebuild internal staircase. | $35,000 |