Back to kitchen remodel contractors
L & Q Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Dec 2016
- Last 24 months
- 0 permits filed
71 permits since 2000: 50 completed, 19 never finaled, 2 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 18 completed, 6 never finaled, 1 expired or cancelled. Typically 11 days from filing to permit and 171 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2016 | Completed final sign-off Jan 2017 | 2658 44th Av | 2nd floor: remodel kitchen and bathroom.Details
2nd floor: remodel kitchen and bathroom. | $30,000 |
| Sep 22, 2016 | Completed final sign-off Jun 2017 | 533 Point Lobos Av | 1/f: add 2 bedrooms, 1 full bath, 1 laundry and media room. 2/f: redmodel kitchen & bathroom and add 1 bath, enclose courtyard and add new deck at rear.Details
1/f: add 2 bedrooms, 1 full bath, 1 laundry and media room. 2/f: redmodel kitchen & bathroom and add 1 bath, enclose courtyard and add new deck at rear. | $120,000 |
| Jul 26, 2016 | Completed final sign-off Mar 2017 | 3326 Vicente St | 1st floor: add one bedroom, 1 bath, and laundry. 2nd floor: remodel kitchen and bath.Details
1st floor: add one bedroom, 1 bath, and laundry. 2nd floor: remodel kitchen and bath. | $60,000 |
| Jul 11, 2016 | Completed final sign-off Mar 2018 | 2517 19th St | remodel (e) single family residence - add (n) bed rooms, add rooms down, new bath rooms, relocate kitchen, dormers. rebuild stair to rear yard. new interior stairs- modify wall layoutDetails
remodel (e) single family residence - add (n) bed rooms, add rooms down, new bath rooms, relocate kitchen, dormers. rebuild stair to rear yard. new interior stairs- modify wall layout | $175,000 |
| Jun 24, 2016 | Never finaled issued Jun 2016, no final | 2031 17th Av | revision to pa 201605026297 reconfigure interior stairs and kitchen layoutDetails
revision to pa 201605026297 reconfigure interior stairs and kitchen layout | |
| May 2, 2016 | Completed final sign-off Jan 2017 | 2031 17th Av | 1st floor - add 1 media room, 1 bedroom, 2 baths, and 1 home office. relocate laundry. 2nd floor - enclose north and south light well. remodel kitchen and bathroom, and add 1 bathroom. new roof deck over garage. roof: new roof deck and stairs to 2nd floorDetails
1st floor - add 1 media room, 1 bedroom, 2 baths, and 1 home office. relocate laundry. 2nd floor - enclose north and south light well. remodel kitchen and bathroom, and add 1 bathroom. new roof deck over garage. roof: new roof deck and stairs to 2nd floor | $120,000 |
| Mar 7, 2016 | Completed final sign-off Aug 2016 | 543 35th Av | 1st flr: add family room, two bedrooms and 2 full baths. 2nd flr: remodel kitchen & bath room. add laundry room, bathroom and deck at rearDetails
1st flr: add family room, two bedrooms and 2 full baths. 2nd flr: remodel kitchen & bath room. add laundry room, bathroom and deck at rear | $80,000 |
| Feb 17, 2016 | Completed final sign-off Apr 2016 | 1575 42nd Av | change kitchen cabinets and counter top. no structural work.Details
change kitchen cabinets and counter top. no structural work. | $10,000 |
| Aug 14, 2015 | Never finaled issued Aug 2015, no final | 167 Gaven St | remove old kitchen cabinet & install counter top, new cabinetDetails
remove old kitchen cabinet & install counter top, new cabinet | $2,500 |
| Jul 14, 2015 | Expired or cancelled expired Sep 2019 | 1201 43rd Av | remodel kitchen and two bathrooms. kitchen: cabinet, floor tiles, counter tops. bathroom - replace tiles, toilets and vanity.Details
remodel kitchen and two bathrooms. kitchen: cabinet, floor tiles, counter tops. bathroom - replace tiles, toilets and vanity. | $25,000 |
| Jun 29, 2015 | Completed final sign-off Jul 2016 | 1224 Wawona St | 2nd floor: remodel kitchen and bathroom.Details
2nd floor: remodel kitchen and bathroom. | $20,000 |
| Apr 14, 2015 | Completed final sign-off Dec 2015 | 55 Ramona Av | 2nd fl: add 1 bathroom, remodel kitchen and 1 bath. 3rd fl: add 1 bathroom, remodel kitchen and 1 bathDetails
2nd fl: add 1 bathroom, remodel kitchen and 1 bath. 3rd fl: add 1 bathroom, remodel kitchen and 1 bath | $60,000 |
| Mar 25, 2015 | Never finaled issued Mar 2015, no final | 340 Ritch St | apt #7: remove existing kitchen cabinet and counter top, install new one, remodel bathroom, replace sink vanity and toilet, install new tile. kitchen & bathroom remodel.Details
apt #7: remove existing kitchen cabinet and counter top, install new one, remodel bathroom, replace sink vanity and toilet, install new tile. kitchen & bathroom remodel. | $15,000 |
| Dec 1, 2014 | Completed final sign-off Oct 2015 | 3089 21st Av | 1st floor: add 1 family room with wetbar and sink ,1 bedroom, 1 laundry, 1 full bath and 1 half bath. 2nd floor: remodel 2 bathroom and kitchen. add half bath per plan.Details
1st floor: add 1 family room with wetbar and sink ,1 bedroom, 1 laundry, 1 full bath and 1 half bath. 2nd floor: remodel 2 bathroom and kitchen. add half bath per plan. | $110,000 |
| Jul 1, 2014 | Never finaled issued Feb 2017, no final | 1419 Funston Av | remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition.Details
remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition. | $200,000 |
| May 19, 2014 | Completed final sign-off Oct 2015 | 135 Skyview Wy | 1)remodel(e)kitchen,bathroom,constr 1 new bath room.remove partial(e) wall.upgrade(e)ceiling joists&rewire elect/liting at 2/fl & re-built interior stair fr 2/fl down to grd fl. 2)construct 3 bedroom,2 bath, & family rm at grd fl. 3)construct a new deck at rear of bldg.size approx 4'x25'.Details
1)remodel(e)kitchen,bathroom,constr 1 new bath room.remove partial(e) wall.upgrade(e)ceiling joists&rewire elect/liting at 2/fl & re-built interior stair fr 2/fl down to grd fl. 2)construct 3 bedroom,2 bath, & family rm at grd fl. 3)construct a new deck at rear of bldg.size approx 4'x25'. | $80,000 |
| Mar 21, 2014 | Completed final sign-off May 2014 | 2186 14th Av | remodel kitchen. install cabinets, counter top, floor tile. all walls to remain, no walls moved, removed or added. add fixtures layout to remain the same.Details
remodel kitchen. install cabinets, counter top, floor tile. all walls to remain, no walls moved, removed or added. add fixtures layout to remain the same. | $9,500 |
| Mar 21, 2014 | Completed final sign-off Jul 2014 | 819 Paris St | remodel kitchen and bath. install cabinets, counter top, floor tile. all walls to remain, no walls moved, removed or added. add fixtures layout to remain the same.Details
remodel kitchen and bath. install cabinets, counter top, floor tile. all walls to remain, no walls moved, removed or added. add fixtures layout to remain the same. | $12,000 |
| Feb 5, 2014 | Completed final sign-off Mar 2014 | 140 Gellert Dr | remodeling of kitchen, replace countertop , cabinet, appliances, new lgihts, , floor tile, all new lights shall comply with cec 50(k) 8Details
remodeling of kitchen, replace countertop , cabinet, appliances, new lgihts, , floor tile, all new lights shall comply with cec 50(k) 8 | $9,000 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 2042 10th Av | convert basement space to living space. 1/f: raise left rear portion to level with 1/f, add 1 bedroom, 2 full baths, 1 study room and new stairs to basement. 2/f: enclose courtyard to living space, add 1/2 bath, remodel kitchen and bath.Details
convert basement space to living space. 1/f: raise left rear portion to level with 1/f, add 1 bedroom, 2 full baths, 1 study room and new stairs to basement. 2/f: enclose courtyard to living space, add 1/2 bath, remodel kitchen and bath. | $80,000 |
| Jul 19, 2013 | Never finaled issued Aug 2013, no final | 2051 42nd Av | remodel 1st floor: add 2 bedrooms, full bath, and storage room. 2nd floor:add full bath. remodel extg bath and kitchen.Details
remodel 1st floor: add 2 bedrooms, full bath, and storage room. 2nd floor:add full bath. remodel extg bath and kitchen. | $54,000 |
| Jun 11, 2013 | Completed final sign-off Sep 2013 | 1466 42nd Av | 1. construct two skylight (not visible from street). upgrade ceiling joists & remodel (e) kitchen/bathroom & add one (n) bath room & re-wire lighting at 2nd floor. 2. remove/replace partial dryrot & stucco in kind. in front of bldg under the window (approx 50 sq ft). infill lightwellDetails
1. construct two skylight (not visible from street). upgrade ceiling joists & remodel (e) kitchen/bathroom & add one (n) bath room & re-wire lighting at 2nd floor. 2. remove/replace partial dryrot & stucco in kind. in front of bldg under the window (approx 50 sq ft). infill lightwell | $42,000 |
| Apr 30, 2013 | Completed final sign-off Sep 2013 | 634 Baker St | #2 - 3rd floor - remodel kitchen & bath & add full bath, one window replacement.Details
#2 - 3rd floor - remodel kitchen & bath & add full bath, one window replacement. | $22,000 |
| Oct 5, 2012 | Completed final sign-off May 2013 | 1567 42nd Av | replace kitchen cabinet and counter-top; replace furnaceDetails
replace kitchen cabinet and counter-top; replace furnace | $10,500 |
| Aug 29, 2012 | Completed final sign-off May 2013 | 859 26th Av | revision to bpa2007-0212-4047. add one bathroom to 1/f. enlarge study into storage convert family to bedroom. 2/f covert toilet into full bath, remodel (e) bath, widen opng between kitchen/dining room, add skylight at bedroom, rebuild internal staircase.Details
revision to bpa2007-0212-4047. add one bathroom to 1/f. enlarge study into storage convert family to bedroom. 2/f covert toilet into full bath, remodel (e) bath, widen opng between kitchen/dining room, add skylight at bedroom, rebuild internal staircase. | $35,000 |