Back to bathroom remodel contractors
L & Q Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Dec 2016
- Last 24 months
- 0 permits filed
71 permits since 2000: 50 completed, 19 never finaled, 2 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 25 completed, 8 never finaled, 2 expired or cancelled. Typically 11 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2016 | Completed final sign-off Jan 2017 | 2658 44th Av | 2nd floor: remodel kitchen and bathroom.Details
2nd floor: remodel kitchen and bathroom. | $30,000 |
| Sep 22, 2016 | Completed final sign-off Jun 2017 | 533 Point Lobos Av | 1/f: add 2 bedrooms, 1 full bath, 1 laundry and media room. 2/f: redmodel kitchen & bathroom and add 1 bath, enclose courtyard and add new deck at rear.Details
1/f: add 2 bedrooms, 1 full bath, 1 laundry and media room. 2/f: redmodel kitchen & bathroom and add 1 bath, enclose courtyard and add new deck at rear. | $120,000 |
| Sep 1, 2016 | Completed final sign-off Mar 2017 | 1843 25th Av | 1)add rear deck at 2nd floor. 2)reconfigure 1st floor: add 2 bedrooms. relocate media room, bath room and laundry per plan.Details
1)add rear deck at 2nd floor. 2)reconfigure 1st floor: add 2 bedrooms. relocate media room, bath room and laundry per plan. | $39,700 |
| Jul 26, 2016 | Completed final sign-off Mar 2017 | 3326 Vicente St | 1st floor: add one bedroom, 1 bath, and laundry. 2nd floor: remodel kitchen and bath.Details
1st floor: add one bedroom, 1 bath, and laundry. 2nd floor: remodel kitchen and bath. | $60,000 |
| Jul 11, 2016 | Completed final sign-off Mar 2018 | 2517 19th St | remodel (e) single family residence - add (n) bed rooms, add rooms down, new bath rooms, relocate kitchen, dormers. rebuild stair to rear yard. new interior stairs- modify wall layoutDetails
remodel (e) single family residence - add (n) bed rooms, add rooms down, new bath rooms, relocate kitchen, dormers. rebuild stair to rear yard. new interior stairs- modify wall layout | $175,000 |
| Jul 11, 2016 | Completed final sign-off Feb 2017 | 1753 47th Av | 1st fl: convert studio into office and den into bedroom. 2nd fl: remodel 2 baths and add laundry, remove rear deck and infill southern lightwellDetails
1st fl: convert studio into office and den into bedroom. 2nd fl: remodel 2 baths and add laundry, remove rear deck and infill southern lightwell | $15,000 |
| Jul 5, 2016 | Completed final sign-off Sep 2016 | 1567 42nd Av | 1st floor: add one family room, 1 bedroom, 1 full bath, and media room.Details
1st floor: add one family room, 1 bedroom, 1 full bath, and media room. | $60,000 |
| Jun 10, 2016 | Expired or cancelled cancelled Sep 2016 | 1753 47th Av | remodel (1) bathroom on second floorDetails
remodel (1) bathroom on second floor | $8,000 |
| May 2, 2016 | Completed final sign-off Jan 2017 | 2031 17th Av | 1st floor - add 1 media room, 1 bedroom, 2 baths, and 1 home office. relocate laundry. 2nd floor - enclose north and south light well. remodel kitchen and bathroom, and add 1 bathroom. new roof deck over garage. roof: new roof deck and stairs to 2nd floorDetails
1st floor - add 1 media room, 1 bedroom, 2 baths, and 1 home office. relocate laundry. 2nd floor - enclose north and south light well. remodel kitchen and bathroom, and add 1 bathroom. new roof deck over garage. roof: new roof deck and stairs to 2nd floor | $120,000 |
| Mar 7, 2016 | Completed final sign-off Aug 2016 | 543 35th Av | 1st flr: add family room, two bedrooms and 2 full baths. 2nd flr: remodel kitchen & bath room. add laundry room, bathroom and deck at rearDetails
1st flr: add family room, two bedrooms and 2 full baths. 2nd flr: remodel kitchen & bath room. add laundry room, bathroom and deck at rear | $80,000 |
| Feb 2, 2016 | Completed final sign-off May 2016 | 2182 14th Av | 3/f: convert family room into bedroom and full bath.Details
3/f: convert family room into bedroom and full bath. | $10,000 |
| Aug 18, 2015 | Completed final sign-off Oct 2015 | 135 Skyview Wy | revision under pa#201405196080, convert a full bathroom into 1/2 bathroom & divide one (e) bedroom into office & closet. all work at second floor.Details
revision under pa#201405196080, convert a full bathroom into 1/2 bathroom & divide one (e) bedroom into office & closet. all work at second floor. | $5,000 |
| Aug 17, 2015 | Completed final sign-off Apr 2016 | 1432 24th Av | legalize (1) bedroom @ ground floor, provide 1 (n) bedroom, 1 living & 2 bathrooms at ground floor (n) deck @ rear yard.Details
legalize (1) bedroom @ ground floor, provide 1 (n) bedroom, 1 living & 2 bathrooms at ground floor (n) deck @ rear yard. | $20,000 |
| Jul 14, 2015 | Expired or cancelled expired Sep 2019 | 1201 43rd Av | remodel kitchen and two bathrooms. kitchen: cabinet, floor tiles, counter tops. bathroom - replace tiles, toilets and vanity.Details
remodel kitchen and two bathrooms. kitchen: cabinet, floor tiles, counter tops. bathroom - replace tiles, toilets and vanity. | $25,000 |
| Jun 29, 2015 | Completed final sign-off Jul 2016 | 1224 Wawona St | 2nd floor: remodel kitchen and bathroom.Details
2nd floor: remodel kitchen and bathroom. | $20,000 |
| Jun 4, 2015 | Completed final sign-off Apr 2017 | 631 34th Av | adding habitable space at ground floor. add a meeting room, a media room, a 1/2 bath and a exercise room for both units. adding 2 sets of new dryer and washer. replace 2 furnaces.Details
adding habitable space at ground floor. add a meeting room, a media room, a 1/2 bath and a exercise room for both units. adding 2 sets of new dryer and washer. replace 2 furnaces. | $20,000 |
| Apr 16, 2015 | Never finaled issued Apr 2015, no final | 1838 34th Av | replace bathroom tiles at walls approx 120 sq ft, replace toilet and sink only.Details
replace bathroom tiles at walls approx 120 sq ft, replace toilet and sink only. | $3,000 |
| Apr 14, 2015 | Completed final sign-off Dec 2015 | 55 Ramona Av | 2nd fl: add 1 bathroom, remodel kitchen and 1 bath. 3rd fl: add 1 bathroom, remodel kitchen and 1 bathDetails
2nd fl: add 1 bathroom, remodel kitchen and 1 bath. 3rd fl: add 1 bathroom, remodel kitchen and 1 bath | $60,000 |
| Mar 25, 2015 | Never finaled issued Mar 2015, no final | 340 Ritch St | apt #7: remove existing kitchen cabinet and counter top, install new one, remodel bathroom, replace sink vanity and toilet, install new tile. kitchen & bathroom remodel.Details
apt #7: remove existing kitchen cabinet and counter top, install new one, remodel bathroom, replace sink vanity and toilet, install new tile. kitchen & bathroom remodel. | $15,000 |
| Dec 24, 2014 | Completed final sign-off Aug 2016 | 261 Lowell St | correct violation #201407602; legalize (4) storage rooms and 2 half bath @ ground floor.Details
correct violation #201407602; legalize (4) storage rooms and 2 half bath @ ground floor. | $500 |
| Dec 1, 2014 | Completed final sign-off Oct 2015 | 3089 21st Av | 1st floor: add 1 family room with wetbar and sink ,1 bedroom, 1 laundry, 1 full bath and 1 half bath. 2nd floor: remodel 2 bathroom and kitchen. add half bath per plan.Details
1st floor: add 1 family room with wetbar and sink ,1 bedroom, 1 laundry, 1 full bath and 1 half bath. 2nd floor: remodel 2 bathroom and kitchen. add half bath per plan. | $110,000 |
| Oct 1, 2014 | Completed final sign-off Oct 2014 | 4240 Irving St | comply with nov 201487641 - items 6 & 7. replace 2 fans in bathrooms. 1 closet door. existing damaged counter top, indoor dryer vent.Details
comply with nov 201487641 - items 6 & 7. replace 2 fans in bathrooms. 1 closet door. existing damaged counter top, indoor dryer vent. | $1,000 |
| Jul 1, 2014 | Never finaled issued Feb 2017, no final | 1419 Funston Av | remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition.Details
remodel 2nd level & add 2nd unit on 3rd floor including kitchen and bathroom. also rear horizontal addition. | $200,000 |
| May 19, 2014 | Completed final sign-off Oct 2015 | 135 Skyview Wy | 1)remodel(e)kitchen,bathroom,constr 1 new bath room.remove partial(e) wall.upgrade(e)ceiling joists&rewire elect/liting at 2/fl & re-built interior stair fr 2/fl down to grd fl. 2)construct 3 bedroom,2 bath, & family rm at grd fl. 3)construct a new deck at rear of bldg.size approx 4'x25'.Details
1)remodel(e)kitchen,bathroom,constr 1 new bath room.remove partial(e) wall.upgrade(e)ceiling joists&rewire elect/liting at 2/fl & re-built interior stair fr 2/fl down to grd fl. 2)construct 3 bedroom,2 bath, & family rm at grd fl. 3)construct a new deck at rear of bldg.size approx 4'x25'. | $80,000 |
| Apr 21, 2014 | Never finaled issued May 2014, no final | 2259 44th Av | basement: add full bath and level left side storage room floor.Details
basement: add full bath and level left side storage room floor. | $10,000 |
| Mar 31, 2014 | Completed final sign-off Jul 2014 | 1734 33rd Av | legalize existing bathroom and provide a new bathroom, a family room, a laundry room & 2 storages at ground floor. new deck & stair @ rear. no wet bar allowed.Details
legalize existing bathroom and provide a new bathroom, a family room, a laundry room & 2 storages at ground floor. new deck & stair @ rear. no wet bar allowed. | $40,000 |
| Mar 21, 2014 | Completed final sign-off Jul 2014 | 819 Paris St | remodel kitchen and bath. install cabinets, counter top, floor tile. all walls to remain, no walls moved, removed or added. add fixtures layout to remain the same.Details
remodel kitchen and bath. install cabinets, counter top, floor tile. all walls to remain, no walls moved, removed or added. add fixtures layout to remain the same. | $12,000 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 2042 10th Av | convert basement space to living space. 1/f: raise left rear portion to level with 1/f, add 1 bedroom, 2 full baths, 1 study room and new stairs to basement. 2/f: enclose courtyard to living space, add 1/2 bath, remodel kitchen and bath.Details
convert basement space to living space. 1/f: raise left rear portion to level with 1/f, add 1 bedroom, 2 full baths, 1 study room and new stairs to basement. 2/f: enclose courtyard to living space, add 1/2 bath, remodel kitchen and bath. | $80,000 |
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 857 Clay St | to comply with ordinance 029-13 only, installation of grab bars in sro, 2/f-4/f baths, total 6 toilets, 6 shower room, 2 toilets & 2 showers on each floor.Details
to comply with ordinance 029-13 only, installation of grab bars in sro, 2/f-4/f baths, total 6 toilets, 6 shower room, 2 toilets & 2 showers on each floor. | $1,000 |
| Jul 19, 2013 | Never finaled issued Aug 2013, no final | 2051 42nd Av | remodel 1st floor: add 2 bedrooms, full bath, and storage room. 2nd floor:add full bath. remodel extg bath and kitchen.Details
remodel 1st floor: add 2 bedrooms, full bath, and storage room. 2nd floor:add full bath. remodel extg bath and kitchen. | $54,000 |
| Jul 2, 2013 | Never finaled issued Jul 2013, no final | 3806 19th St | new spiral stair case, new bathroom, new office and family room at garage level. addition of new exterior wood deck and stair at rear of house. install new furnace and some electrical work.Details
new spiral stair case, new bathroom, new office and family room at garage level. addition of new exterior wood deck and stair at rear of house. install new furnace and some electrical work. | $35,000 |
| Jun 11, 2013 | Completed final sign-off Sep 2013 | 1466 42nd Av | 1. construct two skylight (not visible from street). upgrade ceiling joists & remodel (e) kitchen/bathroom & add one (n) bath room & re-wire lighting at 2nd floor. 2. remove/replace partial dryrot & stucco in kind. in front of bldg under the window (approx 50 sq ft). infill lightwellDetails
1. construct two skylight (not visible from street). upgrade ceiling joists & remodel (e) kitchen/bathroom & add one (n) bath room & re-wire lighting at 2nd floor. 2. remove/replace partial dryrot & stucco in kind. in front of bldg under the window (approx 50 sq ft). infill lightwell | $42,000 |
| Apr 30, 2013 | Completed final sign-off Sep 2013 | 634 Baker St | #2 - 3rd floor - remodel kitchen & bath & add full bath, one window replacement.Details
#2 - 3rd floor - remodel kitchen & bath & add full bath, one window replacement. | $22,000 |
| Dec 28, 2012 | Completed final sign-off Jan 2013 | 340 Ritch St | to legalize 1/2 bath in unit #4 second floorDetails
to legalize 1/2 bath in unit #4 second floor | $5,000 |
| Aug 29, 2012 | Completed final sign-off May 2013 | 859 26th Av | revision to bpa2007-0212-4047. add one bathroom to 1/f. enlarge study into storage convert family to bedroom. 2/f covert toilet into full bath, remodel (e) bath, widen opng between kitchen/dining room, add skylight at bedroom, rebuild internal staircase.Details
revision to bpa2007-0212-4047. add one bathroom to 1/f. enlarge study into storage convert family to bedroom. 2/f covert toilet into full bath, remodel (e) bath, widen opng between kitchen/dining room, add skylight at bedroom, rebuild internal staircase. | $35,000 |