L H Gao Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Sep 2000 to Jul 2026
- Last 24 months
- 5 permits filed
73 permits since 2000: 56 completed, 1 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 7 completed, 3 never finaled. Typically 4 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2021 | Completed final sign-off Feb 2026 | 127 08th Av | remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen.Details
remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen. | $135,000 |
| Aug 26, 2021 | Completed final sign-off Mar 2022 | 1401 43rd Av | less than 50% repair permit for existing rear exterior stairway. replace 7 existing pressure treated treads with new.Details
less than 50% repair permit for existing rear exterior stairway. replace 7 existing pressure treated treads with new. | $500 |
| Sep 21, 2018 | Never finaled issued Oct 2018, no final | 194 Howth St | interior remodel: kitchen, bathroom, bedroom, interior staircase, (n0 laundry closet. removal of (e) wall btw liv & fam rmDetails
interior remodel: kitchen, bathroom, bedroom, interior staircase, (n0 laundry closet. removal of (e) wall btw liv & fam rm | $70,000 |
| May 7, 2015 | Completed final sign-off Mar 2016 | 1928 Santiago St | add 2 bedrooms, 1 bath, 1 family room on 1/f, add skylight at interior staircase on 2/f, replace foundation from west property line.Details
add 2 bedrooms, 1 bath, 1 family room on 1/f, add skylight at interior staircase on 2/f, replace foundation from west property line. | $25,000 |
| Mar 1, 2012 | Never finaled issued Mar 2012, no final | 51 Encanto Av | 1/f- convert (e) unconditioned space to conditioned bedroom & bath. 2/f- remodel (e) kitchen, remove staircase, (n) staircase, (n) windows, remove (e) sunroom, (n) deck, demolition work, structural, electrical & mechancialDetails
1/f- convert (e) unconditioned space to conditioned bedroom & bath. 2/f- remodel (e) kitchen, remove staircase, (n) staircase, (n) windows, remove (e) sunroom, (n) deck, demolition work, structural, electrical & mechancial | $75,000 |
| Jul 8, 2008 | Completed final sign-off Feb 2010 | 1763 40th Av | horizontal & vertical additin, extend 1/f (340sq.ft.) includes bathroom & bedroom, alternate family room. add 3/f (700 sq.ft.)includes 2 bedrooms, 1 bathroom & staircase. all works need electrical,plumbing & carpetary work.Details
horizontal & vertical additin, extend 1/f (340sq.ft.) includes bathroom & bedroom, alternate family room. add 3/f (700 sq.ft.)includes 2 bedrooms, 1 bathroom & staircase. all works need electrical,plumbing & carpetary work. | $130,000 |
| Oct 31, 2007 | Completed final sign-off Jan 2008 | 1574 48th Av | repair stair steps at the back of the building. replace a window 6'x5'. replacement in kind. not visible from street. repair stairs in kind, under 50% over 50% repair will require plans.Details
repair stair steps at the back of the building. replace a window 6'x5'. replacement in kind. not visible from street. repair stairs in kind, under 50% over 50% repair will require plans. | $1,000 |
| Nov 4, 2004 | Completed final sign-off Dec 2004 | 1409 43rd Av | rebuilt rear stair for two units bldg rebuilt required 2nd means of egress in kindDetails
rebuilt rear stair for two units bldg rebuilt required 2nd means of egress in kind | $9,000 |
| Jun 21, 2004 | Never finaled issued Jun 2004, no final | 1403 43rd Av | rebuild rear stair, refer to pa 200404151403Details
rebuild rear stair, refer to pa 200404151403 | $3,500 |
| Apr 15, 2004 | Completed final sign-off Jul 2004 | 1403 43rd Av | use pressure heated woods to replace or repair the rotten stairs at the back of the unit; work lessDetails
use pressure heated woods to replace or repair the rotten stairs at the back of the unit; work less | $3,500 |