Back to kitchen remodel contractors
L H Gao Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Sep 2000 to Jul 2026
- Last 24 months
- 5 permits filed
73 permits since 2000: 56 completed, 1 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 13 completed, 4 never finaled. Typically 10 days from filing to permit and 293 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2024 | Completed final sign-off Aug 2025 | 1139 Bay St | replace (12) alum windows at front facade at second and third floors with new wood insert windows. no change to openings or exterior trim. at 1141 bay st (top floor) remodel kitchen, remodel 1/2 bath.Details
replace (12) alum windows at front facade at second and third floors with new wood insert windows. no change to openings or exterior trim. at 1141 bay st (top floor) remodel kitchen, remodel 1/2 bath. | $96,500 |
| Aug 14, 2023 | Completed final sign-off Nov 2024 | 173 Alpine Tr | kitchen and bath remodel in kind. no changes to walls or openings all new fixtures and finishesDetails
kitchen and bath remodel in kind. no changes to walls or openings all new fixtures and finishes | $53,000 |
| Jul 25, 2022 | Completed final sign-off Apr 2023 | 38 Allston Wy | 1/f:remove (e) interior non-load bearing wall between kitchen and dining. remodel (e) kitchen. remodel all (e) bathrooms with new fixture and finishes in same location.Details
1/f:remove (e) interior non-load bearing wall between kitchen and dining. remodel (e) kitchen. remodel all (e) bathrooms with new fixture and finishes in same location. | $80,000 |
| Dec 20, 2021 | Completed final sign-off Feb 2026 | 127 08th Av | remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen.Details
remodel front and rear facades with new windows, doors, siding and trim. demolish existing rear breakfast room and full bath at 2nd fl, and constuct new breakfast room, full bath, exterior deck and stairs to grade. project also includes interior remodel of kitchen. | $135,000 |
| Oct 14, 2020 | Completed final sign-off Jan 2022 | 1955 Turk St | interior alteration: remove & replace kitchen appliances, countertops cabinets, and finishes. (n) layout. convert (e) laundry utilities & bedroom closets into (n) full bath & closets. convert (e) wc into (n) closet. remove replace (e) fixtures & finishes in bathroom. add (n) toilet in (e) bathroom.Details
interior alteration: remove & replace kitchen appliances, countertops cabinets, and finishes. (n) layout. convert (e) laundry utilities & bedroom closets into (n) full bath & closets. convert (e) wc into (n) closet. remove replace (e) fixtures & finishes in bathroom. add (n) toilet in (e) bathroom. | $55,000 |
| Oct 25, 2019 | Completed final sign-off Aug 2020 | 1554 Jackson St | 2nd flr - interior remodel of unit 1554 (e) kitchen & bath. add 1 (n) bath & add (n) laundry closet. remove and replace (e) flooring. remove & replace (e) wall & ceiling finishes.Details
2nd flr - interior remodel of unit 1554 (e) kitchen & bath. add 1 (n) bath & add (n) laundry closet. remove and replace (e) flooring. remove & replace (e) wall & ceiling finishes. | $65,000 |
| Sep 21, 2018 | Never finaled issued Oct 2018, no final | 194 Howth St | interior remodel: kitchen, bathroom, bedroom, interior staircase, (n0 laundry closet. removal of (e) wall btw liv & fam rmDetails
interior remodel: kitchen, bathroom, bedroom, interior staircase, (n0 laundry closet. removal of (e) wall btw liv & fam rm | $70,000 |
| Jul 10, 2018 | Completed final sign-off Nov 2018 | 1942 Vicente St | interior remodel: convert (e) dining room into (n) bedroom; create (n) opening into (e) kitchen.Details
interior remodel: convert (e) dining room into (n) bedroom; create (n) opening into (e) kitchen. | $10,000 |
| Apr 26, 2017 | Completed final sign-off Nov 2021 | 14 White St | remodel (e) 1st & 2nd flr. add (n) 3rd story. home shall be (2) bedrooms, 2.5 baths, living, dining, kitchen & (2) car tandem garage.Details
remodel (e) 1st & 2nd flr. add (n) 3rd story. home shall be (2) bedrooms, 2.5 baths, living, dining, kitchen & (2) car tandem garage. | $620,000 |
| Feb 9, 2015 | Completed final sign-off Sep 2015 | 1427 24th Av | 1st floor: convert extg space to have a bedroom, a guest room, a family room, and 2 full baths. in 2nd floor: remodel extg kitchen and add a powder room.Details
1st floor: convert extg space to have a bedroom, a guest room, a family room, and 2 full baths. in 2nd floor: remodel extg kitchen and add a powder room. | $48,000 |
| Jun 18, 2014 | Completed final sign-off Jun 2015 | 746 38th Av | in 2/f: remodel (e) kitchen, bathroom, convert (e) half bath into a full bath.Details
in 2/f: remodel (e) kitchen, bathroom, convert (e) half bath into a full bath. | $25,000 |
| Mar 26, 2014 | Completed final sign-off Jun 2014 | 2259 38th Av | 2nd floor: remodel extg kitchen and bathroom. add new bath room. upgrade (e) elec panelDetails
2nd floor: remodel extg kitchen and bathroom. add new bath room. upgrade (e) elec panel | $28,000 |
| Jul 24, 2012 | Completed final sign-off Sep 2012 | 1215 Pacific Av | #101- interior remodel only to include no structural work, replace (e) bathroom fixtures, flooring, wall tiles & wall board with new. replace (e) kitchen fixtures, appliances, flooring, cabinets, counter top with new. install new gfci outlets in (e) bathroom & kitchen. paint walls & ceiling.Details
#101- interior remodel only to include no structural work, replace (e) bathroom fixtures, flooring, wall tiles & wall board with new. replace (e) kitchen fixtures, appliances, flooring, cabinets, counter top with new. install new gfci outlets in (e) bathroom & kitchen. paint walls & ceiling. | $7,000 |
| Apr 24, 2012 | Never finaled issued Jun 2012, no final | 1960 Hayes St | unit #1 -interior remodel only-demolition of (e) den, storage space, 2 bathrooms, closets, kitchen & concrete guardrail. install new framing, finishes, new ceiling framing & finishes. new den, storage space, 2 bathrooms, closets, kitchen. new lighting, plubming & guardrailDetails
unit #1 -interior remodel only-demolition of (e) den, storage space, 2 bathrooms, closets, kitchen & concrete guardrail. install new framing, finishes, new ceiling framing & finishes. new den, storage space, 2 bathrooms, closets, kitchen. new lighting, plubming & guardrail | $65,000 |
| Mar 1, 2012 | Never finaled issued Mar 2012, no final | 51 Encanto Av | 1/f- convert (e) unconditioned space to conditioned bedroom & bath. 2/f- remodel (e) kitchen, remove staircase, (n) staircase, (n) windows, remove (e) sunroom, (n) deck, demolition work, structural, electrical & mechancialDetails
1/f- convert (e) unconditioned space to conditioned bedroom & bath. 2/f- remodel (e) kitchen, remove staircase, (n) staircase, (n) windows, remove (e) sunroom, (n) deck, demolition work, structural, electrical & mechancial | $75,000 |
| Apr 19, 2011 | Completed final sign-off Aug 2011 | 635 38th Av | kitchen alteration/remodel.remove extg finishes, appliances and fixtures. new finishes, appliances and fixtures. new lighting, replace extg windows and door with new windows (not visible from street)Details
kitchen alteration/remodel.remove extg finishes, appliances and fixtures. new finishes, appliances and fixtures. new lighting, replace extg windows and door with new windows (not visible from street) | $25,000 |
| Mar 5, 2008 | Never finaled issued Mar 2008, no final | 673 03rd Av | replace plaster on walls and ceiling with sheet rock, add insulation. change toilet room to laundry. remodel bath rooms. remodel kitchen. add storage room. modify closet doors in bedrooms. all work in unit 673, 2nd floor new stoage room not for sleeping unhabitablespace interior work onlyDetails
replace plaster on walls and ceiling with sheet rock, add insulation. change toilet room to laundry. remodel bath rooms. remodel kitchen. add storage room. modify closet doors in bedrooms. all work in unit 673, 2nd floor new stoage room not for sleeping unhabitablespace interior work only | $20,000 |