Back to bathroom remodel contractors
Kwan Wo Ironworks Inc
- Based in
- Hayward
- On San Francisco permits
- Feb 2014 to Sep 2018
- Last 24 months
- 0 permits filed
28 permits since 2000: 14 completed, 14 never finaled.
Of the 14 never-finaled permits, 1 is 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 9 completed, 9 never finaled. Typically 15 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2016 | Completed final sign-off Feb 2017 | 500 Stanyan St | unit #103 on the 2nd floor - remodel existing bathroom, existing kitchen, add washer & dryer. n/a maher ordinanceDetails
unit #103 on the 2nd floor - remodel existing bathroom, existing kitchen, add washer & dryer. n/a maher ordinance | $24,000 |
| Jul 29, 2016 | Completed final sign-off Apr 2017 | 990 Geary St | remodel unit 301 - 3rd flr. remodel (e) bathroom & kitchen, add washer & dryer. n/a maher ord. 155-13Details
remodel unit 301 - 3rd flr. remodel (e) bathroom & kitchen, add washer & dryer. n/a maher ord. 155-13 | $35,000 |
| Aug 14, 2015 | Never finaled issued Aug 2015, no final | 1870 Pacific Av | unit 705, interior renovation within (e) building to include: relocation & remodel of (e) kitchen and bathroom 7 addition of den and bathroom and washer & ventless dryerDetails
unit 705, interior renovation within (e) building to include: relocation & remodel of (e) kitchen and bathroom 7 addition of den and bathroom and washer & ventless dryer | $50,000 |
| Jul 15, 2015 | Completed final sign-off Aug 2017 | 520 Buchanan St | unit 2 -relocate and remodel kitchen and bath, add bedroom,add washer dryerDetails
unit 2 -relocate and remodel kitchen and bath, add bedroom,add washer dryer | $30,000 |
| Jul 2, 2015 | Completed final sign-off Oct 2015 | 124 Mason St | #601: electrical repair, light fixtures (all led's). kitchen/bathroom fixture, kitchen remodel. no changes to layout. exh fan to remain.Details
#601: electrical repair, light fixtures (all led's). kitchen/bathroom fixture, kitchen remodel. no changes to layout. exh fan to remain. | $15,000 |
| Jun 16, 2015 | Completed final sign-off Nov 2015 | 1520 Gough St | unit 406: relocate kitchen and remodel bath, add a bedroomDetails
unit 406: relocate kitchen and remodel bath, add a bedroom | $30,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 947 Bush St | unit #111: grnd flr: remodel kitchen and addition of new dishwasher. addition of new washer/dryer, remodel (e) bathroom.Details
unit #111: grnd flr: remodel kitchen and addition of new dishwasher. addition of new washer/dryer, remodel (e) bathroom. | $30,000 |
| May 18, 2015 | Never finaled issued Jun 2015, no final | 1126 Bush St | remodel 6th floor/unit # 603: relocate key plan, addition of new dishwasher, relocate the bathroom, addition of new washer & dryer. maher naDetails
remodel 6th floor/unit # 603: relocate key plan, addition of new dishwasher, relocate the bathroom, addition of new washer & dryer. maher na | $30,000 |
| Apr 1, 2015 | Completed final sign-off Aug 2015 | 1520 Gough St | unit #504 - 5th floor: relocate kitchen fixtures & cabinets, remodel kitchen & bathroom, add new bedroom & closets. upgrade ele & plumb fixtures, rerouting elec & plumb as nec maher - not req'dDetails
unit #504 - 5th floor: relocate kitchen fixtures & cabinets, remodel kitchen & bathroom, add new bedroom & closets. upgrade ele & plumb fixtures, rerouting elec & plumb as nec maher - not req'd | $13,000 |
| Mar 24, 2015 | Never finaled issued Apr 2015, no final | 1126 Bush St | unit # 605 - 6th floor: renovation of (e) one-bed apt. in (e) bld to include relocation and remodel of kitchen and bathroom. the addition of 1 bedroom and addition of ventless washer/dryer. all renovation not to exceed (e) envelope. maher - not req'd sprinklers under seperate permit onlyDetails
unit # 605 - 6th floor: renovation of (e) one-bed apt. in (e) bld to include relocation and remodel of kitchen and bathroom. the addition of 1 bedroom and addition of ventless washer/dryer. all renovation not to exceed (e) envelope. maher - not req'd sprinklers under seperate permit only | $10,000 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 969 Bush St | remodel unit 405 & 406: relocate kitchen and remodel kitchen. remodel bathroom, add new w/d in both units. n/a maher ord. 155-13Details
remodel unit 405 & 406: relocate kitchen and remodel kitchen. remodel bathroom, add new w/d in both units. n/a maher ord. 155-13 | $25,000 |
| Mar 12, 2015 | Completed final sign-off Jul 2015 | 726 Bush St | #101- remodel kitchen & bathroom in kind. interior work only. n/a ordinace #155-13.Details
#101- remodel kitchen & bathroom in kind. interior work only. n/a ordinace #155-13. | $10,000 |
| Jul 25, 2014 | Never finaled issued Aug 2014, no final | 795 Pine St | remodel of unit #2. relocation of kitchen and bathroom in kind.Details
remodel of unit #2. relocation of kitchen and bathroom in kind. | $9,000 |
| Jul 23, 2014 | Never finaled issued Sep 2014, no final | 520 Buchanan St | all work done in unit # 14. remove & add interior walls. remodel bath. relocate kitchen. (n) bedroom. add washer/dryer. new lighting to modified spaces.Details
all work done in unit # 14. remove & add interior walls. remodel bath. relocate kitchen. (n) bedroom. add washer/dryer. new lighting to modified spaces. | $25,000 |
| Apr 30, 2014 | Never finaled issued May 2014, no final | 520 Buchanan St | all work in unit #4: remove and add interior walls. remodel bath, relocate kitchen. convert extg kitchen into new bedroom. add washer and dryer. lighting to modified spaces.Details
all work in unit #4: remove and add interior walls. remodel bath, relocate kitchen. convert extg kitchen into new bedroom. add washer and dryer. lighting to modified spaces. | $35,000 |
| Apr 9, 2014 | Completed final sign-off Oct 2014 | 555 Eddy St | unit #8: remove and add interior walls. remodel kitchen and bath.add washer and dryer. in-fill vent shaft window in hallway. new lighting to modified spaces.Details
unit #8: remove and add interior walls. remodel kitchen and bath.add washer and dryer. in-fill vent shaft window in hallway. new lighting to modified spaces. | $35,000 |
| Mar 11, 2014 | Completed final sign-off Jul 2014 | 555 Eddy St | #3- replace existing plumbing fixtures & electrical fixtures with new, replace cabinet cabinet with new, replace tiles in bathroom, replace hardwood floor, paint.Details
#3- replace existing plumbing fixtures & electrical fixtures with new, replace cabinet cabinet with new, replace tiles in bathroom, replace hardwood floor, paint. | $10,000 |
| Feb 18, 2014 | Never finaled issued Mar 2014, no final | 520 Buchanan St | all work done in unit #24, remove/add interior walls, remodel bath, relocate kitchen, add washer/dyer, new lighting to modified spaces.Details
all work done in unit #24, remove/add interior walls, remodel bath, relocate kitchen, add washer/dyer, new lighting to modified spaces. | $35,000 |