Kudos
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Dec 2016
- Last 24 months
- 0 permits filed
46 permits since 2000: 44 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2016 | Completed final sign-off Jun 2017 | 4282 25th St | at front exterior stairs replace tread and risers. replace landing deck. no change to stair walls and guardrail. correct bottom concrete step. scope of work less than 50% change and all work in-kind.Details
at front exterior stairs replace tread and risers. replace landing deck. no change to stair walls and guardrail. correct bottom concrete step. scope of work less than 50% change and all work in-kind. | $8,000 |
| Jun 29, 2016 | Completed final sign-off Jan 2017 | 4282 25th St | remodel (e) top floor: 2 bedrooms, bathroom, wall and stairway. no structurual or changes to windows. instlal 5/8 drywalls type x for all exposed wall. insulate wall & ceiling, rewire as necessassy approx 500sf. no wall alt/mod of (e) framing. 500sf.Details
remodel (e) top floor: 2 bedrooms, bathroom, wall and stairway. no structurual or changes to windows. instlal 5/8 drywalls type x for all exposed wall. insulate wall & ceiling, rewire as necessassy approx 500sf. no wall alt/mod of (e) framing. 500sf. | $18,000 |
| Nov 23, 2010 | Never finaled issued Jan 2013, no final | 4226 22nd St | build 2 floor horizontal addition of 9'-4" at frt of bldg. build new bathrm, rebuild stairs & install new windows.repair foundation & dryrot.bolt plates to foundation @ rear. new roof. install new hot water & gas heater & flues. relocate roof drains, electric service, gas meter & building sewer.Details
build 2 floor horizontal addition of 9'-4" at frt of bldg. build new bathrm, rebuild stairs & install new windows.repair foundation & dryrot.bolt plates to foundation @ rear. new roof. install new hot water & gas heater & flues. relocate roof drains, electric service, gas meter & building sewer. | $150,000 |
| Dec 21, 2005 | Completed final sign-off Feb 2006 | 2106 22nd St | replace treads and decking jof (e) struture of stairs and landing.replace lower landing and stringers to street less than 50% being replacedDetails
replace treads and decking jof (e) struture of stairs and landing.replace lower landing and stringers to street less than 50% being replaced | $5,000 |
| Jul 29, 2002 | Completed final sign-off Feb 2003 | 44 Surrey St | remodel 1st flr bathrm,restore stair configuration bet 1st & basementDetails
remodel 1st flr bathrm,restore stair configuration bet 1st & basement | $15,000 |
| Jul 31, 2001 | Completed final sign-off May 2002 | 174 Naglee Av | bedrm & bathrm at lower level, 2 new doors and windows, open stair at hall & skylightDetails
bedrm & bathrm at lower level, 2 new doors and windows, open stair at hall & skylight | $40,000 |