Back to bathroom remodel contractors
Kudos
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Dec 2016
- Last 24 months
- 0 permits filed
46 permits since 2000: 44 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2016 | Completed final sign-off Jan 2017 | 4282 25th St | remodel (e) top floor: 2 bedrooms, bathroom, wall and stairway. no structurual or changes to windows. instlal 5/8 drywalls type x for all exposed wall. insulate wall & ceiling, rewire as necessassy approx 500sf. no wall alt/mod of (e) framing. 500sf.Details
remodel (e) top floor: 2 bedrooms, bathroom, wall and stairway. no structurual or changes to windows. instlal 5/8 drywalls type x for all exposed wall. insulate wall & ceiling, rewire as necessassy approx 500sf. no wall alt/mod of (e) framing. 500sf. | $18,000 |
| Jun 17, 2016 | Completed final sign-off Dec 2016 | 75 Folsom St | remodel hall bath, relocate shower mixer, provide new vanity & countertop, install corian shower surround. n/a ordinance #155-13Details
remodel hall bath, relocate shower mixer, provide new vanity & countertop, install corian shower surround. n/a ordinance #155-13 | $15,000 |
| Mar 16, 2015 | Completed final sign-off Jan 2016 | 4226 22nd St | relocate kitchen & bathroom, level floor, replace 6 windows and install 1 new with insulated glass. relocaate hwh-e-e1 sub panel. all drywall 5/8" type x. structural work. dry rot repairs as needed.Details
relocate kitchen & bathroom, level floor, replace 6 windows and install 1 new with insulated glass. relocaate hwh-e-e1 sub panel. all drywall 5/8" type x. structural work. dry rot repairs as needed. | $25,000 |
| Jan 20, 2012 | Completed final sign-off Jun 2012 | 3401 Folsom St | provide for new bedroom and bathroom inside existing ground floor. provide seperation hall wall from garage. relocate laundry, replace furance, move exterior door and provide landings per drawing. install 3 new windows.Details
provide for new bedroom and bathroom inside existing ground floor. provide seperation hall wall from garage. relocate laundry, replace furance, move exterior door and provide landings per drawing. install 3 new windows. | $30,000 |
| Mar 30, 2011 | Completed final sign-off Nov 2011 | 716 Douglass St | add bathroom with window and closet, laundry in kitchen. add attic ladder to storage. add lighting and receptacles. replace front windows in kind and bedroom wndws. remove dropped cieling and hall & bedroom #2. remove wood burning fire place.Details
add bathroom with window and closet, laundry in kitchen. add attic ladder to storage. add lighting and receptacles. replace front windows in kind and bedroom wndws. remove dropped cieling and hall & bedroom #2. remove wood burning fire place. | $40,000 |
| Feb 18, 2009 | Completed final sign-off Nov 2009 | 170 Upland Dr | replace 23 wndws and 1 sliding door same size and location. remodel kchn bathroom & 1/2 bath. replace rear deck less then 3 ft.dryrot repair. to comply with t-24.repair gutter. plmbg and electrical upgrade.Details
replace 23 wndws and 1 sliding door same size and location. remodel kchn bathroom & 1/2 bath. replace rear deck less then 3 ft.dryrot repair. to comply with t-24.repair gutter. plmbg and electrical upgrade. | $80,000 |
| Feb 23, 2007 | Completed final sign-off Apr 2008 | 716 Douglass St | remodel kchn, bathroom, build propertyline wall to mount new electrical service. replace gas line hot water heater and furnace. replace front door and 2 wndw to provide egress at bedroom 1 wndw at front for siting room. wndw and door u-factor max= 0.67Details
remodel kchn, bathroom, build propertyline wall to mount new electrical service. replace gas line hot water heater and furnace. replace front door and 2 wndw to provide egress at bedroom 1 wndw at front for siting room. wndw and door u-factor max= 0.67 | $35,000 |
| Jul 12, 2006 | Completed final sign-off Dec 2006 | 336 Parnassus Av | remodel 1 bathroom upgrade tub + plumbing fixtures and new lighting within unit #336.Details
remodel 1 bathroom upgrade tub + plumbing fixtures and new lighting within unit #336. | $15,000 |
| May 31, 2006 | Completed final sign-off Dec 2006 | 338 Parnassus Av | remodel (e) kitchen. remodel (e) 1 bathroom, install forced air heat, new ducts at 2nd floor hvac no structuralDetails
remodel (e) kitchen. remodel (e) 1 bathroom, install forced air heat, new ducts at 2nd floor hvac no structural | $35,000 |
| Jul 14, 2005 | Completed final sign-off Dec 2005 | 3401 Folsom St | remodel existing top flr switche location gf move tub & vanity, remodel existing half bath on 1st flDetails
remodel existing top flr switche location gf move tub & vanity, remodel existing half bath on 1st fl | $50,000 |
| Oct 20, 2003 | Completed final sign-off Mar 2004 | 442 Gold Mine Dr | remodel 2 bathroom plumbing fixtures & add ceiling light no structural workDetails
remodel 2 bathroom plumbing fixtures & add ceiling light no structural work | $10,000 |
| Jun 30, 2003 | Completed final sign-off Mar 2004 | 442 Gold Mine Dr | remodel bathroom, laundry, and bedroom. add showr and bath to bathrm,move laundry sink and reconfiguDetails
remodel bathroom, laundry, and bedroom. add showr and bath to bathrm,move laundry sink and reconfigu | $30,000 |