Kudos
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Dec 2016
- Last 24 months
- 0 permits filed
46 permits since 2000: 44 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2015 | Completed final sign-off Jan 2016 | 4226 22nd St | relocate kitchen & bathroom, level floor, replace 6 windows and install 1 new with insulated glass. relocaate hwh-e-e1 sub panel. all drywall 5/8" type x. structural work. dry rot repairs as needed.Details
relocate kitchen & bathroom, level floor, replace 6 windows and install 1 new with insulated glass. relocaate hwh-e-e1 sub panel. all drywall 5/8" type x. structural work. dry rot repairs as needed. | $25,000 |
| Jun 25, 2012 | Completed final sign-off Jun 2013 | 513 Liberty St | repair dry rot at rear. replace rear exterior wall and deck in kind. less than 50% . bolt and sheathe front and rear basement walls where accessible . fremdial framing. total 20 lin ft. rpelace kitchen floor, hot tubDetails
repair dry rot at rear. replace rear exterior wall and deck in kind. less than 50% . bolt and sheathe front and rear basement walls where accessible . fremdial framing. total 20 lin ft. rpelace kitchen floor, hot tub | $25,000 |
| Mar 30, 2011 | Completed final sign-off Nov 2011 | 716 Douglass St | add bathroom with window and closet, laundry in kitchen. add attic ladder to storage. add lighting and receptacles. replace front windows in kind and bedroom wndws. remove dropped cieling and hall & bedroom #2. remove wood burning fire place.Details
add bathroom with window and closet, laundry in kitchen. add attic ladder to storage. add lighting and receptacles. replace front windows in kind and bedroom wndws. remove dropped cieling and hall & bedroom #2. remove wood burning fire place. | $40,000 |
| Apr 15, 2010 | Completed final sign-off Jun 2010 | 2929 Webster St | replace kitchen cabinets, countertop sink and flooring. replace shower control. no new lighting. no structural work.Details
replace kitchen cabinets, countertop sink and flooring. replace shower control. no new lighting. no structural work. | $8,000 |
| Jul 2, 2008 | Completed final sign-off Mar 2009 | 1815 35th Av | remodel kitchen. remove non bearing wall between kitchen and dining room. replace galvanized water pressure pipes and drain lines. upgrade electrical service. replace existing windows.replace 10 windows same size locationDetails
remodel kitchen. remove non bearing wall between kitchen and dining room. replace galvanized water pressure pipes and drain lines. upgrade electrical service. replace existing windows.replace 10 windows same size location | $40,000 |
| Mar 30, 2007 | Completed final sign-off Apr 2008 | 716 Douglass St | rev pa#200702234788 permit#1112590. install new slab & stgructure to provide minumum ceiling ht and rear yard access. replace windows at kitchen and storage area. relocate front entry door to provide window for light and ventilation.Details
rev pa#200702234788 permit#1112590. install new slab & stgructure to provide minumum ceiling ht and rear yard access. replace windows at kitchen and storage area. relocate front entry door to provide window for light and ventilation. | $40,000 |
| Sep 22, 2006 | Completed final sign-off May 2007 | 174 Naglee Av | remodel existing kitchen, move gas & sink. replace 2 front windows in kind. flare ceiling at existing lightwell, replace kitchen door with pocket door. provide pass through between kitchen & dining room. no structural changes.Details
remodel existing kitchen, move gas & sink. replace 2 front windows in kind. flare ceiling at existing lightwell, replace kitchen door with pocket door. provide pass through between kitchen & dining room. no structural changes. | $40,000 |
| May 31, 2006 | Completed final sign-off Dec 2006 | 338 Parnassus Av | remodel (e) kitchen. remodel (e) 1 bathroom, install forced air heat, new ducts at 2nd floor hvac no structuralDetails
remodel (e) kitchen. remodel (e) 1 bathroom, install forced air heat, new ducts at 2nd floor hvac no structural | $35,000 |
| Jan 17, 2006 | Completed final sign-off Jun 2006 | 2619 16th Av | remodel kitchen, replace 2 windows in lightwell, provide electrical sub panel: basement, move plumbing.Details
remodel kitchen, replace 2 windows in lightwell, provide electrical sub panel: basement, move plumbing. | $35,000 |
| Oct 9, 2001 | Completed final sign-off Oct 2001 | 2929 Webster St | replace rear window & door @ kitchen, replacement in kind, tempered glass, not visible from streetDetails
replace rear window & door @ kitchen, replacement in kind, tempered glass, not visible from street | $1,000 |
| Mar 28, 2000 | Completed final sign-off May 2001 | 832 Clayton St | remodel (e) kitchen & breakfast room, replace piers w/ footing at property lineDetails
remodel (e) kitchen & breakfast room, replace piers w/ footing at property line | $55,000 |