Back to bathroom remodel contractors
Kong's Plumbing & Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- May 2000 to Aug 2023
- Last 24 months
- 0 permits filed
80 permits since 2000: 62 completed, 7 never finaled, 11 expired or cancelled.
Of the 7 never-finaled permits, 4 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
48 bathroom remodel permits: 41 completed, 2 never finaled, 5 expired or cancelled. Typically 7 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2022 | Completed final sign-off Jan 2023 | 27 Seville St | g/f: reconfigure bath, add kitchenette and non bearing partition wall. ref to pa#202201115764.Details
g/f: reconfigure bath, add kitchenette and non bearing partition wall. ref to pa#202201115764. | $3,000 |
| Jan 11, 2022 | Completed final sign-off Jan 2023 | 27 Seville St | add 2 bedrooms, 1 bath, 1 gym room, 1 media room @ ground floor; add 1 bath @ 2nd floorDetails
add 2 bedrooms, 1 bath, 1 gym room, 1 media room @ ground floor; add 1 bath @ 2nd floor | $50,888 |
| Aug 26, 2019 | Completed final sign-off Jan 2023 | 27 Seville St | remodel bathroom & kitchen: fully demolish (e) bathroom, kitchen caibnets, and counter top, partial living ceiling dryall damgne by roof leak.Details
remodel bathroom & kitchen: fully demolish (e) bathroom, kitchen caibnets, and counter top, partial living ceiling dryall damgne by roof leak. | $6,000 |
| Dec 27, 2018 | Completed final sign-off Apr 2019 | 2600 Van Ness Av | #303: rehabilitate (e) bathroom. rehabilitate (e) kitchen. install washer/dryer.Details
#303: rehabilitate (e) bathroom. rehabilitate (e) kitchen. install washer/dryer. | $28,000 |
| Oct 26, 2018 | Completed final sign-off Mar 2019 | 1660 Bay St | unit # 303 convert (e) dining/kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install w/dDetails
unit # 303 convert (e) dining/kitchen to bedroom. relocate kitchen. rehabilitate (e) bathroom. install second bathroom. install w/d | $45,000 |
| Sep 19, 2018 | Completed final sign-off Jan 2019 | 1690 North Point St | #303- rehabilitate kitchen, rehabilitate (e) bathroom. install w/d maher naDetails
#303- rehabilitate kitchen, rehabilitate (e) bathroom. install w/d maher na | $38,000 |
| Sep 19, 2018 | Completed final sign-off Jan 2019 | 1690 North Point St | #202 -rehabilitate (e) kitchen, rehabilitate(e) bathroom. install w/d maher naDetails
#202 -rehabilitate (e) kitchen, rehabilitate(e) bathroom. install w/d maher na | $33,000 |
| Sep 7, 2018 | Completed final sign-off Feb 2019 | 2600 Van Ness Av | unit 202 - rehabilitate (e) bathroom and kitchen. install washer/dryerDetails
unit 202 - rehabilitate (e) bathroom and kitchen. install washer/dryer | $35,000 |
| Aug 3, 2018 | Completed final sign-off Dec 2018 | 1660 Bay St | unit 101 convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer dryer maher not reqDetails
unit 101 convert e kitchen to bedroom, relocate kitchen, rehabilitate e bath, install washer dryer maher not req | $38,000 |
| Jul 9, 2018 | Completed final sign-off Oct 2018 | 2975 Van Ness Av | apt #9: rehabilitate (e) bathroom. install washer / dryer. maher n/a.Details
apt #9: rehabilitate (e) bathroom. install washer / dryer. maher n/a. | $18,000 |
| Jul 9, 2018 | Completed final sign-off Nov 2018 | 2600 Van Ness Av | unit#403 rehabilitate (e) bathroom. inatall w/dDetails
unit#403 rehabilitate (e) bathroom. inatall w/d | $17,000 |
| Jun 7, 2018 | Completed final sign-off Nov 2018 | 1690 North Point St | unit 304 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 304 - convert existing kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $40,000 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 1690 North Point St | unit #102: 1)rehabilitate extg kitchen, 2) rehabilitate extg bathroom. 3)install washer/dryer.convert e dining rm into bedroom n/a for maherDetails
unit #102: 1)rehabilitate extg kitchen, 2) rehabilitate extg bathroom. 3)install washer/dryer.convert e dining rm into bedroom n/a for maher | $34,000 |
| Jan 18, 2018 | Completed final sign-off Jul 2018 | 621 Stockton St | unit #203 - rehabilitate (e) kitchen & bathroom. install w/d maher naDetails
unit #203 - rehabilitate (e) kitchen & bathroom. install w/d maher na | $34,000 |
| Jan 3, 2018 | Completed final sign-off Apr 2018 | 835 Pine St | #14 - rehabiliate (e) kitchen & bathroom. install w/d maher naDetails
#14 - rehabiliate (e) kitchen & bathroom. install w/d maher na | $27,000 |
| Nov 3, 2017 | Completed final sign-off Apr 2018 | 621 Stockton St | unit 403 rehabilitate existing kitchen, existing bath,install washer dryerDetails
unit 403 rehabilitate existing kitchen, existing bath,install washer dryer | $20,000 |
| Aug 30, 2017 | Completed final sign-off Apr 2018 | 328 Stanyan St | unit #328: convert living rm to bedroom, relocate living rm, rehabilitate (e) kitchen & bath, install half bath, install washer and dryer. maher naDetails
unit #328: convert living rm to bedroom, relocate living rm, rehabilitate (e) kitchen & bath, install half bath, install washer and dryer. maher na | $46,000 |
| Jul 24, 2017 | Completed final sign-off Dec 2017 | 50 Laguna St | #509: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. maher naDetails
#509: convert (e) kitchen to bedroom, relocate kitchen, rehabilitate (e) bathroom, install washer & dryer. maher na | $36,000 |
| Jun 29, 2017 | Completed final sign-off Nov 2017 | 1690 North Point St | unit 104 - convert existing kitchen to bedroom; rehabilitate existing kitchen and bathroom. install washer & dryerDetails
unit 104 - convert existing kitchen to bedroom; rehabilitate existing kitchen and bathroom. install washer & dryer | $40,000 |
| Mar 28, 2017 | Completed final sign-off Apr 2018 | 621 Stockton St | revision to 201505085823 unit #301 - penthouse: rehabilitate and relocate (e) bathrooms. rehabilitate (e) bedrooms. relocate (e) kitchen. install washer and dryer. maher naDetails
revision to 201505085823 unit #301 - penthouse: rehabilitate and relocate (e) bathrooms. rehabilitate (e) bedrooms. relocate (e) kitchen. install washer and dryer. maher na | |
| Feb 21, 2017 | Completed final sign-off Nov 2017 | 322 Stanyan St | unit 322, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher.Details
unit 322, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher. | $48,000 |
| Feb 21, 2017 | Completed final sign-off Nov 2017 | 332 Stanyan St | unit 332, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher.Details
unit 332, 1st floor - convert (e) kitchen into bedroom, relocate kitchen & living room, rehabilitate (e) bathroom, install second bathroom, install washer & dryer. n/a for maher. | $48,000 |
| Nov 3, 2016 | Completed final sign-off Apr 2017 | 1690 North Point St | unit #203 - 3rd flr, remodel (e) bathroom w/exhaust fan. relocate (e) kitchen. convert (e) dining to bedroom. add w/dDetails
unit #203 - 3rd flr, remodel (e) bathroom w/exhaust fan. relocate (e) kitchen. convert (e) dining to bedroom. add w/d | $30,000 |
| Oct 11, 2016 | Completed final sign-off Mar 2017 | 1690 North Point St | unit 201, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) dining room to bedroom, add washer & dryerDetails
unit 201, 3rd floor - remodel (e) bathroom, relocate (e) kitchen, convert (e) dining room to bedroom, add washer & dryer | $25,000 |
| Oct 7, 2016 | Completed final sign-off Mar 2017 | 1690 North Point St | 3rd floor unit #205: remodel (e) kitchen, bathroom. convert (e) dining room to bedroom. add bathroom. add w/dDetails
3rd floor unit #205: remodel (e) kitchen, bathroom. convert (e) dining room to bedroom. add bathroom. add w/d | $50,000 |
| Aug 4, 2016 | Completed final sign-off Nov 2016 | 50 Laguna St | unit #307 on the 3rd floor - remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a maher ordinanceDetails
unit #307 on the 3rd floor - remodel existing bathroom, relocate existing kitchen, add washer & dryer. n/a maher ordinance | $20,000 |
| Apr 22, 2016 | Completed final sign-off Aug 2016 | 140 Duboce Av | unit #203 at 3rd floor: remodel extg bathroom. remodel extg kitchen, and add washer and dryer.Details
unit #203 at 3rd floor: remodel extg bathroom. remodel extg kitchen, and add washer and dryer. | $25,000 |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 50 Laguna St | remodel unit 208 @ 3rdfloor, remodel existing bathroom, relocated & remodel existing kitchen, convert existing kitchen into bedroom. add washer and dryer. maher naDetails
remodel unit 208 @ 3rdfloor, remodel existing bathroom, relocated & remodel existing kitchen, convert existing kitchen into bedroom. add washer and dryer. maher na | $30,000 |
| Oct 2, 2015 | Completed final sign-off Feb 2016 | 50 Laguna St | unit #104: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. convert studio to 1 bedroom apartment. maher naDetails
unit #104: remodel unit at 2nd floor: remodel (e) bathroom, relocate and remodel (e) kitchen, add washer & dryer. convert studio to 1 bedroom apartment. maher na | $20,000 |
| Sep 4, 2015 | Completed final sign-off Feb 2016 | 50 Laguna St | unit #502 - 6th floor - remodel exisitng bathroom, relocate & remodel existing kitchen, add den, add washer & dryer.Details
unit #502 - 6th floor - remodel exisitng bathroom, relocate & remodel existing kitchen, add den, add washer & dryer. | $30,000 |
| Jul 15, 2015 | Completed final sign-off Oct 2016 | 1222 25th Av | revision to app#201408083419. relocate extg hall and master bath at 3rd floor. create new study at 3rd floor.Details
revision to app#201408083419. relocate extg hall and master bath at 3rd floor. create new study at 3rd floor. | $35,000 |
| Jun 5, 2015 | Completed final sign-off Nov 2015 | 2405 Anza St | remove (e) kitchen cabinet & counter tops. replace (n) kitchen cabinet & counter top. remove (e) bathroom tile, fixtures & faucet. replace (n) bathroom tilet, new fixtures & faucets. new electrical & plumbing. interior painting.Details
remove (e) kitchen cabinet & counter tops. replace (n) kitchen cabinet & counter top. remove (e) bathroom tile, fixtures & faucet. replace (n) bathroom tilet, new fixtures & faucets. new electrical & plumbing. interior painting. | $15,000 |
| Feb 13, 2015 | Completed final sign-off Jun 2015 | 325 09th Av | #1- remodel of kitchen, bathroom & add w/d.Details
#1- remodel of kitchen, bathroom & add w/d. | $30,000 |
| Oct 9, 2014 | Completed final sign-off Feb 2015 | 381 Turk St | #105: remove kitchen cabinet, bathroom fixture, tile & floor. install new kitchen cabinet, counter top & new bathroom fixture & tile, new electrical outlet, switches & light.Details
#105: remove kitchen cabinet, bathroom fixture, tile & floor. install new kitchen cabinet, counter top & new bathroom fixture & tile, new electrical outlet, switches & light. | $18,000 |
| Apr 23, 2014 | Completed final sign-off Oct 2014 | 1750 Golden Gate Av | 1)remodel unit #6: 2) add a new bedroom and 2 closets, new laundry outlet.3) relocating of kitchen fixture and cabinets. 4)remodeling of bathroom. 5)plumbing and electrical under seperate permit.Details
1)remodel unit #6: 2) add a new bedroom and 2 closets, new laundry outlet.3) relocating of kitchen fixture and cabinets. 4)remodeling of bathroom. 5)plumbing and electrical under seperate permit. | $20,000 |
| Apr 8, 2014 | Expired or cancelled cancelled Jan 2026 | 320 Hearst Av | revision to appl #2014.0318.0993: reconfigure 3rd floor bathroom.Details
revision to appl #2014.0318.0993: reconfigure 3rd floor bathroom. | |
| Mar 18, 2014 | Completed final sign-off Jun 2014 | 320 Hearst Av | demolish wall between office & family room. remodel & resize 3rd floor bathroom.Details
demolish wall between office & family room. remodel & resize 3rd floor bathroom. | $6,000 |
| Nov 29, 2012 | Expired or cancelled expired Apr 2025 | 1958 47th Av | rear addition for master bedroom, master bath, living room and study.Details
rear addition for master bedroom, master bath, living room and study. | $80,000 |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 650 Florida St | space "d" construct & install ada bathroom. ref pa #200509084197.Details
space "d" construct & install ada bathroom. ref pa #200509084197. | $8,000 |
| Aug 2, 2010 | Completed final sign-off Jan 2011 | 650 Florida St | install accessible bathroom wall, fixture & demising wall. install wall to cover plumbing pipe, refernece pa #200509284197. for 3-bathrooms.Details
install accessible bathroom wall, fixture & demising wall. install wall to cover plumbing pipe, refernece pa #200509284197. for 3-bathrooms. | $12,000 |
| Jun 28, 2010 | Expired or cancelled cancelled Jan 2026 | 101 Campbell Av | revision to 201006073926: add new bathroom at bedroom 2 on 2nd floorDetails
revision to 201006073926: add new bathroom at bedroom 2 on 2nd floor | $6,500 |
| Jun 7, 2010 | Completed final sign-off Feb 2011 | 101 Campbell Av | remodel kitchen on ground floor. remodel study on basement floor. add full bath on basement floor. remodel bath on 2nd flDetails
remodel kitchen on ground floor. remodel study on basement floor. add full bath on basement floor. remodel bath on 2nd fl | $18,000 |
| Dec 23, 2009 | Completed final sign-off Apr 2010 | 20 15th Av | revision to appl.#200911181588. second & third flr.: hall bath room change shower & vanity location, kitchen remove small wall. first flr.: change bedroom doorway & missed one window on the exterior wall as original house plans.Details
revision to appl.#200911181588. second & third flr.: hall bath room change shower & vanity location, kitchen remove small wall. first flr.: change bedroom doorway & missed one window on the exterior wall as original house plans. | |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 20 15th Av | remodel the 2/fl & 3/fl. kitchen & 2 bathroom. such as damage new cabinet, new tile, new painting etc. rebuilt new rooms and new bathroom on basement.Details
remodel the 2/fl & 3/fl. kitchen & 2 bathroom. such as damage new cabinet, new tile, new painting etc. rebuilt new rooms and new bathroom on basement. | $65,000 |
| Jul 27, 2009 | Completed final sign-off Oct 2009 | 5636 California St | remodel existing kitchen & bathroom, including new cabinets, toilet, wash basin, new bath tub and new recess, lighting in kitchen.Details
remodel existing kitchen & bathroom, including new cabinets, toilet, wash basin, new bath tub and new recess, lighting in kitchen. | $9,000 |
| Apr 14, 2009 | Never finaled issued Apr 2009, no final | 1323 17th Av | work @ unit# 1323 & unit# 1325. remove & replace existing bath-tub, 2 toilets, 2 wash basin, kitchen cabinet & counter. repair & replace damage landing, step & some hand rail at back stairway. no structural work for both units. provide h.e. lights per title 24. exterior or interior paint.Details
work @ unit# 1323 & unit# 1325. remove & replace existing bath-tub, 2 toilets, 2 wash basin, kitchen cabinet & counter. repair & replace damage landing, step & some hand rail at back stairway. no structural work for both units. provide h.e. lights per title 24. exterior or interior paint. | $42,000 |
| Aug 19, 2002 | Expired or cancelled expired Mar 2003 | 4123 Pacheco St | repair damaged stair to basement, remove bathroom wall & flr tile repair damaged dry rot & damged woDetails
repair damaged stair to basement, remove bathroom wall & flr tile repair damaged dry rot & damged wo | $4,500 |
| Dec 28, 2000 | Expired or cancelled expired Apr 2001 | 115 Hazelwood Av | remove dry/damaged window sill for 3 bsmt wndw some damage stucco rmv/rplce floor in bsmt bathDetails
remove dry/damaged window sill for 3 bsmt wndw some damage stucco rmv/rplce floor in bsmt bath | $3,000 |