Knab Builder
- Based in
- Daly City
- On San Francisco permits
- Feb 2017 to Jun 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 32 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 6 completed, 1 in progress, 1 never finaled. Typically 416 days from filing to permit and 774 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2024 | In progress issued Apr 2025 | 2265 Union St | revision to pa# 202103025688: minor facade revisions. lightwell infill at entry stair. appliance/fixture layout changes in baths and kitchen. removal of hot tub and pool. new dormer at 4th floor over stair hall.Details
revision to pa# 202103025688: minor facade revisions. lightwell infill at entry stair. appliance/fixture layout changes in baths and kitchen. removal of hot tub and pool. new dormer at 4th floor over stair hall. | |
| Dec 20, 2022 | Completed final sign-off Oct 2024 | 1907 Lyon St | replace entry stairs at front facade to be code compliantsDetails
replace entry stairs at front facade to be code compliants | $15,000 |
| Nov 29, 2021 | Completed final sign-off Jan 2026 | 2538 Great Hy | renovate w/facade changes front/rear of house; gr/f: add bedrm, bath & laundry; build 1-hr rated corridor; 2/f: (n) primary bedrm & bath; relocated (e) kitch to 3/f; 3/f relocate kitch, convert (e) bedrm to fam rm; (n) deck @ 2/f & 3/f w/spiral stair to gradeDetails
renovate w/facade changes front/rear of house; gr/f: add bedrm, bath & laundry; build 1-hr rated corridor; 2/f: (n) primary bedrm & bath; relocated (e) kitch to 3/f; 3/f relocate kitch, convert (e) bedrm to fam rm; (n) deck @ 2/f & 3/f w/spiral stair to grade | $300,000 |
| Mar 2, 2021 | Never finaled issued Jun 2022, no final | 2265 Union St | addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suiteDetails
addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suite | $620,000 |
| Oct 11, 2019 | Completed final sign-off Feb 2023 | 1851 14th Av | create additional dwelling unit on 1st fl. adu per ord #95-17. reconfigure (e) interior stair to provide open layout on 2nd & 3rd fl. (n) 300 sq ft deck @ rear of 1st fl for open space requirement. (n) stair from 2nd fl to 1st fl adu. replace 3rd fl deck in-kindDetails
create additional dwelling unit on 1st fl. adu per ord #95-17. reconfigure (e) interior stair to provide open layout on 2nd & 3rd fl. (n) 300 sq ft deck @ rear of 1st fl for open space requirement. (n) stair from 2nd fl to 1st fl adu. replace 3rd fl deck in-kind | $150,000 |
| Jul 2, 2019 | Completed final sign-off Aug 2020 | 173 Gambier St | comply with nov 201808971, 1st fl: strngthn fndtn, relocate e stair, add 2 new bdrm,bath, relocate laundry rm, remove unpermitted rear addition, new rdwd deck 265 sq ft. 2nd fl relocate e kitchn, new int stair, remodel e bath,new rear addition balcony, upgrd elec/plumbDetails
comply with nov 201808971, 1st fl: strngthn fndtn, relocate e stair, add 2 new bdrm,bath, relocate laundry rm, remove unpermitted rear addition, new rdwd deck 265 sq ft. 2nd fl relocate e kitchn, new int stair, remodel e bath,new rear addition balcony, upgrd elec/plumb | $150,000 |
| Dec 7, 2017 | Completed final sign-off May 2020 | 869 Alvarado St | convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundationsDetails
convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundations | $600,000 |
| Oct 27, 2017 | Completed final sign-off Jun 2022 | 237 14th Av | intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights.Details
intr&extr remodel. incl conversion bsmt(g/fl)space into a living space, addition to 1st & 2nd fl.living space on west facing side of(e)bldg towards(e)backyard.add a deck on 1/fl & new balcony on 2/fl.enclosure (e)entry staircase w/ 3 skylights. | $248,000 |