Back to kitchen remodel contractors
Knab Builder
- Based in
- Daly City
- On San Francisco permits
- Feb 2017 to Jun 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 32 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 11 completed, 2 in progress, 1 never finaled. Typically 104 days from filing to permit and 405 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2024 | In progress issued Apr 2025 | 2265 Union St | revision to pa# 202103025688: minor facade revisions. lightwell infill at entry stair. appliance/fixture layout changes in baths and kitchen. removal of hot tub and pool. new dormer at 4th floor over stair hall.Details
revision to pa# 202103025688: minor facade revisions. lightwell infill at entry stair. appliance/fixture layout changes in baths and kitchen. removal of hot tub and pool. new dormer at 4th floor over stair hall. | |
| Feb 1, 2024 | In progress issued May 2024 | 1290 Fillmore St | replace kitchen exhaust fans and mua fans. replace ceiling lights in kitchen.Details
replace kitchen exhaust fans and mua fans. replace ceiling lights in kitchen. | $40,000 |
| Oct 24, 2022 | Completed final sign-off Feb 2024 | 548 Haight St | remodel of existing kitchen at private club (new equipment & finishes). no structural work. m.e.p to be defferred submittal.Details
remodel of existing kitchen at private club (new equipment & finishes). no structural work. m.e.p to be defferred submittal. | $75,000 |
| Jul 27, 2022 | Completed final sign-off Feb 2024 | 80 Benton Av | kitchen renovation at 2nd fl: new bay window, convert part of garage into family rm. add laundry and powder rm as fill in under (e) bayDetails
kitchen renovation at 2nd fl: new bay window, convert part of garage into family rm. add laundry and powder rm as fill in under (e) bay | $85,000 |
| Mar 2, 2021 | Never finaled issued Jun 2022, no final | 2265 Union St | addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suiteDetails
addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suite | $620,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2023 | 3883 17th St | remodel (e) living room, remodel (e) kitchen, remodel(e) bathroom, addition of (n) half bathroom on 2nd fl. additon of 3 (n) bedrooms on 1st fl. additon of 2 (n) bathrooms on 1st fl. additon of (n) laundry room on 1st fl. remove (e) rear deckDetails
remodel (e) living room, remodel (e) kitchen, remodel(e) bathroom, addition of (n) half bathroom on 2nd fl. additon of 3 (n) bedrooms on 1st fl. additon of 2 (n) bathrooms on 1st fl. additon of (n) laundry room on 1st fl. remove (e) rear deck | $220,000 |
| Nov 12, 2020 | Completed final sign-off Aug 2021 | 1727 Sanchez St | revision to no-plan pa# 202010025752. ground flr - add (n) media room, bedroom & bath. 1st flr - remodel kitchen & bath, convert office to bedroom, convert laundry to study. 2nd flr - remodel bath, recofigure closets & entrance to front bedroom.Details
revision to no-plan pa# 202010025752. ground flr - add (n) media room, bedroom & bath. 1st flr - remodel kitchen & bath, convert office to bedroom, convert laundry to study. 2nd flr - remodel bath, recofigure closets & entrance to front bedroom. | $312,000 |
| Oct 2, 2020 | Completed final sign-off Aug 2021 | 1727 Sanchez St | remodel existing kitchen and 2 full bathroom ( 1 downstair & 1 upstair). all work in-kind.Details
remodel existing kitchen and 2 full bathroom ( 1 downstair & 1 upstair). all work in-kind. | $10,000 |
| Jan 2, 2020 | Completed final sign-off Sep 2022 | 1170 South Van Ness Av | addition of an adu per ordinance 162-16 @ 1st flr within (e) envelope. scope of work includes: (n) kitchen, bathroom, living area, windows. excavation to accomodate ceiling height, hardscape @rear of bldg, minor improvements to units 1,2,3: (1) relocate washer/dryer, (2) relocate w/d, hvac,Details
addition of an adu per ordinance 162-16 @ 1st flr within (e) envelope. scope of work includes: (n) kitchen, bathroom, living area, windows. excavation to accomodate ceiling height, hardscape @rear of bldg, minor improvements to units 1,2,3: (1) relocate washer/dryer, (2) relocate w/d, hvac, | $135,000 |
| Sep 10, 2019 | Completed final sign-off Jul 2020 | 866 Pacheco St | renovate extg kitchen in place, renovate extg 2nd floor bath in place. add new master bath on 2nd floor. replace extg 2 kitchen windows, one unit to be replaced by patio door. replace extg water heater.Details
renovate extg kitchen in place, renovate extg 2nd floor bath in place. add new master bath on 2nd floor. replace extg 2 kitchen windows, one unit to be replaced by patio door. replace extg water heater. | $76,000 |
| May 6, 2019 | Completed final sign-off Oct 2019 | 446 Hearst Av | kitchen remodel. cabinets and counter tops only. rewire throughout as needed. replace 3 windows at thr rear of the house. install new hardwood flooring. repair the rotted siding at the rear of the house. approx 8'x8'Details
kitchen remodel. cabinets and counter tops only. rewire throughout as needed. replace 3 windows at thr rear of the house. install new hardwood flooring. repair the rotted siding at the rear of the house. approx 8'x8' | $38,000 |
| Apr 5, 2019 | Completed final sign-off Nov 2019 | 15 Peters Av | add new roof deck over (e) kitchen.Details
add new roof deck over (e) kitchen. | $8,000 |
| Dec 7, 2017 | Completed final sign-off May 2020 | 869 Alvarado St | convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundationsDetails
convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundations | $600,000 |
| Feb 7, 2017 | Completed final sign-off Jul 2020 | 311 30th St | horizontal addition of habitable space in rear yard & an internal remodel of kitchen, bathroom & laundry room. the (e) garage will be expanded. there will be no work on the front of the house.Details
horizontal addition of habitable space in rear yard & an internal remodel of kitchen, bathroom & laundry room. the (e) garage will be expanded. there will be no work on the front of the house. | $200,000 |