Back to bathroom remodel contractors
Knab Builder
- Based in
- Daly City
- On San Francisco permits
- Feb 2017 to Jun 2025
- Last 24 months
- 2 permits filed
41 permits since 2000: 32 completed, 5 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 13 completed, 1 in progress, 1 never finaled. Typically 92 days from filing to permit and 326 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2024 | In progress issued Apr 2025 | 2265 Union St | revision to pa# 202103025688: minor facade revisions. lightwell infill at entry stair. appliance/fixture layout changes in baths and kitchen. removal of hot tub and pool. new dormer at 4th floor over stair hall.Details
revision to pa# 202103025688: minor facade revisions. lightwell infill at entry stair. appliance/fixture layout changes in baths and kitchen. removal of hot tub and pool. new dormer at 4th floor over stair hall. | |
| Nov 29, 2021 | Completed final sign-off Jan 2026 | 2538 Great Hy | renovate w/facade changes front/rear of house; gr/f: add bedrm, bath & laundry; build 1-hr rated corridor; 2/f: (n) primary bedrm & bath; relocated (e) kitch to 3/f; 3/f relocate kitch, convert (e) bedrm to fam rm; (n) deck @ 2/f & 3/f w/spiral stair to gradeDetails
renovate w/facade changes front/rear of house; gr/f: add bedrm, bath & laundry; build 1-hr rated corridor; 2/f: (n) primary bedrm & bath; relocated (e) kitch to 3/f; 3/f relocate kitch, convert (e) bedrm to fam rm; (n) deck @ 2/f & 3/f w/spiral stair to grade | $300,000 |
| Mar 2, 2021 | Never finaled issued Jun 2022, no final | 2265 Union St | addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suiteDetails
addition and remodel of (e) 4 story sfh. add new garage, storage, & gym at basement level. add an elevator & new exterior stair in rear. two new bedrooms & baths on 1/f. remodel (e) 2/f living room, family room, & kitchen. remodel of bedrooms & baths on 3/f. remodel 4/f to add master bedroom suite | $620,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2023 | 3883 17th St | remodel (e) living room, remodel (e) kitchen, remodel(e) bathroom, addition of (n) half bathroom on 2nd fl. additon of 3 (n) bedrooms on 1st fl. additon of 2 (n) bathrooms on 1st fl. additon of (n) laundry room on 1st fl. remove (e) rear deckDetails
remodel (e) living room, remodel (e) kitchen, remodel(e) bathroom, addition of (n) half bathroom on 2nd fl. additon of 3 (n) bedrooms on 1st fl. additon of 2 (n) bathrooms on 1st fl. additon of (n) laundry room on 1st fl. remove (e) rear deck | $220,000 |
| Nov 12, 2020 | Completed final sign-off Aug 2021 | 1727 Sanchez St | revision to no-plan pa# 202010025752. ground flr - add (n) media room, bedroom & bath. 1st flr - remodel kitchen & bath, convert office to bedroom, convert laundry to study. 2nd flr - remodel bath, recofigure closets & entrance to front bedroom.Details
revision to no-plan pa# 202010025752. ground flr - add (n) media room, bedroom & bath. 1st flr - remodel kitchen & bath, convert office to bedroom, convert laundry to study. 2nd flr - remodel bath, recofigure closets & entrance to front bedroom. | $312,000 |
| Oct 2, 2020 | Completed final sign-off Aug 2021 | 1727 Sanchez St | remodel existing kitchen and 2 full bathroom ( 1 downstair & 1 upstair). all work in-kind.Details
remodel existing kitchen and 2 full bathroom ( 1 downstair & 1 upstair). all work in-kind. | $10,000 |
| Sep 1, 2020 | Completed final sign-off Oct 2020 | 36 Heather Av | bathroom/shower leakage repairs; new shower pan/shower controller replacement; bathroom wall water proofingDetails
bathroom/shower leakage repairs; new shower pan/shower controller replacement; bathroom wall water proofing | $15,000 |
| Jan 2, 2020 | Completed final sign-off Sep 2022 | 1170 South Van Ness Av | addition of an adu per ordinance 162-16 @ 1st flr within (e) envelope. scope of work includes: (n) kitchen, bathroom, living area, windows. excavation to accomodate ceiling height, hardscape @rear of bldg, minor improvements to units 1,2,3: (1) relocate washer/dryer, (2) relocate w/d, hvac,Details
addition of an adu per ordinance 162-16 @ 1st flr within (e) envelope. scope of work includes: (n) kitchen, bathroom, living area, windows. excavation to accomodate ceiling height, hardscape @rear of bldg, minor improvements to units 1,2,3: (1) relocate washer/dryer, (2) relocate w/d, hvac, | $135,000 |
| Sep 10, 2019 | Completed final sign-off Jul 2020 | 866 Pacheco St | renovate extg kitchen in place, renovate extg 2nd floor bath in place. add new master bath on 2nd floor. replace extg 2 kitchen windows, one unit to be replaced by patio door. replace extg water heater.Details
renovate extg kitchen in place, renovate extg 2nd floor bath in place. add new master bath on 2nd floor. replace extg 2 kitchen windows, one unit to be replaced by patio door. replace extg water heater. | $76,000 |
| Jul 2, 2019 | Completed final sign-off Aug 2020 | 173 Gambier St | comply with nov 201808971, 1st fl: strngthn fndtn, relocate e stair, add 2 new bdrm,bath, relocate laundry rm, remove unpermitted rear addition, new rdwd deck 265 sq ft. 2nd fl relocate e kitchn, new int stair, remodel e bath,new rear addition balcony, upgrd elec/plumbDetails
comply with nov 201808971, 1st fl: strngthn fndtn, relocate e stair, add 2 new bdrm,bath, relocate laundry rm, remove unpermitted rear addition, new rdwd deck 265 sq ft. 2nd fl relocate e kitchn, new int stair, remodel e bath,new rear addition balcony, upgrd elec/plumb | $150,000 |
| Jun 19, 2019 | Completed final sign-off Oct 2019 | 446 Hearst Av | ref pa# 201905069895; add partion wall between living and office space, add door at main bathroomDetails
ref pa# 201905069895; add partion wall between living and office space, add door at main bathroom | $6,500 |
| Apr 16, 2019 | Completed final sign-off Oct 2019 | 3529 21st St | convert 1/2 bathroom & remodel to become full bath at entry level (above basement level) interior remodel bathroom per plan conversion of bathtub to shower and add toilet, all new plm fixtures. ele per plan. no structural workDetails
convert 1/2 bathroom & remodel to become full bath at entry level (above basement level) interior remodel bathroom per plan conversion of bathtub to shower and add toilet, all new plm fixtures. ele per plan. no structural work | $16,000 |
| Jan 4, 2019 | Completed final sign-off Aug 2019 | 1010 Silliman St | convert existing storage on grund floor to habitable space to include 2 bedroom, 1 full bathroom, media room and laundry room. new sliding doors @ rear of buidling, new windows on the east side of property.Details
convert existing storage on grund floor to habitable space to include 2 bedroom, 1 full bathroom, media room and laundry room. new sliding doors @ rear of buidling, new windows on the east side of property. | $65,000 |
| Dec 7, 2017 | Completed final sign-off May 2020 | 869 Alvarado St | convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundationsDetails
convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundations | $600,000 |
| Feb 7, 2017 | Completed final sign-off Jul 2020 | 311 30th St | horizontal addition of habitable space in rear yard & an internal remodel of kitchen, bathroom & laundry room. the (e) garage will be expanded. there will be no work on the front of the house.Details
horizontal addition of habitable space in rear yard & an internal remodel of kitchen, bathroom & laundry room. the (e) garage will be expanded. there will be no work on the front of the house. | $200,000 |