Back to kitchen remodel contractors
Klep Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Feb 2026
- Last 24 months
- 1 permit filed
18 permits since 2000: 15 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 in progress, 1 never finaled. Typically 2 days from filing to permit and 398 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2026 | In progress filed Feb 2026, not yet issued | 388 Byxbee St | legalization of an existing, unpermitted accessory dwelling unit (adu) located at the ground floor, approximately 750 sqft. scope of work includes as built documentation of existing kitchen, bathroom, sleeping area, and independant access. no expansion of building envelope.Details
legalization of an existing, unpermitted accessory dwelling unit (adu) located at the ground floor, approximately 750 sqft. scope of work includes as built documentation of existing kitchen, bathroom, sleeping area, and independant access. no expansion of building envelope. | $5,000 |
| Dec 23, 2021 | Completed final sign-off Sep 2023 | 2151 Sacramento St | unit #4: remodel (2)(e) baths @ 1st fl, add cabinetry @ kitchen island & replace toilet @ 2nd fl, replace 2nd fl rear doors @ deck. add glass guardrails @ (e) rear 2nd fl roof deck, reconfigure ground fl storage area w/ (n) wine storage space. remove fire escape @ rear from 2nd fl to 1st fl onlyDetails
unit #4: remodel (2)(e) baths @ 1st fl, add cabinetry @ kitchen island & replace toilet @ 2nd fl, replace 2nd fl rear doors @ deck. add glass guardrails @ (e) rear 2nd fl roof deck, reconfigure ground fl storage area w/ (n) wine storage space. remove fire escape @ rear from 2nd fl to 1st fl only | $75,000 |
| Jul 19, 2019 | Completed final sign-off Feb 2020 | 144 Coleridge St | unit 144: reconfigure living/dinging/kitchen areas at 2nd flr. renovate (e) bath and add new 2nd bath area & closet at bedrooms all within (e) units, replace furnace & ductsDetails
unit 144: reconfigure living/dinging/kitchen areas at 2nd flr. renovate (e) bath and add new 2nd bath area & closet at bedrooms all within (e) units, replace furnace & ducts | $60,000 |
| Dec 28, 2018 | Completed final sign-off Feb 2020 | 146 Coleridge St | renovate extg kitchen and extg bath, reconfigure laundry area and bedroom #3 to add 2nd bath.Details
renovate extg kitchen and extg bath, reconfigure laundry area and bedroom #3 to add 2nd bath. | $40,000 |
| Mar 29, 2016 | Completed final sign-off Aug 2017 | 1339 Oak St | remodel of upper flat, remodel kitchen move sink, new counters, cabinets, new lighting. new bath with new plumbing for toilet, shower, sink. engineered alterations of walls, new lighting, 2 gas heating units to replace existing.Details
remodel of upper flat, remodel kitchen move sink, new counters, cabinets, new lighting. new bath with new plumbing for toilet, shower, sink. engineered alterations of walls, new lighting, 2 gas heating units to replace existing. | $60,000 |
| Nov 4, 2015 | Completed final sign-off Nov 2015 | 3300 Scott St | #304: replace kitchen cabinets & counter top & tiling.Details
#304: replace kitchen cabinets & counter top & tiling. | $15,000 |
| Oct 1, 2013 | Never finaled issued Oct 2013, no final | 550 Davis St | unit #44: replace kitchen cabinet & counter top, demo 2 storage closet on 1/f, remodel master bathroom with new tile, double sink, relocate toilet bowl to opposite side of bathroom.Details
unit #44: replace kitchen cabinet & counter top, demo 2 storage closet on 1/f, remodel master bathroom with new tile, double sink, relocate toilet bowl to opposite side of bathroom. | $15,000 |