Klep Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Feb 2026
- Last 24 months
- 1 permit filed
18 permits since 2000: 15 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 106 days from filing to permit and 532 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2021 | Completed final sign-off Sep 2023 | 2151 Sacramento St | unit #4: remodel (2)(e) baths @ 1st fl, add cabinetry @ kitchen island & replace toilet @ 2nd fl, replace 2nd fl rear doors @ deck. add glass guardrails @ (e) rear 2nd fl roof deck, reconfigure ground fl storage area w/ (n) wine storage space. remove fire escape @ rear from 2nd fl to 1st fl onlyDetails
unit #4: remodel (2)(e) baths @ 1st fl, add cabinetry @ kitchen island & replace toilet @ 2nd fl, replace 2nd fl rear doors @ deck. add glass guardrails @ (e) rear 2nd fl roof deck, reconfigure ground fl storage area w/ (n) wine storage space. remove fire escape @ rear from 2nd fl to 1st fl only | $75,000 |