Block 0171, lot 061
550 Davis St
- City’s use
- Single Family Residential
- Built
- 1981
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,520 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 1, 2017 | Completed final sign-off Dec 2017 | 550 Davis St | Klep Construction Inc. | to obtain a final inspection for work approved under pa#201310018167. all work is complete. maher n/a.Details
to obtain a final inspection for work approved under pa#201310018167. all work is complete. maher n/a. | |
| Jul 29, 2015 | Completed final sign-off Oct 2015 | 550 Davis St | Jb Builders | remove (e) fireplace, patch & paint drywall as nec.install (n) heating system with separate mech permit. add (n)plugs to (e) circuits, (n) elec circuit to (n) heater.Details
remove (e) fireplace, patch & paint drywall as nec.install (n) heating system with separate mech permit. add (n)plugs to (e) circuits, (n) elec circuit to (n) heater. | $7,000 |
| Oct 1, 2013 | Never finaled issued Oct 2013, no final | 550 Davis St | Klep Construction Inc. | unit #44: replace kitchen cabinet & counter top, demo 2 storage closet on 1/f, remodel master bathroom with new tile, double sink, relocate toilet bowl to opposite side of bathroom.Details
unit #44: replace kitchen cabinet & counter top, demo 2 storage closet on 1/f, remodel master bathroom with new tile, double sink, relocate toilet bowl to opposite side of bathroom. | $15,000 |
| Jun 23, 2011 | Completed final sign-off Feb 2012 | 550 Davis St | Ziarno Custom Builder | unit#44. inte. partitions and doors btw bedrooms and common areas on 1st and 2nd fl. (n) closed guardrail at loft. (n) doors/doorways in 1st and 2nd fl bathrooms. (e) elctrical distribution panel relocated from 2nd to 1st floor. (n) closets on 1st and 2nd fl, (n) recessed lighting throughout.Details
unit#44. inte. partitions and doors btw bedrooms and common areas on 1st and 2nd fl. (n) closed guardrail at loft. (n) doors/doorways in 1st and 2nd fl bathrooms. (e) elctrical distribution panel relocated from 2nd to 1st floor. (n) closets on 1st and 2nd fl, (n) recessed lighting throughout. | $4,000 |
| May 2, 2011 | Completed final sign-off May 2011 | 550 Davis St | Warm Solutions / American Chimney Svcs | restrap wood burning flue @ top of chimney to meet proper clearances.Details
restrap wood burning flue @ top of chimney to meet proper clearances. | $649 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Klep Construction Inc. (2), Jb Builders, Warm Solutions / American Chimney Svcs, Ziarno Custom Builder
- Architects
- A. Gordon Atkinson (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.